Arman Hazrathosseini
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Arman Hazrathosseini has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Ali Moradi Afrapoli
Department of Mining Engineering, University of Kentucky, Lexington, USA
4 shared publications Abbas Taheri
The Robert M. Buchan Department of Mining, Queen’s University, Kingston, Canada
1 shared publication- Abbas Taheri
Robert M. Buchan Department of Mining, Queen’s University, Kingston, ON K7L 3N6, Canada
1 shared publication Adel Taheri
Department of Mining Projects, Sazehkav Private Joint Stock Company, Dehbid, Iran
1 shared publication- Eyman Hazrathoseyni
Amirkabir University of Technology
1 shared publication Saeed Mahdevari
Isfahan University of Technology
1 shared publication
Latest Publications
- 11 August 2026
- Published by Springer Nature in Geotechnical and Geological Engineering
- Vol. 44 (6) , 338
Machine Learning and Cyber Physical Systems for Rock Mass Classification: A Critical Review
- 11 August 2026
- Published by Springer Nature in Geotechnical and Geological Engineering
- Vol. 44 (6) , 338
Machine Learning and Cyber Physical Systems for Rock Mass Classification: A Critical Review
- Open Access
- 1 May 2026
- Published by KEAI Publishing in Deep Resources Engineering
Application of soft computing methods in underground mine stability: A PRISMA-based systematic review
- 1 May 2026
- Published by KEAI Publishing in Deep Resources Engineering
Open AccessApplication of soft computing methods in underground mine stability: A PRISMA-based systematic review
- 15 September 2025
- Published by SAGE Publications in Mining Technology: Transactions of the Institutions of Mining and Metallurgy
- Vol. 134 (4) , 263-273
Bridging gaps in intelligent truck dispatching: An underexplored PPO-based model with expanded feature integration within open pit mines
The mining industry is increasingly adopting intelligent systems to address challenges such as declining ore grades, rising operational costs and sustainability demands. This study presents a Proximal Policy Optimisation (PPO)-based truck dispatching model designed to enhance operational efficiency in open-pit mining. Addressing two key research gaps – limited integration of dispatching features and underutilisation of advanced reinforcement learning (RL) algorithms – the proposed model incorporates 19 critical features and is evaluated against the conventional Fixed Schedule (FS) method. A discrete event simulation environment was developed to emulate an open pit case study with heterogeneous trucks and shovels. The PPO model demonstrated convergence within 3.5 h and outperformed the FS baseline across multiple key performance indicators, including a 5.7% increase in total production, 4.2% improvement in plant delivery, and 13.2% higher truck utilisation. Compared to widely used RL algorithms in this domain, the PPO approach achieved faster convergence despite handling a more complex feature set. These findings highlight the potential of PPO as a robust and scalable solution for intelligent dispatching, offering practical benefits for Mining 4.0 initiatives.
- 15 September 2025
- Published by SAGE Publications in Mining Technology: Transactions of the Institutions of Mining and Metallurgy
- Vol. 134 (4) , 263-273
Bridging gaps in intelligent truck dispatching: An underexplored PPO-based model with expanded feature integration within open pit mines
The mining industry is increasingly adopting intelligent systems to address challenges such as declining ore grades, rising operational costs and sustainability demands. This study presents a Proximal Policy Optimisation (PPO)-based truck dispatching model designed to enhance operational efficiency in open-pit mining. Addressing two key research gaps – limited integration of dispatching features and underutilisation of advanced reinforcement learning (RL) algorithms – the proposed model incorporates 19 critical features and is evaluated against the conventional Fixed Schedule (FS) method. A discrete event simulation environment was developed to emulate an open pit case study with heterogeneous trucks and shovels. The PPO model demonstrated convergence within 3.5 h and outperformed the FS baseline across multiple key performance indicators, including a 5.7% increase in total production, 4.2% improvement in plant delivery, and 13.2% higher truck utilisation. Compared to widely used RL algorithms in this domain, the PPO approach achieved faster convergence despite handling a more complex feature set. These findings highlight the potential of PPO as a robust and scalable solution for intelligent dispatching, offering practical benefits for Mining 4.0 initiatives.
