Patricia L. Mores
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Patricia L. Mores has a total of 19 co-authors. Here are the top co-authors by number of shared publications:
- Sergio F. Mussati
CAIMI Centro de Aplicaciones Informáticas y Modelado en Ingeniería, Universidad Tecnológica Nacional, Facultad Regional Rosario, Zeballos 1346, Rosario S2000BQA, Argentina
5 shared publications Sergio Mussati
5 shared publications- Ana Marisa Arias
CAIMI Centro de Aplicaciones Informáticas y Modelado en Ingeniería, Universidad Tecnológica Nacional, Facultad Regional Rosario, Zeballos 1346, Rosario S2000BQA, Argentina
4 shared publications - Jose Antonio Caballero
Institute of Chemical Process Engineering, University of Alicante, Ap. Correos 99, 03080 Alicante, Spain
4 shared publications - Miguel C. Mussati
INGAR Instituto de Desarrollo y Diseño (CONICET-UTN), Avellaneda 3657, S3002GJC Santa Fe, Argentina
4 shared publications Nicolas Scenna
4 shared publications
Latest Publications
- 9 April 2023
- Published by Wiley in Energy Storage
- Vol. 5 (8)
Evaluation of solar thermal energy capture and storage alternatives for indirect steam generation: A case study
This study analyzes the integration of a solar thermal plant for indirect steam generation in a typical industrial process with thermal energy requirements. Solar irradiation is computed using a validated predictive model in Santa Fe province, Argentina. Three configurations are proposed, consisting of parabolic trough collectors and thermal storage tanks. Performance indicators, such as generated energy, resulting solar fraction (the fraction of the industrial process' thermal requirements met by solar energy), and necessary solar field area, are evaluated for each configuration. A specific energy map is generated, showing the solar generation potential at each location. For required solar fractions of 20%‐25%, incorporating a thermal storage system does not provide any benefits as the solar plant does not produce enough energy to contribute to the industrial process during winter months. For required solar fractions of 30%‐35%, the resulting solar fraction can be increased to 42%‐45% with additional capture area and thermal storage capacity. For required solar fractions of 37%‐40%, the thermal storage improves the efficiency of the solar plant, resulting in a solar fraction of 50%‐60%, allowing the industrial process to receive energy for at least 6 h a day throughout the year. It is concluded that these configurations are suitable for providing a portion of the industrial process' thermal requirements.
- 9 April 2023
- Published by Wiley in Energy Storage
- Vol. 5 (8)
Evaluation of solar thermal energy capture and storage alternatives for indirect steam generation: A case study
This study analyzes the integration of a solar thermal plant for indirect steam generation in a typical industrial process with thermal energy requirements. Solar irradiation is computed using a validated predictive model in Santa Fe province, Argentina. Three configurations are proposed, consisting of parabolic trough collectors and thermal storage tanks. Performance indicators, such as generated energy, resulting solar fraction (the fraction of the industrial process' thermal requirements met by solar energy), and necessary solar field area, are evaluated for each configuration. A specific energy map is generated, showing the solar generation potential at each location. For required solar fractions of 20%‐25%, incorporating a thermal storage system does not provide any benefits as the solar plant does not produce enough energy to contribute to the industrial process during winter months. For required solar fractions of 30%‐35%, the resulting solar fraction can be increased to 42%‐45% with additional capture area and thermal storage capacity. For required solar fractions of 37%‐40%, the thermal storage improves the efficiency of the solar plant, resulting in a solar fraction of 50%‐60%, allowing the industrial process to receive energy for at least 6 h a day throughout the year. It is concluded that these configurations are suitable for providing a portion of the industrial process' thermal requirements.
