Mubarak Al Alawi
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Mubarak Al Alawi has a total of 23 co-authors. Here are the top co-authors by number of shared publications:
Mohammed Al Shahri
4 shared publications- Khalifa Al-Jabri
Sultan Qaboos University
2 shared publications Abdullah Al-Mamun
Department of Civil and Architectural Engineering, Sultan Qaboos University, Oman
1 shared publicationAhmed Al Mahruqi
Department of Civil & Architectural Engineering, Sultan Qaboos University, Muscat, Oman
1 shared publicationAhmed Bouferguene
1 shared publicationAli Al Nuaimi
1 shared publication
Latest Publications
- Open Access
- 30 September 2026
- Published by Springer Nature in Circular Economy and Sustainability
- Vol. 6 (5) , 426
From Ad Hoc to Systemic Circular Construction: Evidence of a Legislative Bottleneck in an Emerging Economy
- 30 September 2026
- Published by Springer Nature in Circular Economy and Sustainability
- Vol. 6 (5) , 426
Open AccessFrom Ad Hoc to Systemic Circular Construction: Evidence of a Legislative Bottleneck in an Emerging Economy
- 15 June 2026
- Published by IOP Publishing in Engineering Research Express
- Vol. 8 (13)
A Mineralogy-Driven Machine Learning Framework for Optimizing LC³-Based 3D-Printed Cementitious Composites with an Integrated, End-to-End Python-Based Design Tool
This study presents a framework for developing low-carbon, printable limestone–calcined clay cement (LC³) using locally available clays in Oman that primarily contain kaolinite, illite, and montmorillonite. A dataset of 287 formulations using varying the proportions of these components and limestone, with each mix experimentally tested for compressive strength, flexural strength, and static yield stress to link mechanical performance with printability. Two supervised machine learning models: Gaussian Process Regression (GPR) and a shape-constrained Generalized Additive Model (GAM), were trained on the dataset. GPR showed superior performance, achieving R² values of 0.966 (compressive strength), 0.958 (flexural strength), and 0.736 (yield stress). A multi-objective optimization approach identified an optimal LC³ composition of 60% kaolinite, 5% illite, 5% montmorillonite, and 30% limestone. This mix yielded predicted properties of approximately 35 MPa compressive strength, 4.0 MPa flexural strength, and 720 Pa static yield stress. Experimental validation confirmed improved rheological behavior, with peak shear stress reaching about 950 Pa compared to 670 Pa for an OPC control, while maintaining shear-thinning characteristics. Mechanical testing of 3D-printed elements confirmed anisotropy due to layer interfaces, with 28-day strengths of 33.80 MPa (perpendicular) and 24.00 MPa (parallel), compared to higher values in the control mix. Durability tests using 1% HCl over 120 days showed better residual strength for LC³ (≈24 MPa) than the control (≈22 MPa). Strength degradation followed a Kohlrausch–Williams–Watts model (R² = 0.91), enabling structural parameterization. A validated finite-element model of a 3D-printed wall predicted a 47% reduction in load capacity and 35% stiffness loss after acid exposure. Overall, the study demonstrates a practical, reproducible pathway for sustainable, printable LC³ systems using regional materials. All codes and inputs are provided in Appendix for full reproducibility.
