Iryna Trunova
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Iryna Trunova has a total of 35 co-authors. Here are the top co-authors by number of shared publications:
- Oleksandr Miroshnyk
State Biotechnological University
6 shared publications - Олександр Анатолійович Савченко
Державний біотехнологічний університет
5 shared publications - Serhii Dudnikov
Department of Production Engineering and Safety, Faculty of Management , Czestochowa University of Technology , ul. Generała Jana Henryka Dąbrowskiego 69 Poland ; Department of Electricity and Energy Management State Biotechnological University Kharkiv , Ukraine
4 shared publications - Oleksandr Moroz
Державний біотехнологічний університет
3 shared publications - Mohamed Qawaqzeh
Al Balqa Appl Univ, Salt, Jordan
2 shared publications - Serhii Halko
Department of Electrical Engineering and Electromechanics Named after Prof. V.V. Ovharov , Dmytro Motornyi Tavria State Agrotechnological University Zaporizhia , Ukraine , Ukraine
2 shared publications
Latest Publications
- 28 April 2026
- Published by Wydawnictwo SIGMA-NOT, sp. z.o.o. in PRZEGLĄD ELEKTROTECHNICZNY
- Vol. 1 (4) , 65-70
Use of engineering management to improve the quality of distribution networks maintenance
Recommendations for the use of engineering management using the example of business analysis elements of the project of an automated quality management system for maintenance of distribution networks are proposed. A scheme for using databases of Distribution System Operators in the automated quality management system for maintenance of distribution networks has been developed to monitor achieved results, stimulate the achievement of better results and optimize the planning of technical operation works.
- 28 April 2026
- Published by Wydawnictwo SIGMA-NOT, sp. z.o.o. in PRZEGLĄD ELEKTROTECHNICZNY
- Vol. 1 (4) , 65-70
Use of engineering management to improve the quality of distribution networks maintenance
Recommendations for the use of engineering management using the example of business analysis elements of the project of an automated quality management system for maintenance of distribution networks are proposed. A scheme for using databases of Distribution System Operators in the automated quality management system for maintenance of distribution networks has been developed to monitor achieved results, stimulate the achievement of better results and optimize the planning of technical operation works.
- Open Access
- 1 March 2026
- Published by WNGB Scientific Publishing House Sp. z o.o. in Advances in Science and Technology Research Journal
- Vol. 20 (3) , 276-286
Increasing the efficiency of low and medium-capacity bioenergy complexes as part of the fuel and energy complex of Ukraine
The rapid increase in the share of renewable energy sources within the Unified Power System of Ukraine necessitates the integration of high-flexibility energy storage systems to compensate for their inherent variability. However, the implementation of battery-based storage systems significantly...
- 1 March 2026
- Published by WNGB Scientific Publishing House Sp. z o.o. in Advances in Science and Technology Research Journal
- Vol. 20 (3) , 276-286
Open AccessIncreasing the efficiency of low and medium-capacity bioenergy complexes as part of the fuel and energy complex of Ukraine
The rapid increase in the share of renewable energy sources within the Unified Power System of Ukraine necessitates the integration of high-flexibility energy storage systems to compensate for their inherent variability. However, the implementation of battery-based storage systems significantly...
- Open Access
- 1 December 2024
- Published by Walter de Gruyter GmbH in System Safety: Human - Technical Facility - Environment
- Vol. 6 (1) , 154-166
Prospects for Biogas Plant Implementation in the Unified Energy System
The study suggests using biogas plants as highly flexible energy sources. A critical step in deciding on their use involves predictive insights on the energy-efficiency metrics of the proposed biogas-based energy supply system compared to the current centralized model. Energy efficiency metrics were assessed through an analysis of energy balances, built using average statistical data on losses and energy consumption at biogas facilities. This approach is recommended for use in the early stages of defining technical requirements, enabling informed decisions about constructing or upgrading existing energy systems. Implementing biogas plants (BGP) as local power sources proves economically competitive when compared to centralized systems like thermal power plants (TPP) and boiler facilities. BGPs share a similar structure with these systems but operate with fewer areas needed for operations. Integrating BGPs can help reduce national dependence on imported energy, correct imbalances in the energy system due to their flexibility, and lower the cost of energy – whether electrical, thermal, or chemical (such as fertilizers) – for specific manufacturing enterprises. Data on the energy balance reveals that 73% of BGP energy resources are concentrated in biomass.