- Open Access
Membrane-Based Processes: Optimization of Hydrogen Separation by Minimization of Power, Membrane Area, and Cost
This work deals with the optimization of two-stage membrane systems for H2 separation from off-gases in hydrocarbons processing plants to simultaneously attain high values of both H2 recovery and H2 product purity. First, for a given H2 recovery level of 90%, optimizations of the total annual cost (TAC) are performed for desired H2 product purity values ranging between 0.90 and 0.95 mole fraction. One of the results showed that the contribution of the operating expenditures is more significant than the contribution of the annualized capital expenditures (approximately 62% and 38%, respectively). In addition, it was found that the optimal trade-offs existing between process variables (such as total membrane area and total electric power) depend on the specified H2 product purity level. Second, the minimization of the total power demand and the minimization of the total membrane area were performed for H2 recovery of 90% and H2 product purity of 0.90. The TAC values obtained in the first and second cases increased by 19.9% and 4.9%, respectively, with respect to that obtained by cost minimization. Finally, by analyzing and comparing the three optimal solutions, a strategy to systematically and rationally provide ‘good’ lower and upper bounds for model variables and initial guess values to solve the cost minimization problem by means of global optimization algorithms is proposed, which can be straightforward applied to other processes.
Open AccessMembrane-Based Processes: Optimization of Hydrogen Separation by Minimization of Power, Membrane Area, and Cost
This work deals with the optimization of two-stage membrane systems for H2 separation from off-gases in hydrocarbons processing plants to simultaneously attain high values of both H2 recovery and H2 product purity. First, for a given H2 recovery level of 90%, optimizations of the total annual cost (TAC) are performed for desired H2 product purity values ranging between 0.90 and 0.95 mole fraction. One of the results showed that the contribution of the operating expenditures is more significant than the contribution of the annualized capital expenditures (approximately 62% and 38%, respectively). In addition, it was found that the optimal trade-offs existing between process variables (such as total membrane area and total electric power) depend on the specified H2 product purity level. Second, the minimization of the total power demand and the minimization of the total membrane area were performed for H2 recovery of 90% and H2 product purity of 0.90. The TAC values obtained in the first and second cases increased by 19.9% and 4.9%, respectively, with respect to that obtained by cost minimization. Finally, by analyzing and comparing the three optimal solutions, a strategy to systematically and rationally provide ‘good’ lower and upper bounds for model variables and initial guess values to solve the cost minimization problem by means of global optimization algorithms is proposed, which can be straightforward applied to other processes.
- Open Access
Optimal Design of a Two-Stage Membrane System for Hydrogen Separation in Refining Processes
This paper fits into the process system engineering field by addressing the optimization of a two-stage membrane system for H2 separation in refinery processes. To this end, a nonlinear mathematical programming (NLP) model is developed to simultaneously optimize the size of each membrane stage (membrane area, heat transfer area, and installed power for compressors and vacuum pumps) and operating conditions (flow rates, pressures, temperatures, and compositions) to achieve desired target levels of H2 product purity and H2 recovery at a minimum total annual cost. Optimal configuration and process design are obtained from a model which embeds different operating modes and process configurations. For instance, the following candidate ways to create the driving force across the membrane are embedded: (a) compression of both feed and/or permeate streams, or (b) vacuum application in permeate streams, or (c) a combination of (a) and (b). In addition, the potential selection of an expansion turbine to recover energy from the retentate stream (energy recovery system) is also embedded. For a H2 product purity of 0.90 and H2 recovery of 90%, a minimum total annual cost of 1.764 M$·year−1 was obtained for treating 100 kmol·h−1 with 0.18, 0.16, 0.62, and 0.04 mole fraction of H2, CO, N2, CO2, respectively. The optimal solution selected a combination of compression and vacuum to create the driving force and removed the expansion turbine. Afterwards, this optimal solution was compared in terms of costs, process-unit sizes, and operating conditions to the following two sub-optimal solutions: (i) no vacuum in permeate stream is applied, and (ii) the expansion turbine is included into the process. The comparison showed that the latter (ii) has the highest total annual cost (TAC) value, which is around 7% higher than the former (i) and 24% higher than the found optimal solution. Finally, a sensitivity analysis to investigate the influence of the desired H2 product purity and H2 recovery is presented. Opposite cost-based trade-offs between total membrane area and total electric power were observed with the variations of these two model parameters. This paper contributes a valuable decision-support tool in the process system engineering field for designing, simulating, and optimizing membrane-based systems for H2 separation in a particular industrial case; and the presented optimization results provide useful guidelines to assist in selecting the optimal configuration and operating mode.
