Rex Asibuodu Ugulu
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Rex Asibuodu Ugulu has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Stephen Allen
Univ Witwatersrand, Dept Construct Econ & Management, Johannesburg, South Africa
2 shared publications - Andrew Oyen Arewa
Engineering and Construction Department, School of Architecture Computing and Engineering, Docklands Campus, University of East London, London, UK
1 shared publication - Mohd Azwarie Mat Dzahir
Department of Quantity Surveying, Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81310 Johor Bahru, Johor, Malaysia
1 shared publication Olusegun Ajayi
1 shared publication- Sarajul Fikri Mohamed
Department of Quantity Surveying, Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81310 Johor Bahru, Johor, Malaysia
1 shared publication Stephen Allen
School of Construction Economics and Management, the University of Witwatersrand, 1 Jan Smuts Avenue, Braamfontein, Johannesburg 2000, South Africa
1 shared publication
Latest Publications
- Open Access
- 3 October 2022
- Published by International Council for Research and Innovation in Building and Construction in Journal of Information Technology in Construction
- Vol. 27 (42) , 864-883
Acceptance of contemporary technologies for cost management of construction projects
The construction industry has become more digital and the traditional methods of construction activities are gradually becoming outdated. In this era of digital construction, various information and communication technologies have been developed and deployed to the site for the management and control of construction activities including cost management. Irrespective of the benefits of adopting these technologies, most of them are still not readily accepted for use for construction management. This study articulated Seven (7) recent technologies driving the industry and evaluated their acceptance for cost management of construction projects. The technologies include mobile technology, Augmented/Virtual Reality (AR/VR), Building Information Modeling (BIM), Internet of Things (IoT), Autonomous Equipment (Drones and Robotics), Artificial Intelligence (AI), and Predictive Analytics (PA). Data was gathered using a restructured questionnaire and technology acceptance model analysis was performed to identify which of the technologies have higher acceptance for cost management based on the criteria of availability, affordability, frequency of use, usefulness for cost management, and acceptance in the industry. Test statistics using Spearman’s correlations and Kendall’s correlations for each of the technologies and Spearman’s Correlations of Technology acceptance with other variables in the TAM Model were performed. The results showed that mobile technology has higher correlation values than other technologies, and therefore has a higher acceptance for cost management. Kendall’s coefficient of concordance values and Spearman’s correlation values for Mobile technology were all above 0.6 which indicates a high level of agreement among the raters and strong relationships between the compared TAM variables.
- 3 October 2022
- Published by International Council for Research and Innovation in Building and Construction in Journal of Information Technology in Construction
- Vol. 27 (42) , 864-883
Open AccessAcceptance of contemporary technologies for cost management of construction projects
The construction industry has become more digital and the traditional methods of construction activities are gradually becoming outdated. In this era of digital construction, various information and communication technologies have been developed and deployed to the site for the management and control of construction activities including cost management. Irrespective of the benefits of adopting these technologies, most of them are still not readily accepted for use for construction management. This study articulated Seven (7) recent technologies driving the industry and evaluated their acceptance for cost management of construction projects. The technologies include mobile technology, Augmented/Virtual Reality (AR/VR), Building Information Modeling (BIM), Internet of Things (IoT), Autonomous Equipment (Drones and Robotics), Artificial Intelligence (AI), and Predictive Analytics (PA). Data was gathered using a restructured questionnaire and technology acceptance model analysis was performed to identify which of the technologies have higher acceptance for cost management based on the criteria of availability, affordability, frequency of use, usefulness for cost management, and acceptance in the industry. Test statistics using Spearman’s correlations and Kendall’s correlations for each of the technologies and Spearman’s Correlations of Technology acceptance with other variables in the TAM Model were performed. The results showed that mobile technology has higher correlation values than other technologies, and therefore has a higher acceptance for cost management. Kendall’s coefficient of concordance values and Spearman’s correlation values for Mobile technology were all above 0.6 which indicates a high level of agreement among the raters and strong relationships between the compared TAM variables.
- Open Access
- 6 May 2020
- Published by IntechOpen
Measuring Infrastructure Skills Productivity
This chapter presents the concept and meaning of construction productivity and the techniques used in measuring workforce skills productivity in the construction industry. There are three major methods highlighted for monitoring and measuring productivity in the construction industry. The first relates to visual recording that requires taught watchers to be available on location to monitor and record work by specialists. The second is the physical recording technique which involves a direct surveillance technique that includes a qualified observer observing the site for the full duration of the working day operation using the work study method or work measurement. This method was typically illustrated with the application of regression model and learning curve theory to improve labour productivity. The third measuring technique discussed is the use of questionnaires and interview survey which involves information gathering through an interview with supervisors and workers working in the construction industry. Finally, the chapter discussed how infrastructure productivity can be improved through effective supervision, material management and supply chain management, project front-end planning (loading) and work face planning, training and certification of workforce and labour management and relations.