- 12 December 2024
- Published by SAGE Publications in Mining Technology: Transactions of the Institutions of Mining and Metallurgy
- Vol. 134 (1) , 3-14
An intelligent rule-based decision-making system for preliminary truck dispatching within open-pit mines
Preliminary truck dispatching involves directing trucks to appropriate destinations before addressing specific optimization objectives such as maximizing ore production or minimizing waiting times. While rule-based systems are commonly used for preliminary dispatching, they lack adaptability to unforeseen scenarios. This study presents an intelligent rule-based system that integrates reinforcement learning to generate labeled data and supervised learning to train a deep neural network on the collected data. A modified Q-learning algorithm, RapidQ, was introduced to expedite the data collection process. The system was implemented in a simulated open-pit mine case study, which incorporated a broader range of dispatching features that are underexplored but essential compared to previous studies. The simulation was designed to handle uncertainties such as weather conditions, blasting needs, truck and shovel failures, and maintenance schedules. When evaluated against a conventional rule-based system, the proposed intelligent dispatching system achieved 10 times fewer incorrect dispatches, 4% fuel savings, a 10% reduction in queuing time, and a 14% increase in ore production. The developed system can be positioned as a potential upper-stage solution in future multi-stage intelligent dispatching systems, complemented by specific dispatching algorithms at the lower stage.
- 12 December 2024
- Published by SAGE Publications in Mining Technology: Transactions of the Institutions of Mining and Metallurgy
- Vol. 134 (1) , 3-14
An intelligent rule-based decision-making system for preliminary truck dispatching within open-pit mines
Preliminary truck dispatching involves directing trucks to appropriate destinations before addressing specific optimization objectives such as maximizing ore production or minimizing waiting times. While rule-based systems are commonly used for preliminary dispatching, they lack adaptability to unforeseen scenarios. This study presents an intelligent rule-based system that integrates reinforcement learning to generate labeled data and supervised learning to train a deep neural network on the collected data. A modified Q-learning algorithm, RapidQ, was introduced to expedite the data collection process. The system was implemented in a simulated open-pit mine case study, which incorporated a broader range of dispatching features that are underexplored but essential compared to previous studies. The simulation was designed to handle uncertainties such as weather conditions, blasting needs, truck and shovel failures, and maintenance schedules. When evaluated against a conventional rule-based system, the proposed intelligent dispatching system achieved 10 times fewer incorrect dispatches, 4% fuel savings, a 10% reduction in queuing time, and a 14% increase in ore production. The developed system can be positioned as a potential upper-stage solution in future multi-stage intelligent dispatching systems, complemented by specific dispatching algorithms at the lower stage.
- Open Access
Maximizing Mining Operations: Unlocking the Crucial Role of Intelligent Fleet Management Systems in Surface Mining’s Value Chain
On the one side, the operational expenses of mining enterprises are showing an upward trend; and on the other side, conventional mining fleet management systems (FMSs) are falling short in addressing the high-dimensionality, stochasticity, and autonomy needed in increasingly complex operations. These major drivers for change have convinced researchers to search for alternatives including artificial-intelligence-enabled algorithms recommended by Mining 4.0. The present study endeavors to scrutinize this transition from a business management point of view. In other words, a literature review is carried out to gain insight into the evolutionary trajectory of mining FMSs and the need for intelligent algorithms. Afterward, a holistic supply chain layout and then a detailed value chain diagram are depicted to meticulously inspect the effect of technological advancements on FMSs and subsequently the profit margin. The proposed value-chain diagram is advantageous in explaining the economic justification of such intelligent systems, illustratively, for shareholders in the industry. Moreover, it will show new research directions for mining scholars.
Open AccessMaximizing Mining Operations: Unlocking the Crucial Role of Intelligent Fleet Management Systems in Surface Mining’s Value Chain
On the one side, the operational expenses of mining enterprises are showing an upward trend; and on the other side, conventional mining fleet management systems (FMSs) are falling short in addressing the high-dimensionality, stochasticity, and autonomy needed in increasingly complex operations. These major drivers for change have convinced researchers to search for alternatives including artificial-intelligence-enabled algorithms recommended by Mining 4.0. The present study endeavors to scrutinize this transition from a business management point of view. In other words, a literature review is carried out to gain insight into the evolutionary trajectory of mining FMSs and the need for intelligent algorithms. Afterward, a holistic supply chain layout and then a detailed value chain diagram are depicted to meticulously inspect the effect of technological advancements on FMSs and subsequently the profit margin. The proposed value-chain diagram is advantageous in explaining the economic justification of such intelligent systems, illustratively, for shareholders in the industry. Moreover, it will show new research directions for mining scholars.