- 15 June 2026
- Published by IOP Publishing in Engineering Research Express
- Vol. 8 (13)
A Mineralogy-Driven Machine Learning Framework for Optimizing LC³-Based 3D-Printed Cementitious Composites with an Integrated, End-to-End Python-Based Design Tool
This study presents a framework for developing low-carbon, printable limestone–calcined clay cement (LC³) using locally available clays in Oman that primarily contain kaolinite, illite, and montmorillonite. A dataset of 287 formulations using varying the proportions of these components and limestone, with each mix experimentally tested for compressive strength, flexural strength, and static yield stress to link mechanical performance with printability. Two supervised machine learning models: Gaussian Process Regression (GPR) and a shape-constrained Generalized Additive Model (GAM), were trained on the dataset. GPR showed superior performance, achieving R² values of 0.966 (compressive strength), 0.958 (flexural strength), and 0.736 (yield stress). A multi-objective optimization approach identified an optimal LC³ composition of 60% kaolinite, 5% illite, 5% montmorillonite, and 30% limestone. This mix yielded predicted properties of approximately 35 MPa compressive strength, 4.0 MPa flexural strength, and 720 Pa static yield stress. Experimental validation confirmed improved rheological behavior, with peak shear stress reaching about 950 Pa compared to 670 Pa for an OPC control, while maintaining shear-thinning characteristics. Mechanical testing of 3D-printed elements confirmed anisotropy due to layer interfaces, with 28-day strengths of 33.80 MPa (perpendicular) and 24.00 MPa (parallel), compared to higher values in the control mix. Durability tests using 1% HCl over 120 days showed better residual strength for LC³ (≈24 MPa) than the control (≈22 MPa). Strength degradation followed a Kohlrausch–Williams–Watts model (R² = 0.91), enabling structural parameterization. A validated finite-element model of a 3D-printed wall predicted a 47% reduction in load capacity and 35% stiffness loss after acid exposure. Overall, the study demonstrates a practical, reproducible pathway for sustainable, printable LC³ systems using regional materials. All codes and inputs are provided in Appendix for full reproducibility.
- Open Access
- 8 April 2025
- Published by Sultan Qaboos University in The Journal of Engineering Research
- Vol. 17 (2) , 89-99
Modeling, Investigating, and Quantification of the Hot Weather Effects on Construction Projects in Oman
The construction industry is recognized as one of the industries most exposed to climatic conditions. Construction projects are mainly executed in an outdoor environment and the activities are considered weather-sensitive. Severe weather conditions can directly affect the productivity and efficient operation of construction projects. In addition, the weather is known to be one of the main factors that decrease labour productivity in construction projects causing project delays, cost overruns, and contractual claims between contractors and clients. Oman has a hot climate with very high temperatures in summer, warm winters, and low annual rainfall. During extremely hot weather, labour productivity significantly decreases, as construction work may stop partially or completely, therefore, this paper investigates and quantifies the hot and humid weather effects in construction projects in Oman. A construction productivity model was developed using the work/rest schedule proposed by the National Institute for Occupational Safety and Health (NIOSH), USA. The daily weather temperature and relative humidity of Muscat were inputs into the model and the expected productivity in terms of working hours were the output of the model. The model was applied to case studies, which involved three completed construction projects under different testing scenarios in Muscat. Results indicate that implementing the influence of hot and humid weather can lead to an extension of 3–38% longer project duration compared to the planned duration.
- 8 April 2025
- Published by Sultan Qaboos University in The Journal of Engineering Research
- Vol. 17 (2) , 89-99
Open AccessModeling, Investigating, and Quantification of the Hot Weather Effects on Construction Projects in Oman
The construction industry is recognized as one of the industries most exposed to climatic conditions. Construction projects are mainly executed in an outdoor environment and the activities are considered weather-sensitive. Severe weather conditions can directly affect the productivity and efficient operation of construction projects. In addition, the weather is known to be one of the main factors that decrease labour productivity in construction projects causing project delays, cost overruns, and contractual claims between contractors and clients. Oman has a hot climate with very high temperatures in summer, warm winters, and low annual rainfall. During extremely hot weather, labour productivity significantly decreases, as construction work may stop partially or completely, therefore, this paper investigates and quantifies the hot and humid weather effects in construction projects in Oman. A construction productivity model was developed using the work/rest schedule proposed by the National Institute for Occupational Safety and Health (NIOSH), USA. The daily weather temperature and relative humidity of Muscat were inputs into the model and the expected productivity in terms of working hours were the output of the model. The model was applied to case studies, which involved three completed construction projects under different testing scenarios in Muscat. Results indicate that implementing the influence of hot and humid weather can lead to an extension of 3–38% longer project duration compared to the planned duration.
