Melek Rodoplu
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Melek Rodoplu has a total of 10 co-authors. Here are the top co-authors by number of shared publications:
- Taha Arbaoui
Université Jean Monnet Saint-Etienne
3 shared publications - Alice Yalaoui
University of Technology of Troyes
2 shared publications Alice Yalaoui
1 shared publication- Danyu Bai
School of Maritime Economics and Management, Dalian Maritime University, Dalian, China
1 shared publication - Feng Chu
IBISC, Univ Evry, University of Paris-Saclay, Evry, France
1 shared publication - Jie Yang1 shared publication
Latest Publications
- 13 July 2026
- Published by Elsevier in Expert Systems with Applications
- Vol. 332
Pareto optimization for learning-effect scheduling in a distributed flow shop with release dates
- 13 July 2026
- Published by Elsevier in Expert Systems with Applications
- Vol. 332
Pareto optimization for learning-effect scheduling in a distributed flow shop with release dates
- 9 February 2023
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 61 (23) , 8291-8308
Integrated planning of maintenance operations and workload allocation
Motivated by a practical problem, this paper investigates the integrated planning of maintenance operations and workload allocation on a set of machines in a workshop. Given quantities of products to be produced per period on a planning horizon must be processed on unrelated flexible machines. Moreover, each machine has to undergo one or more maintenance operations that must be planned within a given time window and impact products differently. The main goal is to find a feasible plan that satisfies the machine capacity by allocating the production quantities to machines and assigning maintenance operations as late as possible in their time windows. Various original mathematical models are presented. In particular, we propose models that allow maintenance operations and some production quantities to overlap two consecutive periods. Computational experiments based on industrial data show that allowing this overlapping helps the earliness of maintenance operations to be significantly reduced in the most difficult instances, going for example from a total of 14 periods to only 1 period, and by more than 35% on average.
- 9 February 2023
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 61 (23) , 8291-8308
Integrated planning of maintenance operations and workload allocation
Motivated by a practical problem, this paper investigates the integrated planning of maintenance operations and workload allocation on a set of machines in a workshop. Given quantities of products to be produced per period on a planning horizon must be processed on unrelated flexible machines. Moreover, each machine has to undergo one or more maintenance operations that must be planned within a given time window and impact products differently. The main goal is to find a feasible plan that satisfies the machine capacity by allocating the production quantities to machines and assigning maintenance operations as late as possible in their time windows. Various original mathematical models are presented. In particular, we propose models that allow maintenance operations and some production quantities to overlap two consecutive periods. Computational experiments based on industrial data show that allowing this overlapping helps the earliness of maintenance operations to be significantly reduced in the most difficult instances, going for example from a total of 14 periods to only 1 period, and by more than 35% on average.
- 1 February 2022
- Published by Elsevier in Applied Mathematical Modelling
- Vol. 102, 706-725
Joint energy capacity and production planning optimization in flow-shop systems
- 1 February 2022
- Published by Elsevier in Applied Mathematical Modelling
- Vol. 102, 706-725
Joint energy capacity and production planning optimization in flow-shop systems
- 1 November 2019
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 58 (21) , 6532-6552
A fix-and-relax heuristic for the single-item lot-sizing problem with a flow-shop system and energy constraints
This study addresses a new single-item lot-sizing problem for flow-shop configurations by integrating the capacity contract selection problem with multiple energy sources. To the best of our knowledge, this problem has never been tackled before. We introduce a mathematical model which defines optimum production plan and energy contract option regarding the objectives and constraints of the production system and energy supplier contract conditions. Since the problem is NP-Hard, a Fix-and-Relax heuristic is introduced to solve the problem. Two different relaxation procedures are applied and the performance of the solution approach is tested on randomly generated instances. It is seen that the obtained results are quite promising. The applied heuristic approach produces solutions with the optimality gap in average for the small problem sizes such as (N5_T5,N5_T7). For the larger instances, it allows to reach better results than the results obtained by commercial solvers within a shorter time.- 1 November 2019
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 58 (21) , 6532-6552
A fix-and-relax heuristic for the single-item lot-sizing problem with a flow-shop system and energy constraints
This study addresses a new single-item lot-sizing problem for flow-shop configurations by integrating the capacity contract selection problem with multiple energy sources. To the best of our knowledge, this problem has never been tackled before. We introduce a mathematical model which defines optimum production plan and energy contract option regarding the objectives and constraints of the production system and energy supplier contract conditions. Since the problem is NP-Hard, a Fix-and-Relax heuristic is introduced to solve the problem. Two different relaxation procedures are applied and the performance of the solution approach is tested on randomly generated instances. It is seen that the obtained results are quite promising. The applied heuristic approach produces solutions with the optimality gap in average for the small problem sizes such as (N5_T5,N5_T7). For the larger instances, it allows to reach better results than the results obtained by commercial solvers within a shorter time.- 6 September 2018
- Published by Elsevier in IFAC-PapersOnLine
- Vol. 51 (11) , 1089-1094
Energy Contract Optimization for the Single Item Lot Sizing Problem in a Flow-Shop Configuration and Multiple Energy Sources
- 6 September 2018
- Published by Elsevier in IFAC-PapersOnLine
- Vol. 51 (11) , 1089-1094
Energy Contract Optimization for the Single Item Lot Sizing Problem in a Flow-Shop Configuration and Multiple Energy Sources