Taryn Jane Bond-Barnard
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Taryn Jane Bond-Barnard has a total of 18 co-authors. Here are the top co-authors by number of shared publications:
- Herman Steyn
Engineering and Technology Management, University of Pretoria, Pretoria, South Africa
5 shared publications - Inger Fabris-Rotelli
University of Pretoria, South Africa
2 shared publications - Lizelle Fletcher
University of Pretoria
2 shared publications Aadil Peer
1 shared publicationAllyn John Zackarias
Department of Engineering and Technology Management University of Pretoria
1 shared publicationAnchen Wiegand
1 shared publication
Latest Publications
- 30 December 2025
- Published by Serbian Project Management Association
- p. 198-220
Conceptual Framework to Guide the Application of Artificial Intelligence in Project Management Decision Making
Projects continue to fail despite technological advancements, with poor decision-making being a primary contributing factor. With the growing interest in Artificial Intelligence (AI) in project management (PM) and decision-making, AI could improve decision-making and project performance. However, to implement AI for this purpose, limited comprehensive guidelines and frameworks exist to assist project managers in identifying where to begin, which critical factors to consider, what changes or developments are necessary, and the specific expertise required. Therefore, this study explores the critical factors for implementing AI in project decision-making through a mixed-methods approach. Firstly, a semi-structured focus group interview was conducted with selected individuals from a project-based engineering firm. The thematic analysis of the qualitative data identified limitations in project success and decision-making, as well as implementation considerations for AI in project decision-making. Secondly, quantitative data was gathered using an online survey and analysed using descriptive statistics to rank the importance of the seven identified success groups and their factors. A conceptual framework was developed considering the importance of the seven success groups and their factors. This framework addresses the shortcomings of an existing model to guide the successful implementation of AI in PM to support and improve project decision-making and performance.
- 30 December 2025
- Published by Serbian Project Management Association
- p. 198-220
Conceptual Framework to Guide the Application of Artificial Intelligence in Project Management Decision Making
Projects continue to fail despite technological advancements, with poor decision-making being a primary contributing factor. With the growing interest in Artificial Intelligence (AI) in project management (PM) and decision-making, AI could improve decision-making and project performance. However, to implement AI for this purpose, limited comprehensive guidelines and frameworks exist to assist project managers in identifying where to begin, which critical factors to consider, what changes or developments are necessary, and the specific expertise required. Therefore, this study explores the critical factors for implementing AI in project decision-making through a mixed-methods approach. Firstly, a semi-structured focus group interview was conducted with selected individuals from a project-based engineering firm. The thematic analysis of the qualitative data identified limitations in project success and decision-making, as well as implementation considerations for AI in project decision-making. Secondly, quantitative data was gathered using an online survey and analysed using descriptive statistics to rank the importance of the seven identified success groups and their factors. A conceptual framework was developed considering the importance of the seven success groups and their factors. This framework addresses the shortcomings of an existing model to guide the successful implementation of AI in PM to support and improve project decision-making and performance.
- 16 May 2025
- Published by Serbian Project Management Association
- p. 252-272
Collaborative Contracting: Barriers to Adoption in the South African Construction Industry
The strained and even hostile relationships between contracting parties in the construction industry, caused by the competitive nature of traditional contracting, are partially to be blamed for poor project performance. Collaborative contracting (CC) emphasizes cooperation, partnership and shared goals among partners and contributes to improved time, cost, and quality performance. There has been a notable increase in collaborative contracting in some countries and barriers to adoption of collaborative contracting have been studied. However, little is known about the barriers to adoption in countries that lag in the implementation of CC. This paper investigates the barriers in a developing country that lags in the adoption of CC. Semi-structured interviews were undertaken with 12 professionals, all of whom have more than 15 years of relevant experience. The findings correlate largely with existing literature but two additional barriers, societal distrust, and lack of local successes, have been uncovered. A model of factors leading to the dominance of traditional contracting is proposed, indicating issues related to trust, a lack of knowledge of CC, awareness, and a perceived loss of control as barriers to adoption. The need for governments, clients, and regulators to promote CC is also stressed. In addition to the contribution to existing literature, this paper also provides practitioners insight into factors that should be considered for implementing CC.