- Open Access
- 8 April 2025
- Published by Sultan Qaboos University in The Journal of Engineering Research
- Vol. 19 (1) , 13-21
MODELING AND TESTING OF A MAINTENANCE PROJECT USING SIMPHONY: CASE STUDY
Unlike building a new project, the maintenance and rehabilitation of an existing project are complex. The complexity is driven by different factors such as limited access to the site, limited working hours, restricted storage area, a limited number of allowed crews to work simultaneously, etc. Considering all of these factors is essential for construction process planning. Hence, testing the maintenance project under different project scenarios will help to identify the optimum resources configuration. In this paper, we present a case study of a maintenance project located in Al Khodh, Oman. It is required to model and simulate the maintenance operation, given many client-based work constraints. The project was modelled using a Simphony simulation environment. The simulation model was tested in different resource configurations, including several floor accesses, other tiles breaking and tiles installation teams, and a different number of waterproofing teams. This study demonstrated that the tiles installation team is the most influencing resource in the project. Given one floor access at a time and using two tiles installation produces the most economical resources configuration. Three tiles installation teams are the best selection for two-floor accesses, and seven tiles installation teams selection is best for three floors.
- 8 April 2025
- Published by Sultan Qaboos University in The Journal of Engineering Research
- Vol. 19 (1) , 13-21
Open AccessMODELING AND TESTING OF A MAINTENANCE PROJECT USING SIMPHONY: CASE STUDY
Unlike building a new project, the maintenance and rehabilitation of an existing project are complex. The complexity is driven by different factors such as limited access to the site, limited working hours, restricted storage area, a limited number of allowed crews to work simultaneously, etc. Considering all of these factors is essential for construction process planning. Hence, testing the maintenance project under different project scenarios will help to identify the optimum resources configuration. In this paper, we present a case study of a maintenance project located in Al Khodh, Oman. It is required to model and simulate the maintenance operation, given many client-based work constraints. The project was modelled using a Simphony simulation environment. The simulation model was tested in different resource configurations, including several floor accesses, other tiles breaking and tiles installation teams, and a different number of waterproofing teams. This study demonstrated that the tiles installation team is the most influencing resource in the project. Given one floor access at a time and using two tiles installation produces the most economical resources configuration. Three tiles installation teams are the best selection for two-floor accesses, and seven tiles installation teams selection is best for three floors.
- Open Access
- 8 April 2025
- Published by Sultan Qaboos University in The Journal of Engineering Research
- Vol. 19 (1) , 33-40
PRODUCTIVITY FACTORS IN CONSTRUCTION SMES IN OMAN- EXPLORATION STUDY
Construction projects are unique and influenced by many external and internal factors hindering the efficiencies of operations. Different construction companies may have different influencing productivity factors depending on the company’s scale. Large construction companies have better resource management systems than the construction small and medium enterprises (SME). The construction SMEs work in small scale projects, and the amount and type of the required resources are different from the large construction companies. Therefore, identifying the factors affecting construction productivity is essential to determine the best action to avoid any unforeseen productivity reduction. This study aims to rank the most influencing productivity factors in small and medium construction (SME) companies. A questionnaire survey was used to collect data from small and medium construction companies registered in Oman Tender Board. The relative importance index (RII) was used to evaluate the responses. Sixty-five companies out of the 207 targeted population participated in the survey. It was found that - incomplete drawings and drawing omissions, poor site condition and management, delay in payment, unavailability of proper tools and equipment, and workers absenteeism and turnover were found as the top factors that influence construction productivity.
- 8 April 2025
- Published by Sultan Qaboos University in The Journal of Engineering Research
- Vol. 19 (1) , 33-40
Open AccessPRODUCTIVITY FACTORS IN CONSTRUCTION SMES IN OMAN- EXPLORATION STUDY
Construction projects are unique and influenced by many external and internal factors hindering the efficiencies of operations. Different construction companies may have different influencing productivity factors depending on the company’s scale. Large construction companies have better resource management systems than the construction small and medium enterprises (SME). The construction SMEs work in small scale projects, and the amount and type of the required resources are different from the large construction companies. Therefore, identifying the factors affecting construction productivity is essential to determine the best action to avoid any unforeseen productivity reduction. This study aims to rank the most influencing productivity factors in small and medium construction (SME) companies. A questionnaire survey was used to collect data from small and medium construction companies registered in Oman Tender Board. The relative importance index (RII) was used to evaluate the responses. Sixty-five companies out of the 207 targeted population participated in the survey. It was found that - incomplete drawings and drawing omissions, poor site condition and management, delay in payment, unavailability of proper tools and equipment, and workers absenteeism and turnover were found as the top factors that influence construction productivity.