- 1 December 2024
- Published by Walter de Gruyter GmbH in System Safety: Human - Technical Facility - Environment
- Vol. 6 (1) , 154-166
Open AccessProspects for Biogas Plant Implementation in the Unified Energy System
The study suggests using biogas plants as highly flexible energy sources. A critical step in deciding on their use involves predictive insights on the energy-efficiency metrics of the proposed biogas-based energy supply system compared to the current centralized model. Energy efficiency metrics were assessed through an analysis of energy balances, built using average statistical data on losses and energy consumption at biogas facilities. This approach is recommended for use in the early stages of defining technical requirements, enabling informed decisions about constructing or upgrading existing energy systems. Implementing biogas plants (BGP) as local power sources proves economically competitive when compared to centralized systems like thermal power plants (TPP) and boiler facilities. BGPs share a similar structure with these systems but operate with fewer areas needed for operations. Integrating BGPs can help reduce national dependence on imported energy, correct imbalances in the energy system due to their flexibility, and lower the cost of energy – whether electrical, thermal, or chemical (such as fertilizers) – for specific manufacturing enterprises. Data on the energy balance reveals that 73% of BGP energy resources are concentrated in biomass.
- 27 September 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Methodology for Designing the Capacity of Solar Power Plants for an Offline Home Network
Power generation through solar cell power plants is a widely adopted global practice, with the utilization of solar panels experiencing continuous expansion. Numerous factors contribute to this trend, with a primary emphasis on the utilization of alternative (renewable) energy sources, gaining heightened significance in recent times. The ongoing enhancements in solar cell power plant technology enable their versatile applications. Autonomous solar power plants, those not connected to industrial power grids, are specifically designed for powering isolated locations such as small country houses, summer cottages, sports grounds, and communication nodes. The novelty of this work lies in addressing critical gaps in existing literature by providing a systematic approach to dimensioning autonomous solar power plants, considering factors such as location, electrical load, and operational patterns. The practical proposed methodology provides practical results that serve as valuable tools for designing and optimizing ASPs. By accurately calculating component capacities based on load requirements and operational patterns, this approach ensures the reliable provision of electricity in off-grid locations. The practical outcome of this research enables the sustainable use of solar energy in remote areas, reducing the financial and labor costs associated with conventional power supply solutions.
- 27 September 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Methodology for Designing the Capacity of Solar Power Plants for an Offline Home Network
Power generation through solar cell power plants is a widely adopted global practice, with the utilization of solar panels experiencing continuous expansion. Numerous factors contribute to this trend, with a primary emphasis on the utilization of alternative (renewable) energy sources, gaining heightened significance in recent times. The ongoing enhancements in solar cell power plant technology enable their versatile applications. Autonomous solar power plants, those not connected to industrial power grids, are specifically designed for powering isolated locations such as small country houses, summer cottages, sports grounds, and communication nodes. The novelty of this work lies in addressing critical gaps in existing literature by providing a systematic approach to dimensioning autonomous solar power plants, considering factors such as location, electrical load, and operational patterns. The practical proposed methodology provides practical results that serve as valuable tools for designing and optimizing ASPs. By accurately calculating component capacities based on load requirements and operational patterns, this approach ensures the reliable provision of electricity in off-grid locations. The practical outcome of this research enables the sustainable use of solar energy in remote areas, reducing the financial and labor costs associated with conventional power supply solutions.
- Open Access
- 30 December 2020
- Published by National Technical University Kharkiv Polytechnic Institute in Bulletin of the National Technical University "KhPI". Series: Energy: Reliability and Energy Efficiency
- No. 1 (1),p. 84-88
IMPROVEMENT OF THE METHODOLOGY OF SUBSTANTIATION OF DISTRIBUTION NETWORKS RECONSTRUCTION
It is proposed to improve the methodology of substantiation of the distribution networks reconstruction by using a risk-oriented approach. It is substantiated that modern risk management technologies are based on engineering calculations with the use of competencies in financial knowledge and knowledge of quality management standards. The analysis showed that in the substantiation of the reconstruction of the objects of the distribution networks the priority objects are not determined, the estimated number of failures of the objects is not used in the calculations. The work aims is to improve the methodology of substantiation of the reconstruction of distribution networks with the development of a block diagram of the calculation algorithm to determine the priority of reconstruction objects. Methods of analysis of normative and reporting documents of distribution system operators and mathematical modelling of the duration of restoration work after the failure of distribution network facilities were used to solve the aims and tasks of work. The results of the analysis of the consequences of failures of overhead power lines concerning the duration of repairs are given. It is proved that in the conditions of incomplete financing of investment programs, the definition of priority objects of reconstruction is an influential factor for the efficiency of investments. A block diagram of the calculation algorithm has been developed for use in computer programs to determine the priority of reconstruction of distribution network objects after determining objects with critical consequences of failure. It is proposed to use a quantitative assessment of the technical condition of distribution network facilities, standards for labour intensity, and the number of service personnel in the algorithm for determining the priority of reconstruction of overhead power lines and transformer substations. It is concluded that in the conditions of incomplete financing of investment programs, the proposed methodology and block diagram of the algorithm for determining the priority objects of reconstruction of distribution networks can be useful to ensure the most effective work to improve the quality of electricity supply.