- 16 May 2025
- Published by Serbian Project Management Association
- p. 252-272
Collaborative Contracting: Barriers to Adoption in the South African Construction Industry
The strained and even hostile relationships between contracting parties in the construction industry, caused by the competitive nature of traditional contracting, are partially to be blamed for poor project performance. Collaborative contracting (CC) emphasizes cooperation, partnership and shared goals among partners and contributes to improved time, cost, and quality performance. There has been a notable increase in collaborative contracting in some countries and barriers to adoption of collaborative contracting have been studied. However, little is known about the barriers to adoption in countries that lag in the implementation of CC. This paper investigates the barriers in a developing country that lags in the adoption of CC. Semi-structured interviews were undertaken with 12 professionals, all of whom have more than 15 years of relevant experience. The findings correlate largely with existing literature but two additional barriers, societal distrust, and lack of local successes, have been uncovered. A model of factors leading to the dominance of traditional contracting is proposed, indicating issues related to trust, a lack of knowledge of CC, awareness, and a perceived loss of control as barriers to adoption. The need for governments, clients, and regulators to promote CC is also stressed. In addition to the contribution to existing literature, this paper also provides practitioners insight into factors that should be considered for implementing CC.
- 16 May 2025
- Published by Serbian Project Management Association
- p. 160-181
Towards a Project Management Mentoring Framework to Facilitate Service-Based Learning in Community-Based Projects
Approaches to using mentoring and service-based learning to enhance project management education is underreported. A postgraduate school and the local chapter of an international project management association initiated a student mentoring program which is now in its 6th year. The objective of the program is to enable professional project managers to transfer project management skills to first-year students. These students participate in service-based learning to address the needs of local businesses in the community of Mamelodi, South Africa. The COVID-19 pandemic and the popularity of video conferencing tools have led to Virtual Mentoring becoming more prevalent than Face-to-face mentoring. The objective of this study was to develop a framework and format for mentoring students who partake in project management community-based initiatives to effectively learn project management principles in groups, at scale. An exploratory research design led to a mixed-method approach for this study. Seven experts involved in the program completed rounds one and two of the Delphi study. The findings indicate that Virtual Mentoring is suitable if effective communication is used for geographically dispersed group mentoring activities. Face-to-face Mentoring is suitable when psychosocial support is required. Furthermore, the mentoring requirements for both approaches were similar, the difference being that virtual mentoring participants needed to be technologically adept. This paper will be of value to institutions interested in developing scaled project management mentorship programs for service-based learning.
- 16 May 2025
- Published by Serbian Project Management Association
- p. 160-181
Towards a Project Management Mentoring Framework to Facilitate Service-Based Learning in Community-Based Projects
Approaches to using mentoring and service-based learning to enhance project management education is underreported. A postgraduate school and the local chapter of an international project management association initiated a student mentoring program which is now in its 6th year. The objective of the program is to enable professional project managers to transfer project management skills to first-year students. These students participate in service-based learning to address the needs of local businesses in the community of Mamelodi, South Africa. The COVID-19 pandemic and the popularity of video conferencing tools have led to Virtual Mentoring becoming more prevalent than Face-to-face mentoring. The objective of this study was to develop a framework and format for mentoring students who partake in project management community-based initiatives to effectively learn project management principles in groups, at scale. An exploratory research design led to a mixed-method approach for this study. Seven experts involved in the program completed rounds one and two of the Delphi study. The findings indicate that Virtual Mentoring is suitable if effective communication is used for geographically dispersed group mentoring activities. Face-to-face Mentoring is suitable when psychosocial support is required. Furthermore, the mentoring requirements for both approaches were similar, the difference being that virtual mentoring participants needed to be technologically adept. This paper will be of value to institutions interested in developing scaled project management mentorship programs for service-based learning.
- 16 May 2025
- Published by Serbian Project Management Association
- p. 56-77
Risk Drivers of Inadequate Communication in South African Virtual Project Teams
Virtual teams require communication technology for project activities that require teamwork and frequent communication. Effective and frequent communication is a project success factor of virtual project teams, with communication management the most effective risk management strategy for virtual projects. Previous studies examined factors that affect communication in virtual project teams, but did not clearly differentiate between risk drivers, risk events, and risk impacts. Further, previous research primarily focussed in the global software development sector which pioneered virtual work. COVID-19 increased prevalence of virtual work and preliminary research demonstrates that COVID-19 has changed how virtual teams work. In line with risk management best practice of reassessing project risks when the project environment changes, this study assesses the most prevalent risk drivers of inadequate communication in virtual project teams within the South African environment. Relevant risk drivers were identified through literature review and a survey was used to collect data from project managers. Statistical analysis was completed using frequency tables. Communication competency, organisational environment and insufficient internet connectivity were shown to have a minor impact on virtual teamwork. Unstable electrical supply was a significant risk driver of inadequate communication and a risk that must be mitigated during virtual project teamwork in countries with insufficient electrical infrastructure.
