John Gambatese
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
John Gambatese has a total of 100 co-authors. Here are the top co-authors by number of shared publications:
- Ali Amer Karakhan
Univ. of Baghdad
17 shared publications - Chukwuma Nnaji
Texas A&M University
8 shared publications - Matthew Ryan Hallowell
Univ. of Colorado at Boulder
7 shared publications - Ziyu Jin
Colorado State Univ
6 shared publications - Abdulaziz Alotaibi
Department of Civil Engineering, Faculty of Engineering, Islamic University of Madinah, Madinah 42351, Saudi Arabia
5 shared publications - Chukwuma Nnaji
Ph.D. Student, School of Civil and Construction Engineering, Oregon State Univ., 101 Kearney Hall, Corvallis, OR 97331
5 shared publications
Latest Publications
- Open Access
- 1 December 2026
- Published by Engineering, Project, and Production Management (EPPM) in Journal of Engineering, Project, and Production Management
- Vol. 16  (8) , 1-9
Safety Constructability of Different Project Delivery Methods on Construction Projects
Design professionals play a pivotal role in shaping the built environment, not only through the development of drawings and technical specifications but also by serving as a proxy between project owners and constructors in certain project delivery methods. Every design must fulfill the owner’s objectives and project specific criteria that include quality, cost, time, and, crucially, construction safety, all of which can vary across projects. The study objective was to investigate the extent to which designers prioritize worker safety during the design phase across three categories of project delivery methods: non-collaborative, collaborative, and mixed. To achieve the study objective, an online survey was utilized to collect data from 62 designers working in the Architecture, Engineering, and Construction (AEC) industry. Following survey data collection, statistical analysis was used to examine the extent to which designers focus on worker safety relative to other design criteria for each delivery method. The survey findings reveal that, within the studied sample, designers’ attention to construction worker safety remained relatively consistent regardless of the delivery method employed. Thus, no statistically significant relationship was found between the delivery method and the degree of safety emphasis among designers. However, collaborative delivery methods that foster greater transparency and interdisciplinary engagement are expected to positively influence project safety performance. Industry stakeholders interested in improving safety performance are encouraged to adopt collaborative delivery approaches and implement structured interventions, such as formal safety constructability reviews, to actively integrate safety into the early stages of project design.
- 1 December 2026
- Published by Engineering, Project, and Production Management (EPPM) in Journal of Engineering, Project, and Production Management
- Vol. 16  (8) , 1-9
Open AccessSafety Constructability of Different Project Delivery Methods on Construction Projects
Design professionals play a pivotal role in shaping the built environment, not only through the development of drawings and technical specifications but also by serving as a proxy between project owners and constructors in certain project delivery methods. Every design must fulfill the owner’s objectives and project specific criteria that include quality, cost, time, and, crucially, construction safety, all of which can vary across projects. The study objective was to investigate the extent to which designers prioritize worker safety during the design phase across three categories of project delivery methods: non-collaborative, collaborative, and mixed. To achieve the study objective, an online survey was utilized to collect data from 62 designers working in the Architecture, Engineering, and Construction (AEC) industry. Following survey data collection, statistical analysis was used to examine the extent to which designers focus on worker safety relative to other design criteria for each delivery method. The survey findings reveal that, within the studied sample, designers’ attention to construction worker safety remained relatively consistent regardless of the delivery method employed. Thus, no statistically significant relationship was found between the delivery method and the degree of safety emphasis among designers. However, collaborative delivery methods that foster greater transparency and interdisciplinary engagement are expected to positively influence project safety performance. Industry stakeholders interested in improving safety performance are encouraged to adopt collaborative delivery approaches and implement structured interventions, such as formal safety constructability reviews, to actively integrate safety into the early stages of project design.