- 4 February 2025
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 33 (4) , 3164-3196
Finance-based scheduling for projects in owners’ portfolios: MILP versus improved GA and PSO
Purpose: In the construction industry, cash flow issues can impact both contractors and owners. Although finance-based scheduling (FBS) models were developed to control contractors’ cash flow, researchers completely disregarded cash flow management for owners’ portfolios. Therefore, FBS is once again introduced in this study from the perspective of the owners of portfolios. Design/methodology/approach: For the FBS problem of portfolio owners (FBS-PO), a mixed integer linear program (MILP) model is developed. The purpose is to ensure that owners’ cash inflows are greater than cash outflows while minimizing the sum of weighted extensions of the projects in portfolios. Owing to the difficulties encountered in solving the proposed MILP model, genetic algorithm (GA) and particle swarm optimization (PSO) meta-heuristics are used. To ensure the feasibility of the solutions, a special serial schedule generation heuristic was developed in conjunction with the random key method for chromosome representation. Findings: The GA produced higher-quality solutions compared to PSO, though it required more processing time. The GA has proven to be a far better choice than the MILP exact solver for bigger portfolios. Additionally, there is a linear correlation between the number of activities in portfolios and the amount of computational time required for the GA to converge. Originality/value: This paper introduces the new research domain of FBS from the owners’ perspective (FBS-PO). In order to establish the FBS-PO as a stand-alone domain, a critical review of the FBS studies in the literature was conducted. In addition, the goals, characteristics, implementation and challenges of the FBS heuristics are benchmarked against those of the special serial schedule generation heuristic developed for the FBS-PO problem.
- 4 February 2025
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 33 (4) , 3164-3196
Finance-based scheduling for projects in owners’ portfolios: MILP versus improved GA and PSO
Purpose: In the construction industry, cash flow issues can impact both contractors and owners. Although finance-based scheduling (FBS) models were developed to control contractors’ cash flow, researchers completely disregarded cash flow management for owners’ portfolios. Therefore, FBS is once again introduced in this study from the perspective of the owners of portfolios. Design/methodology/approach: For the FBS problem of portfolio owners (FBS-PO), a mixed integer linear program (MILP) model is developed. The purpose is to ensure that owners’ cash inflows are greater than cash outflows while minimizing the sum of weighted extensions of the projects in portfolios. Owing to the difficulties encountered in solving the proposed MILP model, genetic algorithm (GA) and particle swarm optimization (PSO) meta-heuristics are used. To ensure the feasibility of the solutions, a special serial schedule generation heuristic was developed in conjunction with the random key method for chromosome representation. Findings: The GA produced higher-quality solutions compared to PSO, though it required more processing time. The GA has proven to be a far better choice than the MILP exact solver for bigger portfolios. Additionally, there is a linear correlation between the number of activities in portfolios and the amount of computational time required for the GA to converge. Originality/value: This paper introduces the new research domain of FBS from the owners’ perspective (FBS-PO). In order to establish the FBS-PO as a stand-alone domain, a critical review of the FBS studies in the literature was conducted. In addition, the goals, characteristics, implementation and challenges of the FBS heuristics are benchmarked against those of the special serial schedule generation heuristic developed for the FBS-PO problem.