- 30 December 2020
- Published by National Technical University Kharkiv Polytechnic Institute in Bulletin of the National Technical University "KhPI". Series: Energy: Reliability and Energy Efficiency
- No. 1 (1),p. 84-88
Open AccessIMPROVEMENT OF THE METHODOLOGY OF SUBSTANTIATION OF DISTRIBUTION NETWORKS RECONSTRUCTION
It is proposed to improve the methodology of substantiation of the distribution networks reconstruction by using a risk-oriented approach. It is substantiated that modern risk management technologies are based on engineering calculations with the use of competencies in financial knowledge and knowledge of quality management standards. The analysis showed that in the substantiation of the reconstruction of the objects of the distribution networks the priority objects are not determined, the estimated number of failures of the objects is not used in the calculations. The work aims is to improve the methodology of substantiation of the reconstruction of distribution networks with the development of a block diagram of the calculation algorithm to determine the priority of reconstruction objects. Methods of analysis of normative and reporting documents of distribution system operators and mathematical modelling of the duration of restoration work after the failure of distribution network facilities were used to solve the aims and tasks of work. The results of the analysis of the consequences of failures of overhead power lines concerning the duration of repairs are given. It is proved that in the conditions of incomplete financing of investment programs, the definition of priority objects of reconstruction is an influential factor for the efficiency of investments. A block diagram of the calculation algorithm has been developed for use in computer programs to determine the priority of reconstruction of distribution network objects after determining objects with critical consequences of failure. It is proposed to use a quantitative assessment of the technical condition of distribution network facilities, standards for labour intensity, and the number of service personnel in the algorithm for determining the priority of reconstruction of overhead power lines and transformer substations. It is concluded that in the conditions of incomplete financing of investment programs, the proposed methodology and block diagram of the algorithm for determining the priority objects of reconstruction of distribution networks can be useful to ensure the most effective work to improve the quality of electricity supply.
- 1 May 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 134-138
Analysis of the energy balance of the local energy supply system based on the bioenergy complex
The structure of energy balance construction is considered as the basis for the creation of mathematical models of optimization of energy supply systems. The use of such models will increase the efficiency of the use of renewable energy in the local system and reduce the load on the centralized system in peak and semi-peak periods. The prospects of using BGP as an energy storage for other renewable energy sources and their advantages when used in the heating system, which will increase the production of commercial biogas, are considered. Also, the construction and analysis of energy balances in the process of designing the local energy supply system will allow: to identify the volume of excessive energy consumption and to develop measures for their elimination; to justify the choice of the most economical types of energy produced and the parameters of energy carriers used in technological processes; to decide on the choice or creation of the most rational systems of energy supply for consumers of industrial enterprises.
- 1 May 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 134-138
Analysis of the energy balance of the local energy supply system based on the bioenergy complex
The structure of energy balance construction is considered as the basis for the creation of mathematical models of optimization of energy supply systems. The use of such models will increase the efficiency of the use of renewable energy in the local system and reduce the load on the centralized system in peak and semi-peak periods. The prospects of using BGP as an energy storage for other renewable energy sources and their advantages when used in the heating system, which will increase the production of commercial biogas, are considered. Also, the construction and analysis of energy balances in the process of designing the local energy supply system will allow: to identify the volume of excessive energy consumption and to develop measures for their elimination; to justify the choice of the most economical types of energy produced and the parameters of energy carriers used in technological processes; to decide on the choice or creation of the most rational systems of energy supply for consumers of industrial enterprises.
- 1 December 2019
- Published by Dnipro University of Technology in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
- No. 6
The perfection of motivational model for improvement of power supply quality with using the one-way analysis of variance
The perfection of motivational model for improvement of power supply quality with using the one-way analysis of variance
- 1 December 2019
- Published by Dnipro University of Technology in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
- No. 6
The perfection of motivational model for improvement of power supply quality with using the one-way analysis of variance
The perfection of motivational model for improvement of power supply quality with using the one-way analysis of variance
- 1 September 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 161-165
The Incentive Scheme for Maintaining or Improving Power Supply Quality
The scheme for realization in system of automated control by the distributive company is offered. System Average Interruption Duration Index as dependent variable and territorial subdivisions of distribution network as independent variable in one-way analysis of variance are proposed. Examples of use System Average Interruption Duration Index as the Key Performance Indicators for an annual estimation of territorial subdivisions and workers of the distributive companies are examined.
- 1 September 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 161-165
The Incentive Scheme for Maintaining or Improving Power Supply Quality
The scheme for realization in system of automated control by the distributive company is offered. System Average Interruption Duration Index as dependent variable and territorial subdivisions of distribution network as independent variable in one-way analysis of variance are proposed. Examples of use System Average Interruption Duration Index as the Key Performance Indicators for an annual estimation of territorial subdivisions and workers of the distributive companies are examined.