- 7 September 2026
- Published by Emerald Publishing in Proceedings of the Institution of Civil Engineers - Management, Procurement and Law
- p. 1-11
Mapping AI-driven construction risk and safety: a bibliometric analysis (2000–2025)
This study maps the evolution of artificial intelligence (AI)-driven risk management and safety research in construction through a bibliometric and science-mapping review of Scopus-indexed journal articles published between 2000 and 2025. From 398 records, screening yielded 272 English-language documents and 177 final journal articles. Performance analysis used Microsoft Excel, OpenRefine, and biblioMagika, while science mapping used the Bibliometrix R package and VOSviewer, supported by manual verification of AI-assisted synthesis. The study integrates performance indicators, network analysis, thematic validation, and gap-oriented interpretation to extend previous bibliometric research on occupational safety and health. Results show a shift from early sensor-based monitoring towards predictive analytics, computer vision, wearable systems, digital twins, conversational AI, and autonomous inspection. Seven clusters were identified: AI safety frameworks; predictive analytics and risk modelling; real-time monitoring and machine safety; worker health monitoring; socio-technical and ethical AI; AI-based safety training and virtual environments; and autonomous inspection. The findings emphasise a transition from reactive practices to proactive, data-driven safety management. Overall, the review provides a structured framework for advancing safer, smarter, and more resilient construction operations.
- 7 September 2026
- Published by Emerald Publishing in Proceedings of the Institution of Civil Engineers - Management, Procurement and Law
- p. 1-11
Mapping AI-driven construction risk and safety: a bibliometric analysis (2000–2025)
This study maps the evolution of artificial intelligence (AI)-driven risk management and safety research in construction through a bibliometric and science-mapping review of Scopus-indexed journal articles published between 2000 and 2025. From 398 records, screening yielded 272 English-language documents and 177 final journal articles. Performance analysis used Microsoft Excel, OpenRefine, and biblioMagika, while science mapping used the Bibliometrix R package and VOSviewer, supported by manual verification of AI-assisted synthesis. The study integrates performance indicators, network analysis, thematic validation, and gap-oriented interpretation to extend previous bibliometric research on occupational safety and health. Results show a shift from early sensor-based monitoring towards predictive analytics, computer vision, wearable systems, digital twins, conversational AI, and autonomous inspection. Seven clusters were identified: AI safety frameworks; predictive analytics and risk modelling; real-time monitoring and machine safety; worker health monitoring; socio-technical and ethical AI; AI-based safety training and virtual environments; and autonomous inspection. The findings emphasise a transition from reactive practices to proactive, data-driven safety management. Overall, the review provides a structured framework for advancing safer, smarter, and more resilient construction operations.
- Open Access
- 25 May 2026
- Published by Hanoi University of Civil Engineering (HUCE) in Journal of Science and Technology in Civil Engineering
- Vol. 20  (2S) , 1-13
Deep learning for classifying and predicting risk factors in retrospective construction fatality reports
Despite advances in safety protocols, fatal incidents continue to occur in the construction industry. The National Institute for Occupational Safety and Health (NIOSH), Fatality Assessment and Control Evaluation (FACE) program in the U.S. documents hundreds of fatalities; however, the unstructured narrative nature of these reports constrains systematic analysis. This pilot study applies deep learning to classify and interpret fatal construction incidents from 265 NIOSH FACE reports, primarily using narrative text, with structured attributes supporting annotation and label development. The approach involved curating and labeling incident narratives, fine-tuning transformer-based models for supervised classification, and evaluating performance across four targets: Incident Type, Project Type, Incident Causation, and Temporary Structure Type. Results indicated strong performance for Incident Type (accuracy = 0.981 ± 0.019; macro-F1 = 0.933 ± 0.108), moderate performance for Temporary Structure Type (accuracy = 0.830 ± 0.013), and mixed outcomes for Incident Causation and Project Type due to semantic overlap and class imbalance. Overall, the findings demonstrate the feasibility of converting narrative fatality data into predictive insights and support the development of scalable, data-driven frameworks for improving construction safety research and intervention.