- 6 May 2020
- Published by IntechOpen
Open AccessMeasuring Infrastructure Skills Productivity
This chapter presents the concept and meaning of construction productivity and the techniques used in measuring workforce skills productivity in the construction industry. There are three major methods highlighted for monitoring and measuring productivity in the construction industry. The first relates to visual recording that requires taught watchers to be available on location to monitor and record work by specialists. The second is the physical recording technique which involves a direct surveillance technique that includes a qualified observer observing the site for the full duration of the working day operation using the work study method or work measurement. This method was typically illustrated with the application of regression model and learning curve theory to improve labour productivity. The third measuring technique discussed is the use of questionnaires and interview survey which involves information gathering through an interview with supervisors and workers working in the construction industry. Finally, the chapter discussed how infrastructure productivity can be improved through effective supervision, material management and supply chain management, project front-end planning (loading) and work face planning, training and certification of workforce and labour management and relations.
- 10 May 2018
- Published by Emerald Publishing in Built Environment Project and Asset Management
- Vol. 8 (3) , 267-280
Using the learning curve theory in the investigation of on-site craft gangs’ blockwork construction productivity
The purpose of this paper is to investigate how on-site blockwork craft gangs’ learning impacts productivity within the production environment on-site to optimise their productivity. The research is adopting a quantitative method with the observation of seven craft gangs’ blockwork with an average of five members in each gang, using the learning curve model application in a 17-storey tri-tower construction project in Nigeria. The linear regression method was employed in the analysis stage of this study using labour-recorded productivity time input as the dependent variables. The paper provides empirical insights about the significance of on-site craft gangs’ learning. The overall blockwork craft gangs learning observed at the site level shows an average learning rate of 94.21 per cent resulting in 5.79 per cent improvement gains. Due to the nature of the study and the research question, the observations in this research study were limited to FCDA construction project in Nigeria. The limitation of this scenario is that the research results may lack generalisability. Therefore, there is the need for further study on the learning rate. This research study includes the implications for the development of on-site blockwork craft gangs learning; the significant impact of learning rate of 94.21 per cent resulting in 5.79 per cent improvement gain can be used in the planning and to fast track the productivity of craft gangs’ construction. This paper identified the need to improve construction productivity through craft gangs’ on-site learning with the application of the learning curve theory.
- 10 May 2018
- Published by Emerald Publishing in Built Environment Project and Asset Management
- Vol. 8 (3) , 267-280
Using the learning curve theory in the investigation of on-site craft gangs’ blockwork construction productivity
The purpose of this paper is to investigate how on-site blockwork craft gangs’ learning impacts productivity within the production environment on-site to optimise their productivity. The research is adopting a quantitative method with the observation of seven craft gangs’ blockwork with an average of five members in each gang, using the learning curve model application in a 17-storey tri-tower construction project in Nigeria. The linear regression method was employed in the analysis stage of this study using labour-recorded productivity time input as the dependent variables. The paper provides empirical insights about the significance of on-site craft gangs’ learning. The overall blockwork craft gangs learning observed at the site level shows an average learning rate of 94.21 per cent resulting in 5.79 per cent improvement gains. Due to the nature of the study and the research question, the observations in this research study were limited to FCDA construction project in Nigeria. The limitation of this scenario is that the research results may lack generalisability. Therefore, there is the need for further study on the learning rate. This research study includes the implications for the development of on-site blockwork craft gangs learning; the significant impact of learning rate of 94.21 per cent resulting in 5.79 per cent improvement gain can be used in the planning and to fast track the productivity of craft gangs’ construction. This paper identified the need to improve construction productivity through craft gangs’ on-site learning with the application of the learning curve theory.
- Open Access
- 5 October 2017
- Published by Elsevier in Data in Brief
- Vol. 15, 419-426
Dataset on Investigating the role of onsite learning in the optimisation of craft gang's productivity in the construction industry
- 5 October 2017
- Published by Elsevier in Data in Brief
- Vol. 15, 419-426
Open AccessDataset on Investigating the role of onsite learning in the optimisation of craft gang's productivity in the construction industry