Polina Ivanova
Research Subjects
Polina Ivanova has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
O. Linkevics
Riga Technical University , 12/1 Azenes Street, Riga , LV-1048 , Latvia
2 shared publicationsA. Cers
Latvenergo, AS, 12 Pulkveža Brieža Str., Riga, LV-1230, LATVIA
1 shared publication- Antans Sauhats
Faculty of Computer Science, Information Technology and Energy, Institute of Industrial Electronics, Electrical Engineering and Energy, Riga Technical University, LV-1048 Riga, Latvia
1 shared publication E. Grebesh
Riga Technical University , 12/1 Azenes Street, Riga , LV-1048 , Latvia
1 shared publication- Olegs Linkevics
Latvia
1 shared publication
Latest Publications
- 21 August 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Industry Applications
- Vol. 55 (1) , 35-42
District Heating Technologies: Is it Chance for CHP Plants in Variable and Competitive Operation Conditions?
District heating system with power generation is integrated in electricity system since combined heat and power (CHP) plants are used for heat supply. Nowadays the changes happen in electricity system and conventional CHP plant operation. They are caused by wide integration of renewable energy sources (RES) in energy production process, feed-in tariffs for RES, the implementation of market mechanisms and the incremented requirement in energy efficiency and flexibility of power plants. This creates new opportunities and conditions for district heating (DH) and power system cooperation though the use of DH flexible technologies, i.e. power-to-heat (P2H) technologies (electric boilers (EB) and heat pumps). The use of P2H technologies is limited and they are not costs-efficient due to electricity tariff formed components. Two Targets of EB use at power plant are evaluated, omitting these components, to shows the usefulness and significant of these technology for conventional generation.
- 21 August 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Industry Applications
- Vol. 55 (1) , 35-42
District Heating Technologies: Is it Chance for CHP Plants in Variable and Competitive Operation Conditions?
District heating system with power generation is integrated in electricity system since combined heat and power (CHP) plants are used for heat supply. Nowadays the changes happen in electricity system and conventional CHP plant operation. They are caused by wide integration of renewable energy sources (RES) in energy production process, feed-in tariffs for RES, the implementation of market mechanisms and the incremented requirement in energy efficiency and flexibility of power plants. This creates new opportunities and conditions for district heating (DH) and power system cooperation though the use of DH flexible technologies, i.e. power-to-heat (P2H) technologies (electric boilers (EB) and heat pumps). The use of P2H technologies is limited and they are not costs-efficient due to electricity tariff formed components. Two Targets of EB use at power plant are evaluated, omitting these components, to shows the usefulness and significant of these technology for conventional generation.
- Open Access
- 1 February 2018
- Published by Walter de Gruyter GmbH in Latvian Journal of Physics and Technical Sciences
- Vol. 55 (1) , 15-21
Optimisation of Combined Cycle Gas Turbine Power Plant in Intraday Market: Riga CHP-2 Example
In the research, the influence of optimised combined cycle gas turbine unit – according to the previously developed EM & OM approach with its use in the intraday market – is evaluated on the generation portfolio. It consists of the two combined cycle gas turbine units. The introduced evaluation algorithm saves the power and heat balance before and after the performance of EM & OM approach by making changes in the generation profile of units. The aim of this algorithm is profit maximisation of the generation portfolio. The evaluation algorithm is implemented in multi-paradigm numerical computing environment MATLab on the example of Riga CHP-2. The results show that the use of EM & OM approach in the intraday market can be profitable or unprofitable. It depends on the initial state of generation units in the intraday market and on the content of the generation portfolio.
- 1 February 2018
- Published by Walter de Gruyter GmbH in Latvian Journal of Physics and Technical Sciences
- Vol. 55 (1) , 15-21
Open AccessOptimisation of Combined Cycle Gas Turbine Power Plant in Intraday Market: Riga CHP-2 Example
In the research, the influence of optimised combined cycle gas turbine unit – according to the previously developed EM & OM approach with its use in the intraday market – is evaluated on the generation portfolio. It consists of the two combined cycle gas turbine units. The introduced evaluation algorithm saves the power and heat balance before and after the performance of EM & OM approach by making changes in the generation profile of units. The aim of this algorithm is profit maximisation of the generation portfolio. The evaluation algorithm is implemented in multi-paradigm numerical computing environment MATLab on the example of Riga CHP-2. The results show that the use of EM & OM approach in the intraday market can be profitable or unprofitable. It depends on the initial state of generation units in the intraday market and on the content of the generation portfolio.
- Open Access
- 1 December 2015
- Published by Walter de Gruyter GmbH in Latvian Journal of Physics and Technical Sciences
- Vol. 52 (6) , 22-37
The Evaluation of Feasibility of Thermal Energy Storage System at Riga TPP-2
The installation of thermal energy storage system (TES) provides the optimisation of energy source, energy security supply, power plant operation and energy production flexibility. The aim of the present research is to evaluate the feasibility of thermal energy system installation at Riga TPP–2. The six modes were investigated: four for non-heating periods and two for heating periods. Different research methods were used: data statistic processing, data analysis, analogy, forecasting, financial method and correlation and regression method. In the end, the best mode was chosen – the increase of cogeneration unit efficiency during the summer
- 1 December 2015
- Published by Walter de Gruyter GmbH in Latvian Journal of Physics and Technical Sciences
- Vol. 52 (6) , 22-37
Open AccessThe Evaluation of Feasibility of Thermal Energy Storage System at Riga TPP-2
The installation of thermal energy storage system (TES) provides the optimisation of energy source, energy security supply, power plant operation and energy production flexibility. The aim of the present research is to evaluate the feasibility of thermal energy system installation at Riga TPP–2. The six modes were investigated: four for non-heating periods and two for heating periods. Different research methods were used: data statistic processing, data analysis, analogy, forecasting, financial method and correlation and regression method. In the end, the best mode was chosen – the increase of cogeneration unit efficiency during the summer