- 25 May 2026
- Published by Hanoi University of Civil Engineering (HUCE) in Journal of Science and Technology in Civil Engineering
- Vol. 20  (2S) , 1-13
Open AccessDeep learning for classifying and predicting risk factors in retrospective construction fatality reports
Despite advances in safety protocols, fatal incidents continue to occur in the construction industry. The National Institute for Occupational Safety and Health (NIOSH), Fatality Assessment and Control Evaluation (FACE) program in the U.S. documents hundreds of fatalities; however, the unstructured narrative nature of these reports constrains systematic analysis. This pilot study applies deep learning to classify and interpret fatal construction incidents from 265 NIOSH FACE reports, primarily using narrative text, with structured attributes supporting annotation and label development. The approach involved curating and labeling incident narratives, fine-tuning transformer-based models for supervised classification, and evaluating performance across four targets: Incident Type, Project Type, Incident Causation, and Temporary Structure Type. Results indicated strong performance for Incident Type (accuracy = 0.981 ± 0.019; macro-F1 = 0.933 ± 0.108), moderate performance for Temporary Structure Type (accuracy = 0.830 ± 0.013), and mixed outcomes for Incident Causation and Project Type due to semantic overlap and class imbalance. Overall, the findings demonstrate the feasibility of converting narrative fatality data into predictive insights and support the development of scalable, data-driven frameworks for improving construction safety research and intervention.
- 1 February 2026
- Published by American Society of Civil Engineers (ASCE) in Journal of Structural Design and Construction Practice
- Vol. 31  (1)
Strategies to Achieve Professional Workforce Maturity in Construction
- 1 February 2026
- Published by American Society of Civil Engineers (ASCE) in Journal of Structural Design and Construction Practice
- Vol. 31  (1)
Strategies to Achieve Professional Workforce Maturity in Construction
- Open Access
- 19 June 2025
- Published by Purdue University (bepress) in CIB Conferences
- Vol. 1  (1) , 393
Challenges and Benefits of Using BIM Technologies to Improve Construction Safety: An Exploratory Case Study
Building Information Modeling (BIM) continues to experience rapid growth in the construction industry. BIM changes how design and construction can be approached by using algorithms that automatically assess various elements of project designs and construction, including potential safety risk. Compared with other approaches which evaluate safety risk during the design and execution phases, BIM models can help reduce the number of workers and resources used to ensure proper safety management. This paper presents a research study to investigate BIM technologies (e.g., Robotic Total Station and Navisworks) commonly implemented and any challenges and needed improvements to benefit construction safety. The research consisted of an explanatory investigation of a case study to gather comprehensive data on BIM implementation. The case study project was a life sciences building project in Portland, Oregon, USA, where the project personnel used BIM technologies to visualize the project and simulate environmental conditions for coordination to ensure efficient installation, stay on schedule, and identify potential hazards. The study revealed major challenges, including: (1) familiarity with BIM expectations, (2) financial challenges, and (3) turnover to the owner. The research contributions and outcomes benefit construction practitioners when training engineers to use BIM to predict potential hazards. The research also provides future recommendations on the use of BIM for construction safety management and practices.
- 19 June 2025
- Published by Purdue University (bepress) in CIB Conferences
- Vol. 1  (1) , 393
Open AccessChallenges and Benefits of Using BIM Technologies to Improve Construction Safety: An Exploratory Case Study
Building Information Modeling (BIM) continues to experience rapid growth in the construction industry. BIM changes how design and construction can be approached by using algorithms that automatically assess various elements of project designs and construction, including potential safety risk. Compared with other approaches which evaluate safety risk during the design and execution phases, BIM models can help reduce the number of workers and resources used to ensure proper safety management. This paper presents a research study to investigate BIM technologies (e.g., Robotic Total Station and Navisworks) commonly implemented and any challenges and needed improvements to benefit construction safety. The research consisted of an explanatory investigation of a case study to gather comprehensive data on BIM implementation. The case study project was a life sciences building project in Portland, Oregon, USA, where the project personnel used BIM technologies to visualize the project and simulate environmental conditions for coordination to ensure efficient installation, stay on schedule, and identify potential hazards. The study revealed major challenges, including: (1) familiarity with BIM expectations, (2) financial challenges, and (3) turnover to the owner. The research contributions and outcomes benefit construction practitioners when training engineers to use BIM to predict potential hazards. The research also provides future recommendations on the use of BIM for construction safety management and practices.