- Open Access
Near-miss accidents data analysis and knowledge dissemination in water construction projects in Oman
- 8 July 2022
- Published by Springer Nature in Asian Journal of Civil Engineering
- Vol. 23 (7) , 1141-1153
Constructability practices in construction industry in Muscat: case study
This study aims to review the concept of constructability and evaluate the level of implementation of constructability practices in the construction industry in Muscat Governorate. One hundred and ninety questionnaires were distributed, and 85 complete responses were received, including 10 from owners (12%), 64 from consultants (75%) and 11 from the contractors (13%). The results showed that owners, consultants, and contractors recognize, support, and practice constructability efforts. 45% of the respondents said that constructability efforts typically begin in preconstruction planning, which shows a positive awareness that constructability efforts must start at the earliest stage of a project’s life cycle. In addition, 60% of the respondents indicated that they performed constructability by following a constructability procedure during the design stage. All the respondents agreed that constructability implementation obstacles continued to exist in construction projects in Muscat and the cost and time associated with the implementation of constructability review practices are the most dominant obstacles. Although constructability has been recognized in Muscat’s construction industry, the level of constructability awareness and improvement in cost and time estimation and quality requirements are developing.
- 8 July 2022
- Published by Springer Nature in Asian Journal of Civil Engineering
- Vol. 23 (7) , 1141-1153
Constructability practices in construction industry in Muscat: case study
This study aims to review the concept of constructability and evaluate the level of implementation of constructability practices in the construction industry in Muscat Governorate. One hundred and ninety questionnaires were distributed, and 85 complete responses were received, including 10 from owners (12%), 64 from consultants (75%) and 11 from the contractors (13%). The results showed that owners, consultants, and contractors recognize, support, and practice constructability efforts. 45% of the respondents said that constructability efforts typically begin in preconstruction planning, which shows a positive awareness that constructability efforts must start at the earliest stage of a project’s life cycle. In addition, 60% of the respondents indicated that they performed constructability by following a constructability procedure during the design stage. All the respondents agreed that constructability implementation obstacles continued to exist in construction projects in Muscat and the cost and time associated with the implementation of constructability review practices are the most dominant obstacles. Although constructability has been recognized in Muscat’s construction industry, the level of constructability awareness and improvement in cost and time estimation and quality requirements are developing.
- Open Access
- 21 August 2021
- Published by Springer Nature in Asian Journal of Civil Engineering
- Vol. 22 (7) , 1347-1359
Delay in payment effects on productivity of small and medium construction companies in Oman: exploration and ranking
Maintaining a stable productivity rate in a construction project is a challenge. Many external and internal factors influence it. Delay in payment is one of the factors representing the project cash flow and mirrors the company’s financial stability status. This study explores the delay in payments effects on the construction productivity of the small and medium construction companies in Oman. Also, it ranks the delay in payment among other productivity factors. Sixty-five small and medium construction companies registered in Oman Tender Board participated in the questionnaire survey. The results showed that delay in payment significantly affects the financial stability of the companies. The delay in payment was ranked third out of 21 influencing productivity factors. The results were compared with a previous study that covered large construction companies in Oman. It was found that the rank of delay in payment in the small and medium construction is significantly higher than what was found in large companies.
- 21 August 2021
- Published by Springer Nature in Asian Journal of Civil Engineering
- Vol. 22 (7) , 1347-1359
Open AccessDelay in payment effects on productivity of small and medium construction companies in Oman: exploration and ranking
Maintaining a stable productivity rate in a construction project is a challenge. Many external and internal factors influence it. Delay in payment is one of the factors representing the project cash flow and mirrors the company’s financial stability status. This study explores the delay in payments effects on the construction productivity of the small and medium construction companies in Oman. Also, it ranks the delay in payment among other productivity factors. Sixty-five small and medium construction companies registered in Oman Tender Board participated in the questionnaire survey. The results showed that delay in payment significantly affects the financial stability of the companies. The delay in payment was ranked third out of 21 influencing productivity factors. The results were compared with a previous study that covered large construction companies in Oman. It was found that the rank of delay in payment in the small and medium construction is significantly higher than what was found in large companies.
- Open Access
- 1 October 2020
- Published by Elsevier in Data in Brief
- Vol. 32
Industrial pipelines data generator
- 1 October 2020
- Published by Elsevier in Data in Brief
- Vol. 32
Open AccessIndustrial pipelines data generator