Open AccessOptimal Design of a Two-Stage Membrane System for Hydrogen Separation in Refining Processes
This paper fits into the process system engineering field by addressing the optimization of a two-stage membrane system for H2 separation in refinery processes. To this end, a nonlinear mathematical programming (NLP) model is developed to simultaneously optimize the size of each membrane stage (membrane area, heat transfer area, and installed power for compressors and vacuum pumps) and operating conditions (flow rates, pressures, temperatures, and compositions) to achieve desired target levels of H2 product purity and H2 recovery at a minimum total annual cost. Optimal configuration and process design are obtained from a model which embeds different operating modes and process configurations. For instance, the following candidate ways to create the driving force across the membrane are embedded: (a) compression of both feed and/or permeate streams, or (b) vacuum application in permeate streams, or (c) a combination of (a) and (b). In addition, the potential selection of an expansion turbine to recover energy from the retentate stream (energy recovery system) is also embedded. For a H2 product purity of 0.90 and H2 recovery of 90%, a minimum total annual cost of 1.764 M$·year−1 was obtained for treating 100 kmol·h−1 with 0.18, 0.16, 0.62, and 0.04 mole fraction of H2, CO, N2, CO2, respectively. The optimal solution selected a combination of compression and vacuum to create the driving force and removed the expansion turbine. Afterwards, this optimal solution was compared in terms of costs, process-unit sizes, and operating conditions to the following two sub-optimal solutions: (i) no vacuum in permeate stream is applied, and (ii) the expansion turbine is included into the process. The comparison showed that the latter (ii) has the highest total annual cost (TAC) value, which is around 7% higher than the former (i) and 24% higher than the found optimal solution. Finally, a sensitivity analysis to investigate the influence of the desired H2 product purity and H2 recovery is presented. Opposite cost-based trade-offs between total membrane area and total electric power were observed with the variations of these two model parameters. This paper contributes a valuable decision-support tool in the process system engineering field for designing, simulating, and optimizing membrane-based systems for H2 separation in a particular industrial case; and the presented optimization results provide useful guidelines to assist in selecting the optimal configuration and operating mode.
- 1 October 2016
- Published by Elsevier in International Journal of Greenhouse Gas Control
- Vol. 53, 371-390
Optimization of multi-stage membrane systems for CO 2 capture from flue gas
- 1 October 2016
- Published by Elsevier in International Journal of Greenhouse Gas Control
- Vol. 53, 371-390
Optimization of multi-stage membrane systems for CO 2 capture from flue gas
- 1 March 2016
- Published by Elsevier in Journal of Cleaner Production
- Vol. 115, 315-331
Optimal design and sensitivity analysis of post-combustion CO 2 capture process by chemical absorption with amines
- 1 March 2016
- Published by Elsevier in Journal of Cleaner Production
- Vol. 115, 315-331
Optimal design and sensitivity analysis of post-combustion CO 2 capture process by chemical absorption with amines
- 12 August 2014
- Published by American Chemical Society (ACS) in Industrial & Engineering Chemistry Research
- Vol. 53 (44) , 17026-17042
Optimal Design and Operating Conditions of an Integrated Plant Using a Natural Gas Combined Cycle and Postcombustion CO2 Capture
- 12 August 2014
- Published by American Chemical Society (ACS) in Industrial & Engineering Chemistry Research
- Vol. 53 (44) , 17026-17042
Optimal Design and Operating Conditions of an Integrated Plant Using a Natural Gas Combined Cycle and Postcombustion CO2 Capture
- 1 July 2014
- Published by Elsevier in Chemical Engineering Research and Design
- Vol. 92 (7) , 1329-1353
A NGCC power plant with a CO2 post-combustion capture option. Optimal economics for different generation/capture goals
- 1 July 2014
- Published by Elsevier in Chemical Engineering Research and Design
- Vol. 92 (7) , 1329-1353
A NGCC power plant with a CO2 post-combustion capture option. Optimal economics for different generation/capture goals
- 1 September 2012
- Published by Elsevier in International Journal of Greenhouse Gas Control
- Vol. 10, 148-163
CO2 capture in power plants: Minimization of the investment and operating cost of the post-combustion process using MEA aqueous solution
- 1 September 2012
- Published by Elsevier in International Journal of Greenhouse Gas Control
- Vol. 10, 148-163
CO2 capture in power plants: Minimization of the investment and operating cost of the post-combustion process using MEA aqueous solution