- Open Access
- 19 June 2025
- Published by Purdue University (bepress) in CIB Conferences
- Vol. 1  (1) , 391
Evaluation of Temporary Structures Contractual Frameworks: An Industry-Wide Survey Study
Temporary structures are integral to construction. Yet, the complexities and risks associated with these structures often need to be more adequately addressed in standard construction manager/general contractor (CM/GC) contracts. This gap in practice underscores the need for an in-depth exploration of contractual challenges and potential improvements related to temporary structures. This study investigated the barriers to including comprehensive risk provisions in standard CM/GC contracts for temporary structures and assessed industry professionals' perspectives on their effectiveness and potential improvements. Employing a survey questionnaire distributed across all 50 states in the United States, the research garnered 465 valid responses from various industry sectors and organizational sizes. The findings reveal a significant consensus among professionals regarding the inadequacy of current CM/GC standard contracts in addressing the risks of temporary structures. Over half of the respondents attribute this gap to a transfer of liability to construction contractors, while others cite strategic avoidance of comprehensive terms to prevent legal disputes. Interestingly, most respondents acknowledge the importance of incorporating detailed contractual provisions for quality, safety, and environmental issues, recognizing their role in enhancing contractual robustness. However, opinions are divided on the need to detail owner/client responsibilities and the effectiveness of provisions for schedule and price impacts. The study suggests an industry-wide need for more robust contractual terms, particularly in managing legal obligations and specific risk types associated with temporary structures. These insights contribute to understanding the current contractual challenges and pave the way for adopting innovative contractual frameworks in the construction industry.
- 19 June 2025
- Published by Purdue University (bepress) in CIB Conferences
- Vol. 1  (1) , 391
Open AccessEvaluation of Temporary Structures Contractual Frameworks: An Industry-Wide Survey Study
Temporary structures are integral to construction. Yet, the complexities and risks associated with these structures often need to be more adequately addressed in standard construction manager/general contractor (CM/GC) contracts. This gap in practice underscores the need for an in-depth exploration of contractual challenges and potential improvements related to temporary structures. This study investigated the barriers to including comprehensive risk provisions in standard CM/GC contracts for temporary structures and assessed industry professionals' perspectives on their effectiveness and potential improvements. Employing a survey questionnaire distributed across all 50 states in the United States, the research garnered 465 valid responses from various industry sectors and organizational sizes. The findings reveal a significant consensus among professionals regarding the inadequacy of current CM/GC standard contracts in addressing the risks of temporary structures. Over half of the respondents attribute this gap to a transfer of liability to construction contractors, while others cite strategic avoidance of comprehensive terms to prevent legal disputes. Interestingly, most respondents acknowledge the importance of incorporating detailed contractual provisions for quality, safety, and environmental issues, recognizing their role in enhancing contractual robustness. However, opinions are divided on the need to detail owner/client responsibilities and the effectiveness of provisions for schedule and price impacts. The study suggests an industry-wide need for more robust contractual terms, particularly in managing legal obligations and specific risk types associated with temporary structures. These insights contribute to understanding the current contractual challenges and pave the way for adopting innovative contractual frameworks in the construction industry.
- 18 December 2024
- Published by Springer Nature
- p. 271-286
Identification and Quantification of the Impact of Work Components on Mental Workload Based on Construction Worker Perspective
- 18 December 2024
- Published by Springer Nature
- p. 271-286
Identification and Quantification of the Impact of Work Components on Mental Workload Based on Construction Worker Perspective
- 1 June 2024
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 150  (6)
Musculoskeletal Disorder Risk Assessment in Modern Ready-Made Concrete Formwork Construction
- 1 June 2024
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 150  (6)
Musculoskeletal Disorder Risk Assessment in Modern Ready-Made Concrete Formwork Construction