- 10 November 2023
- Published by Springer Nature in Mining, Metallurgy & Exploration
- Vol. 40 (6) , 2087-2106
Intelligent Fleet Management Systems in Surface Mining: Status, Threats, and Opportunities
- 10 November 2023
- Published by Springer Nature in Mining, Metallurgy & Exploration
- Vol. 40 (6) , 2087-2106
Intelligent Fleet Management Systems in Surface Mining: Status, Threats, and Opportunities
- 5 December 2022
- Published by Elsevier in Resources Policy
- Vol. 80
The advent of digital twins in surface mining: Its time has finally arrived
- 5 December 2022
- Published by Elsevier in Resources Policy
- Vol. 80
The advent of digital twins in surface mining: Its time has finally arrived
- 1 January 2022
- Published by Faculty of Mining, Geology and Petroleum Engineering in Rudarsko-geološko-naftni zbornik
- Vol. 37 (3) , 43-53
SELECTION OF THE SAFETY RISK ANALYSIS TECHNIQUE MOST COMPATIBLE WITH NATURE, REQUIREMENTS AND RESOURCES OF MINING PROJECTS USING AN INTEGRATED FOLCHI-AHP METHOD
There are numerous safety risk analysis techniques. Moreover, no ideal method exists for all companies; hence, the selection of the method most congruous with nature of the intended project, as well as the needs and resources of a mining company is o...
- 1 January 2022
- Published by Faculty of Mining, Geology and Petroleum Engineering in Rudarsko-geološko-naftni zbornik
- Vol. 37 (3) , 43-53
SELECTION OF THE SAFETY RISK ANALYSIS TECHNIQUE MOST COMPATIBLE WITH NATURE, REQUIREMENTS AND RESOURCES OF MINING PROJECTS USING AN INTEGRATED FOLCHI-AHP METHOD
There are numerous safety risk analysis techniques. Moreover, no ideal method exists for all companies; hence, the selection of the method most congruous with nature of the intended project, as well as the needs and resources of a mining company is o...
- 8 February 2021
- Published by SAGE Publications in Mining Technology: Transactions of the Institutions of Mining and Metallurgy
- Vol. 130 (2) , 101-108
Modification of orientation-dependency limitation for BQD index measured from exploratory drill cores in stone quarries (a case study)
Various indices, notably rock quality designation (RQD), weighted joint density (WJD), and block quality designation (BQD) have been introduced by researchers to survey joints in boreholes, each with its own advantages and disadvantages. The idea of combining WJD and BQD to use positive features of both formed the main goal of the current study, leading to the definition of an improved BQD . After joint surveys of cores drilled in Kulikosh Marble Quarry, Iran, linear regressions validated by statistical tests showed that BQD is less dependent on the drilling direction than the RQD. An empirical equation was also obtained as , with the help of which one can estimate the value of by measuring the original BQD . Taking into account the joint orientations, is logically closer to reality whereby mining engineers can assess block productivity of stone quarries more accurately.- 8 February 2021
- Published by SAGE Publications in Mining Technology: Transactions of the Institutions of Mining and Metallurgy
- Vol. 130 (2) , 101-108
Modification of orientation-dependency limitation for BQD index measured from exploratory drill cores in stone quarries (a case study)
Various indices, notably rock quality designation (RQD), weighted joint density (WJD), and block quality designation (BQD) have been introduced by researchers to survey joints in boreholes, each with its own advantages and disadvantages. The idea of combining WJD and BQD to use positive features of both formed the main goal of the current study, leading to the definition of an improved BQD . After joint surveys of cores drilled in Kulikosh Marble Quarry, Iran, linear regressions validated by statistical tests showed that BQD is less dependent on the drilling direction than the RQD. An empirical equation was also obtained as , with the help of which one can estimate the value of by measuring the original BQD . Taking into account the joint orientations, is logically closer to reality whereby mining engineers can assess block productivity of stone quarries more accurately.- 1 November 2018
- Published by Elsevier in Journal of Building Engineering
- Vol. 20, 585-594
Applicability quality assessment of dimension stones for service in the buildings (A new approach using a mathematical model and fuzzy logic)
- 1 November 2018
- Published by Elsevier in Journal of Building Engineering
- Vol. 20, 585-594
Applicability quality assessment of dimension stones for service in the buildings (A new approach using a mathematical model and fuzzy logic)