José Garcia Vivas Miranda
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
José Garcia Vivas Miranda has a total of 21 co-authors. Here are the top co-authors by number of shared publications:
- José Maria Yusta
Department of Electrical Engineering, University of Zaragoza, Maria de Luna 3, 50018 Zaragoza, Spain
2 shared publications A. J. Urdaneta
Universidad Simon Bolivar; INELECTRA C. A.; Universidad de Zaragoza
1 shared publicationA.J. Urdaneta
1 shared publication- Camila Marinho Costa
Governo do Estado da Bahia, Brazil
1 shared publication - Cleber Luz Santos
Universidade Federal da Bahia (Salvador). Bahia, Brazil
1 shared publication - Diana Oliveira Noronha
Centro de Referência Estadual de Atenção à Saúde do Idoso
1 shared publication
Latest Publications
- 1 January 2022
- Published by Georg Thieme Verlag KG in Geriatrics Gerontology and Aging
- Vol. 16, 1-10
Health care network model for older adults: a co-creation and participatory action research approach
Objective: To develop a collaborative, multidisciplinary care model for older adults that improves interdisciplinary teamwork and increases access to specialized services for frail patients, helping solve management problems in the Brazilian Unified Health System. In the state of Bahia, the health care network for older adults requires better interaction and integration with the Unified Health System and the Unified System of Social Assistance to improve patient flow in the network. Methods: We used a co-creation and participatory action research approach based on reflection, data collection, interaction, and feedback with participants and stakeholders. Data was collected from health professionals, representatives of health agencies, and older adults through collective and individual interviews, reflective diaries, and direct communication. Results: An action plan involving members of the older adult care network was developed to put the new model into practice. A pilot study with a multidisciplinary team allowed adjustments and implementation of the model at our institution. Conclusions: The new model improved both the internal management of the State Reference Center for Older Adult Health Care (Centro de Referência Estadual de Atenção à Saúde do Idoso - CREASI) and its interaction with primary care, optimizing patient flow and establishing rules for shared management between CREASI and primary care institutions. In view of this, restructuring the care model reorganized relations between the agencies, expanding CREASI’s role in the management and systematization of older adult health.
- 1 January 2022
- Published by Georg Thieme Verlag KG in Geriatrics Gerontology and Aging
- Vol. 16, 1-10
Health care network model for older adults: a co-creation and participatory action research approach
Objective: To develop a collaborative, multidisciplinary care model for older adults that improves interdisciplinary teamwork and increases access to specialized services for frail patients, helping solve management problems in the Brazilian Unified Health System. In the state of Bahia, the health care network for older adults requires better interaction and integration with the Unified Health System and the Unified System of Social Assistance to improve patient flow in the network. Methods: We used a co-creation and participatory action research approach based on reflection, data collection, interaction, and feedback with participants and stakeholders. Data was collected from health professionals, representatives of health agencies, and older adults through collective and individual interviews, reflective diaries, and direct communication. Results: An action plan involving members of the older adult care network was developed to put the new model into practice. A pilot study with a multidisciplinary team allowed adjustments and implementation of the model at our institution. Conclusions: The new model improved both the internal management of the State Reference Center for Older Adult Health Care (Centro de Referência Estadual de Atenção à Saúde do Idoso - CREASI) and its interaction with primary care, optimizing patient flow and establishing rules for shared management between CREASI and primary care institutions. In view of this, restructuring the care model reorganized relations between the agencies, expanding CREASI’s role in the management and systematization of older adult health.
