Ahmed Abuelyamen
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Ahmed Abuelyamen has a total of 12 co-authors. Here are the top co-authors by number of shared publications:
R. Ben-Mansour
3 shared publicationsEsmail M.A. Mokheimer
2 shared publications- Naef A. A. Qasem
Department of Aerospace Engineering, King Fahd University of Petroleum & Minerals (KFUPM), Dhahran, Saudi Arabia
2 shared publications - Rached Ben-Mansour
Department of Mechanical Engineering, King Fahd University of Petroleum and Minerals, Dhahran 31261, Saudi Arabia
2 shared publications - Ahmed K. Alkaabi
Department of Mechanical and Nuclear Engineering, Khalifa University of Science and Technology, Abu Dhabi P.O. Box 127788, United Arab Emirates
1 shared publication H. Abualhamayel
1 shared publication
Latest Publications
- Open Access
- 11 November 2025
- Published by Elsevier in Applied Ocean Research
- Vol. 165
Critical roles of mass, spring, and damping ratios in nonlinear energy sink vortex-induced vibrational control: CFD & optimization
- 11 November 2025
- Published by Elsevier in Applied Ocean Research
- Vol. 165
Open AccessCritical roles of mass, spring, and damping ratios in nonlinear energy sink vortex-induced vibrational control: CFD & optimization
- 1 September 2020
- Published by Elsevier in International Journal of Hydrogen Energy
- Vol. 45 (43) , 23006-23019
CFD modeling of hydrogen separation through Pd-based membrane
- 1 September 2020
- Published by Elsevier in International Journal of Hydrogen Energy
- Vol. 45 (43) , 23006-23019
CFD modeling of hydrogen separation through Pd-based membrane
- 1 May 2020
- Published by Elsevier in Energy Conversion and Management
- Vol. 212
Thermal design and management towards high capacity CO2 adsorption systems
- 1 May 2020
- Published by Elsevier in Energy Conversion and Management
- Vol. 212
Thermal design and management towards high capacity CO2 adsorption systems
- 1 November 2017
- Published by Elsevier in Energy Conversion and Management
- Vol. 152, 354-365
CFD analysis of radiation impact on Stirling engine performance
- 1 November 2017
- Published by Elsevier in Energy Conversion and Management
- Vol. 152, 354-365
CFD analysis of radiation impact on Stirling engine performance
- 5 October 2017
- Published by American Chemical Society (ACS) in Energy & Fuels
- Vol. 31 (11) , 12540-12551
Oxy-fuel Combustion in a 600 MW Gaseous Fuel Tangentially Fired Boiler
- 5 October 2017
- Published by American Chemical Society (ACS) in Energy & Fuels
- Vol. 31 (11) , 12540-12551
Oxy-fuel Combustion in a 600 MW Gaseous Fuel Tangentially Fired Boiler
- 1 August 2017
- Published by Elsevier in Energy Conversion and Management
- Vol. 145, 53-63
Parametric study on beta-type Stirling engine
- 1 August 2017
- Published by Elsevier in Energy Conversion and Management
- Vol. 145, 53-63
Parametric study on beta-type Stirling engine
- 11 November 2016
- Published by ASME International
Techno-Economic Study of Installing 10 MW PV Power Plant in Sudan
This work investigates the installation of a 10 MW solar PV power plant in a sustainable city in Sudan. Initially, the climatic data such as relative humidity, temperature and horizontal solar radiation over 30 cities in Sudan were collected from NASA web page, then the behavior of all climatic data was analyzed. Annual daily solar radiation on a tilted surface was also calculated over the 30 locations around the country. It was found that the maximum value of tilted average solar radiation is 6.61 KWh/day at Dungola from fixed mode and 8.93 kWh/m2/day from tracking mode. Consequently, the location was selected as an optimum spot for building the solar PV power plant. Additionally, the available solar PV panels on the market were judged according to the maximum module efficiency and high ratio value of module capacity to frame area. The project lifetime is considered as 25 years. RETScreen v.4 software was used to simulate the feasibility analysis of the project based on electric power generated from fixed and tracking modes of operation, financial analysis and greenhouse gas emissions. The study showed that, technically, the proposed plant can generate up to 16.209 GWh of electric energy annually from the fixed system and 21.828 GWh from the tracking system. Environmentally, the annual net GHG reduction is 16,000 and 21,600 tons of CO2 from fixed and tracking systems respectively. From a financial standpoint, the cost-effective indicators were calculated and it was found that the IRR and payback period for the fixed system plant were 0.6% and 23.6 years, respectively. While for tracking system plant, figures were 2.66% and 19.4 years, respectively.
- 11 November 2016
- Published by ASME International
Techno-Economic Study of Installing 10 MW PV Power Plant in Sudan
This work investigates the installation of a 10 MW solar PV power plant in a sustainable city in Sudan. Initially, the climatic data such as relative humidity, temperature and horizontal solar radiation over 30 cities in Sudan were collected from NASA web page, then the behavior of all climatic data was analyzed. Annual daily solar radiation on a tilted surface was also calculated over the 30 locations around the country. It was found that the maximum value of tilted average solar radiation is 6.61 KWh/day at Dungola from fixed mode and 8.93 kWh/m2/day from tracking mode. Consequently, the location was selected as an optimum spot for building the solar PV power plant. Additionally, the available solar PV panels on the market were judged according to the maximum module efficiency and high ratio value of module capacity to frame area. The project lifetime is considered as 25 years. RETScreen v.4 software was used to simulate the feasibility analysis of the project based on electric power generated from fixed and tracking modes of operation, financial analysis and greenhouse gas emissions. The study showed that, technically, the proposed plant can generate up to 16.209 GWh of electric energy annually from the fixed system and 21.828 GWh from the tracking system. Environmentally, the annual net GHG reduction is 16,000 and 21,600 tons of CO2 from fixed and tracking systems respectively. From a financial standpoint, the cost-effective indicators were calculated and it was found that the IRR and payback period for the fixed system plant were 0.6% and 23.6 years, respectively. While for tracking system plant, figures were 2.66% and 19.4 years, respectively.