TTTu Tu

Tu Tu

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Tu Tu has a total of 4 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Synergic integration of desalination and electric vehicle loads with hybrid micro‐grid sizing and control: An Island Case Study

    by Tu Tu, Gobinath P. Rajarathnam, Anthony M. Vassallo

    This study addresses the feasibility, sizing, and scheduling of an island micro‐grid involving photovoltaic, wind turbine, diesel generator, and battery energy storage systems. In addition, the end‐use demand is expanded beyond residential electricity loads, as the full electrification on domestic water supply and transportation, in the forms of desalination and electric vehicles (EVs), are proposed in this study with integration to a renewable energy system focused micro‐grid. A mixed integer linear programming model is constructed to explore the mutual interactions of desalination plant, vehicle‐to‐grid enabled EVs and residential load deferring on a micro‐grid. A case study in Bruny Island, Australia was incorporated in the study, based on the existing infrastructure and future planning. Multiple scenarios were run utilizing real‐world, fine resolution time‐series data. Results were compared to investigate the impact of the polygeneration configuration and potential economic savings on household affordability. Our study displayed the advantage of electrifying and integrating household resources into the micro‐grid, such as transportation and water filtration. The integration created a greater diversity in electricity end‐uses, allowed for better scheduling and Renewable System management. In addition, the cost‐benefit analysis of stationary battery storage units was modeled against the other forms of energy storage, such as electric vehicles and seawater desalination plant, with findings suggesting the potential economic advantage of storage other than grid connected batteries in a residential precinct.


  • Open Access

    Optimal sizing and operating strategy of a stand‐alone generation–load–storage system: An island case study

    by Tu Tu, Gobinath P. Rajarathnam, Anthony M. Vassallo

    Component sizing optimization and technoeconomic feasibility studies for stand‐alone power systems have been actively discussed in recent years. However, most models and studies overlook the importance of individual component performance, input data resolution and their integration with the system. This article compares the rapidly evolving battery storage technology applications using the context of a stand‐alone system, through a case study on Bruny Island, Tasmania, Australia, where the current electricity infrastructure is approaching its end of life. We constructed a mixed‐integer linear programming model to achieve optimal balance between modeling accuracy and computational complexity. The model was constructed to obtain the optimal component sizing on the basis of minimum lifetime net present cost. It was shown in our work that any transition of islands to become fully stand alone should be carefully considered, where a limited grid connection could still provide significant value to the infrastructure, greatly reduce its stress over peak hours. This concept was illustrated further with another set of model scenarios aiming to explore the performance of battery storage systems with different power output allowances, limited by the time‐series data resolution, were developed. It was shown that the selection of incomplete input data cycle, reliance on standardized average values and utilization of low resolution time‐series data could heavily skew the results of a model, as the use of incomplete dataset and oversimplified average values subtly conceal some of the critical sizing and operation issues in a technoeconomic feasibility study, impacting the accuracy of the model to reflect the real problem.