- 16 May 2025
- Published by Serbian Project Management Association
- p. 56-77
Risk Drivers of Inadequate Communication in South African Virtual Project Teams
Virtual teams require communication technology for project activities that require teamwork and frequent communication. Effective and frequent communication is a project success factor of virtual project teams, with communication management the most effective risk management strategy for virtual projects. Previous studies examined factors that affect communication in virtual project teams, but did not clearly differentiate between risk drivers, risk events, and risk impacts. Further, previous research primarily focussed in the global software development sector which pioneered virtual work. COVID-19 increased prevalence of virtual work and preliminary research demonstrates that COVID-19 has changed how virtual teams work. In line with risk management best practice of reassessing project risks when the project environment changes, this study assesses the most prevalent risk drivers of inadequate communication in virtual project teams within the South African environment. Relevant risk drivers were identified through literature review and a survey was used to collect data from project managers. Statistical analysis was completed using frequency tables. Communication competency, organisational environment and insufficient internet connectivity were shown to have a minor impact on virtual teamwork. Unstable electrical supply was a significant risk driver of inadequate communication and a risk that must be mitigated during virtual project teamwork in countries with insufficient electrical infrastructure.
- 16 May 2025
- Published by Serbian Project Management Association
- p. 299-325
Onwards to Human-Centric Technological Frontiers: Assessing Construction Project Managers' Readiness for Industry 5.0
Construction project management is pivotal for successful building projects, demanding expertise in construction engineering, process management, human resource management, and financial management. While scholars have outlined key metrics for project success, challenges persist, including delays, budget overruns, inconsistent delivery quality, trust deficits, and communication difficulties. The advent of Industry 5.0 has sparked discussions on its potential to address challenges in various industries, including construction. Emphasizing sustainability, human-centricity, and resilience, the European Commission has increased the significance of the concept by taking steps in its definition and has listed enabling technologies crucial to Industry 5.0. Researchers have synthesized technology lists, proposing applications for the construction industry. This systematic literature review employs a rigorous and iterative methodology which utilizes an adapted SPIDER framework for initial screening and qualitative data extraction techniques for meticulous data collection. The Critical Appraisal Skills Program (CASP) qualitative checklists assess the quality of the literature. The review aimed to explore the current Industry 5.0 landscape, its onset in the construction sector and determine its impact on construction project managers' skills. The systematic review revealed varying perspectives on the emergence of Industry 5.0 and its impact on construction project management skills. Scholars debate if Industry 5.0 is underway, overlapping with Industry 4.0, or a forthcoming paradigm shift. Research on Construction Project Managers' Industry 5.0 skills remains scarce, despite their importance for the transition. Moreover, little has been done to determine if current industry practices align with these evolving skill sets or if tertiary education adequately prepares professionals. These findings underscore the necessity for industry collaboration, educational reform, and further research to effectively address the intricate challenges posed by Industry 5.0 in the construction sector.
- 16 May 2025
- Published by Serbian Project Management Association
- p. 299-325
Onwards to Human-Centric Technological Frontiers: Assessing Construction Project Managers' Readiness for Industry 5.0
Construction project management is pivotal for successful building projects, demanding expertise in construction engineering, process management, human resource management, and financial management. While scholars have outlined key metrics for project success, challenges persist, including delays, budget overruns, inconsistent delivery quality, trust deficits, and communication difficulties. The advent of Industry 5.0 has sparked discussions on its potential to address challenges in various industries, including construction. Emphasizing sustainability, human-centricity, and resilience, the European Commission has increased the significance of the concept by taking steps in its definition and has listed enabling technologies crucial to Industry 5.0. Researchers have synthesized technology lists, proposing applications for the construction industry. This systematic literature review employs a rigorous and iterative methodology which utilizes an adapted SPIDER framework for initial screening and qualitative data extraction techniques for meticulous data collection. The Critical Appraisal Skills Program (CASP) qualitative checklists assess the quality of the literature. The review aimed to explore the current Industry 5.0 landscape, its onset in the construction sector and determine its impact on construction project managers' skills. The systematic review revealed varying perspectives on the emergence of Industry 5.0 and its impact on construction project management skills. Scholars debate if Industry 5.0 is underway, overlapping with Industry 4.0, or a forthcoming paradigm shift. Research on Construction Project Managers' Industry 5.0 skills remains scarce, despite their importance for the transition. Moreover, little has been done to determine if current industry practices align with these evolving skill sets or if tertiary education adequately prepares professionals. These findings underscore the necessity for industry collaboration, educational reform, and further research to effectively address the intricate challenges posed by Industry 5.0 in the construction sector.