- 1 August 2006
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Control of Thyristor Controlled Series Capacitor Based on Instantaneous Power Theory
This paper describes the development of a control system based on PQ theory (instantaneous power) for the thyristor controlled series capacitor (TCSC). This theory has been successfully used in distribution networks for active filter control. The main advantage of this scheme is its fast response time, which allows almost instantaneous control in the line power flow. Simulated results obtained with the ATP-EMTP for different operating conditions are presented
- 1 August 2006
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Control of Thyristor Controlled Series Capacitor Based on Instantaneous Power Theory
This paper describes the development of a control system based on PQ theory (instantaneous power) for the thyristor controlled series capacitor (TCSC). This theory has been successfully used in distribution networks for active filter control. The main advantage of this scheme is its fast response time, which allows almost instantaneous control in the line power flow. Simulated results obtained with the ATP-EMTP for different operating conditions are presented
- 7 November 2002
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 17 (3) , 864-869
A linear programming methodology for the optimization of electric power-generation schemes
A mathematical model, based upon the application of a linear-integer programming algorithm, is presented for the optimum selection of independent electric power-generation schemes in industrial power systems, taking reliability considerations into account. The problem is formulated as a mathematical programming problem-considering investment costs, fuel costs, operation and maintenance costs, power balance, maximum and minimum limits on the generated power of the units, along with reliability considerations, such as the unavailability of the generation scheme. These considerations include assumptions made and simplifications performed to obtain an accurate enough linear model. The problem is solved using a conventional branch and bound algorithm for linear-integer programming, yielding to the optimum number of units, as well as the corresponding size and type. Results are presented for the application of the proposed methodology to a real case of an industrial power system. The technique has proven to be a valuable tool for the planning engineer.
- 7 November 2002
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 17 (3) , 864-869
A linear programming methodology for the optimization of electric power-generation schemes
A mathematical model, based upon the application of a linear-integer programming algorithm, is presented for the optimum selection of independent electric power-generation schemes in industrial power systems, taking reliability considerations into account. The problem is formulated as a mathematical programming problem-considering investment costs, fuel costs, operation and maintenance costs, power balance, maximum and minimum limits on the generated power of the units, along with reliability considerations, such as the unavailability of the generation scheme. These considerations include assumptions made and simplifications performed to obtain an accurate enough linear model. The problem is solved using a conventional branch and bound algorithm for linear-integer programming, yielding to the optimum number of units, as well as the corresponding size and type. Results are presented for the application of the proposed methodology to a real case of an industrial power system. The technique has proven to be a valuable tool for the planning engineer.
- 1 July 2002
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Power Engineering Review
- Vol. 22 (7) , 58
A Linear Programming Methodology for the Optimization of Electric Power Generation Schemes
A mathematical model, based upon the application of a linear-integer programming algorithm, is presented for the optimum selection of independent electric power generation schemes in industrial power systems, taking into account reliability considerations. The problem is formulated as a mathematical programming problem, considering investment costs, fuel costs, operation and maintenance costs, power balance, maximum and minimum limits on the generated power of the units, as well as reliability considerations such as the unavailability of the generation scheme. These considerations include assumptions taken and simplifications performed in order to obtain an accurate enough linear model. The problem is solved using a conventional branch and bound algorithm for linear-integer programming, yielding to the optimum number of units, as well as the correspondent size and type. Results are presented for the application of the proposed methodology to a real case of an industrial power system. The technique is proved as a valuable tool for the planning engineer.
- 1 July 2002
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Power Engineering Review
- Vol. 22 (7) , 58
A Linear Programming Methodology for the Optimization of Electric Power Generation Schemes
A mathematical model, based upon the application of a linear-integer programming algorithm, is presented for the optimum selection of independent electric power generation schemes in industrial power systems, taking into account reliability considerations. The problem is formulated as a mathematical programming problem, considering investment costs, fuel costs, operation and maintenance costs, power balance, maximum and minimum limits on the generated power of the units, as well as reliability considerations such as the unavailability of the generation scheme. These considerations include assumptions taken and simplifications performed in order to obtain an accurate enough linear model. The problem is solved using a conventional branch and bound algorithm for linear-integer programming, yielding to the optimum number of units, as well as the correspondent size and type. Results are presented for the application of the proposed methodology to a real case of an industrial power system. The technique is proved as a valuable tool for the planning engineer.