- 1 November 2024
- Published by IATED Academy in ICERI Proceedings
- Vol. 1, 6575-6584
TOWARDS A LEARNING ANALYTICS DASHBOARD TO IDENTIFY ‘AT RISK’ LEARNER PERSONAS FOR AN ONLINE, HYBRID STRUCTURED MASTERS PROGRAMME: A HUMAN-CENTRED DESIGN APPROACH
- 1 November 2024
- Published by IATED Academy in ICERI Proceedings
- Vol. 1, 6575-6584
TOWARDS A LEARNING ANALYTICS DASHBOARD TO IDENTIFY ‘AT RISK’ LEARNER PERSONAS FOR AN ONLINE, HYBRID STRUCTURED MASTERS PROGRAMME: A HUMAN-CENTRED DESIGN APPROACH
- Open Access
- 30 November 2022
- Published by University of Minho in International Journal of Information Systems and Project Management
- Vol. 10 (4) , 59-75
Challenges and critical success factors of digital communication, collaboration and knowledge sharing in project management virtual teams: a review
Technological advancements, globalization, and the COVID-19 pandemic have transformed digital communication into a central tenet of many project management virtual teams (VTs). However, successful VTs are dependent on communication, collaboration and knowledge sharing among team members. Through a systematic literature review, this study investigates the challenges and critical success factors of digital communication, collaboration, and knowledge sharing in project management VTs. As a result, eight key common themes were identified - trust, cultural diversity, collaboration tools and technology, communication and knowledge hoarding, leadership, psychological safety, communication guidelines and training, and resource planning. Furthermore, given the geographically dispersed nature of VTs, they face additional challenges than teams that interact face-to-face (in-person). Therefore, mitigating the challenges by focusing on the identified themes could lead to project success.
- 30 November 2022
- Published by University of Minho in International Journal of Information Systems and Project Management
- Vol. 10 (4) , 59-75
Open AccessChallenges and critical success factors of digital communication, collaboration and knowledge sharing in project management virtual teams: a review
Technological advancements, globalization, and the COVID-19 pandemic have transformed digital communication into a central tenet of many project management virtual teams (VTs). However, successful VTs are dependent on communication, collaboration and knowledge sharing among team members. Through a systematic literature review, this study investigates the challenges and critical success factors of digital communication, collaboration, and knowledge sharing in project management VTs. As a result, eight key common themes were identified - trust, cultural diversity, collaboration tools and technology, communication and knowledge hoarding, leadership, psychological safety, communication guidelines and training, and resource planning. Furthermore, given the geographically dispersed nature of VTs, they face additional challenges than teams that interact face-to-face (in-person). Therefore, mitigating the challenges by focusing on the identified themes could lead to project success.
- Open Access
- 1 January 2022
- Published by Stellenbosch University in South African Journal of Industrial Engineering
- Vol. 33 (4) , 147-164
IMPROVING KNOWLEDGE TRANSFER PROCESSES TO ADDRESS SKILLS AND KNOWLEDGE GAPS BETWEEN SENIOR AND JUNIOR STAFF IN ENGINEERING PROJECTS
Skills and knowledge gaps between senior and junior staff is prevalent in engineering projects. This study aimed to identify the factors that affect knowledge transfer and methods to retain transferred knowledge between senior and junior staff in the South African engineering environment. Although several studies have examined the factors that influence knowledge transfer, very few have studied the factors affecting knowledge transfer between senior and junior staff in engineering projects. This study found that knowledge transfer is not made a priority in projects, and that there is a lack of knowledge transfer platforms and structures in projects. Incentivising knowledge transfer by making it a work outcome would improve knowledge transfer in projects. Keywords Knowledge Transfer; Engineering Projects
- 1 January 2022
- Published by Stellenbosch University in South African Journal of Industrial Engineering
- Vol. 33 (4) , 147-164
Open AccessIMPROVING KNOWLEDGE TRANSFER PROCESSES TO ADDRESS SKILLS AND KNOWLEDGE GAPS BETWEEN SENIOR AND JUNIOR STAFF IN ENGINEERING PROJECTS
Skills and knowledge gaps between senior and junior staff is prevalent in engineering projects. This study aimed to identify the factors that affect knowledge transfer and methods to retain transferred knowledge between senior and junior staff in the South African engineering environment. Although several studies have examined the factors that influence knowledge transfer, very few have studied the factors affecting knowledge transfer between senior and junior staff in engineering projects. This study found that knowledge transfer is not made a priority in projects, and that there is a lack of knowledge transfer platforms and structures in projects. Incentivising knowledge transfer by making it a work outcome would improve knowledge transfer in projects. Keywords Knowledge Transfer; Engineering Projects
- 1 January 2021
- Vol. 9 (1) , 78-97
Smart Project Management Information Systems (SPMIS) for Engineering Projects - Project Performance Monitoring & Reporting
- 1 January 2021
- Vol. 9 (1) , 78-97
Smart Project Management Information Systems (SPMIS) for Engineering Projects - Project Performance Monitoring & Reporting
- Open Access
- 16 April 2018
- Published by Emerald Publishing in International Journal of Managing Projects in Business
- Vol. 11 (2) , 432-457
Linking trust and collaboration in project teams to project management success
Purpose: The purpose of this paper is to emphasise the importance of high levels of trust and collaboration for increasing the likelihood of project management (PM) success. However, the link between these three constructs remains unclear. Design/methodology/approach: In this study, the authors use structural equation modelling (SEM) based on the findings from an international survey of 151 project practitioners to demonstrate the significance of project team trust and collaboration for increasing the likelihood of PM success. Findings: The results indicate that PM success becomes more likely as the degree of collaboration improves which, in turn, is influenced by an increase in the level of trust between team members. The two factors of PM success are project performance and knowledge integration and innovation. The six factors of the degree of collaboration that were studied are physical proximity, commitment, conflict, coordination, relationships and incentives. The three factors of the level of trust investigated are expectations, knowledge exchange and imported trust. Practical implications: The results of the study are expected to provide insight for project practitioners to increase the likelihood of PM success by taking cognisance of the factors that influence collaboration and trust. The results of the study may also provide insight into teaching and learning in tertiary education, in terms of professionalism and integrity issues. Originality/value: This paper presents a new perspective for investigating PM success. SEM techniques are used to determine the likelihood of PM success by promoting trust and collaboration in the project team. This unique approach highlights the “human factors” that influence perceived PM success which should benefit both researchers and practitioners.
- 16 April 2018
- Published by Emerald Publishing in International Journal of Managing Projects in Business
- Vol. 11 (2) , 432-457
Open AccessLinking trust and collaboration in project teams to project management success
Purpose: The purpose of this paper is to emphasise the importance of high levels of trust and collaboration for increasing the likelihood of project management (PM) success. However, the link between these three constructs remains unclear. Design/methodology/approach: In this study, the authors use structural equation modelling (SEM) based on the findings from an international survey of 151 project practitioners to demonstrate the significance of project team trust and collaboration for increasing the likelihood of PM success. Findings: The results indicate that PM success becomes more likely as the degree of collaboration improves which, in turn, is influenced by an increase in the level of trust between team members. The two factors of PM success are project performance and knowledge integration and innovation. The six factors of the degree of collaboration that were studied are physical proximity, commitment, conflict, coordination, relationships and incentives. The three factors of the level of trust investigated are expectations, knowledge exchange and imported trust. Practical implications: The results of the study are expected to provide insight for project practitioners to increase the likelihood of PM success by taking cognisance of the factors that influence collaboration and trust. The results of the study may also provide insight into teaching and learning in tertiary education, in terms of professionalism and integrity issues. Originality/value: This paper presents a new perspective for investigating PM success. SEM techniques are used to determine the likelihood of PM success by promoting trust and collaboration in the project team. This unique approach highlights the “human factors” that influence perceived PM success which should benefit both researchers and practitioners.