Hadi Mokhtari
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Research Interests
Hadi Mokhtari has a total of 83 co-authors. Here are the top co-authors by number of shared publications:
- Ali Salmasnia
Department of Industrial Engineering, Faculty of Engineering, University of Qom, Qom, Iran
18 shared publications Ali Fallahi
Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran
5 shared publications- Ali Fallahi
Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran
5 shared publications Ali Salmasnia
Affiliation Department of Industrial Engineering, Faculty of Engineering, University of Qom, Qom, Iran
5 shared publicationsAliakbar Hasani
Associate professor, Department of Industrial Engineering and Management, Shahrood University of Technology, Shahrood, Iran
5 shared publicationsAli Ghorbanian
Esfarayen University of Technology
4 shared publications
Latest Publications
- Open Access
- 9 September 2026
- Published by Springer Nature in Discover Sustainability
Designing a humanitarian supply chain network with integrated inventory and transportation resilience
- 9 September 2026
- Published by Springer Nature in Discover Sustainability
Open AccessDesigning a humanitarian supply chain network with integrated inventory and transportation resilience
- Open Access
- 23 July 2026
- Published by Public Library of Science (PLoS) in PLOS ONE
- Vol. 21  (7) , e0343430
Service-oriented cloud manufacturing systems: Balancing profit, customer satisfaction, and resource fairness
The rapid growth of customized demand and geographically distributed manufacturing resources has increased the need for integrated decision-making in cloud manufacturing systems. In such environments, scheduling, logistics, pricing, and quality decisions are highly interrelated and significantly affect both system profitability and customer satisfaction. However, most existing studies address these decisions separately and pay limited attention to customer satisfaction and fairness. To address this gap, this paper proposes a multi-objective mixed-integer programming model that simultaneously integrates scheduling, logistics, pricing, and quality decisions while explicitly considering customer satisfaction and fairness among customers. The model pursues three objectives: maximizing cloud manufacturing system profit, maximizing customer satisfaction as a function of price and product quality, and minimizing unfairness among customers. An LP-metric approach is employed to aggregate the objectives, and the model is solved using CPLEX in GAMS. Computational experiments on small-, medium-, and large-scale instances demonstrate the effectiveness of the proposed framework. The results show that ignoring logistics decisions, customer satisfaction, or earliness/tardiness penalties leads to inferior solutions. Furthermore, a Genetic Algorithm is developed for large-scale instances, where the exact approach becomes computationally demanding. Comparative results indicate that the proposed heuristic provides high-quality solutions with significantly lower computational times for large-scale problems. The findings confirm the effectiveness and scalability of the proposed framework for integrated decision-making in cloud manufacturing systems.
- 23 July 2026
- Published by Public Library of Science (PLoS) in PLOS ONE
- Vol. 21  (7) , e0343430
Open AccessService-oriented cloud manufacturing systems: Balancing profit, customer satisfaction, and resource fairness
The rapid growth of customized demand and geographically distributed manufacturing resources has increased the need for integrated decision-making in cloud manufacturing systems. In such environments, scheduling, logistics, pricing, and quality decisions are highly interrelated and significantly affect both system profitability and customer satisfaction. However, most existing studies address these decisions separately and pay limited attention to customer satisfaction and fairness. To address this gap, this paper proposes a multi-objective mixed-integer programming model that simultaneously integrates scheduling, logistics, pricing, and quality decisions while explicitly considering customer satisfaction and fairness among customers. The model pursues three objectives: maximizing cloud manufacturing system profit, maximizing customer satisfaction as a function of price and product quality, and minimizing unfairness among customers. An LP-metric approach is employed to aggregate the objectives, and the model is solved using CPLEX in GAMS. Computational experiments on small-, medium-, and large-scale instances demonstrate the effectiveness of the proposed framework. The results show that ignoring logistics decisions, customer satisfaction, or earliness/tardiness penalties leads to inferior solutions. Furthermore, a Genetic Algorithm is developed for large-scale instances, where the exact approach becomes computationally demanding. Comparative results indicate that the proposed heuristic provides high-quality solutions with significantly lower computational times for large-scale problems. The findings confirm the effectiveness and scalability of the proposed framework for integrated decision-making in cloud manufacturing systems.
- Open Access
- 12 July 2026
- Published by Springer Nature in Discover Sustainability
- Vol. 7  (1)
A multi-objective environmental and economic design of closed-loop supply chain and production planning under a circular economy perspective
- 12 July 2026
- Published by Springer Nature in Discover Sustainability
- Vol. 7  (1)
Open AccessA multi-objective environmental and economic design of closed-loop supply chain and production planning under a circular economy perspective
- Open Access
- 9 July 2026
- Published by Public Library of Science (PLoS) in PLOS ONE
- Vol. 21  (7) , e0352121
A multi-product, multi-period vaccine supply chain network planning with injection centers and storage conditions
This study develops a mixed-integer linear programming model for a multi-product, multi-period vaccine supply chain network that incorporates injection centers and heterogeneous storage conditions, including cold and ultra-cold refrigeration. The model captures key operational decisions such as distribution center location, vaccine allocation, and storage configuration under capacity and demand constraints, while ensuring no shortage at injection centers. To efficiently solve large-scale instances, a tailored genetic algorithm (GA) is proposed. The main achievements of this research are as follows. First, the proposed model provides an integrated framework that simultaneously considers multi-vaccine characteristics and storage requirements within a three-tier supply chain. Second, computational experiments demonstrate that the GA achieves high-quality solutions with very small optimality gaps compared to exact solutions obtained by GAMS for small and medium-sized problems. Third, the results show that while exact methods become computationally inefficient or infeasible for large-scale instances, the GA remains robust and capable of producing near-optimal solutions within reasonable computational time. Finally, sensitivity analysis confirms the consistency and validity of the model, showing that total cost increases logically with demand and cost parameters. These findings highlight the effectiveness and scalability of the proposed approach and demonstrate its applicability as a decision-support tool for policymakers and healthcare planners in managing complex vaccine distribution systems, particularly during large-scale public health emergencies.
- 9 July 2026
- Published by Public Library of Science (PLoS) in PLOS ONE
- Vol. 21  (7) , e0352121
Open AccessA multi-product, multi-period vaccine supply chain network planning with injection centers and storage conditions
This study develops a mixed-integer linear programming model for a multi-product, multi-period vaccine supply chain network that incorporates injection centers and heterogeneous storage conditions, including cold and ultra-cold refrigeration. The model captures key operational decisions such as distribution center location, vaccine allocation, and storage configuration under capacity and demand constraints, while ensuring no shortage at injection centers. To efficiently solve large-scale instances, a tailored genetic algorithm (GA) is proposed. The main achievements of this research are as follows. First, the proposed model provides an integrated framework that simultaneously considers multi-vaccine characteristics and storage requirements within a three-tier supply chain. Second, computational experiments demonstrate that the GA achieves high-quality solutions with very small optimality gaps compared to exact solutions obtained by GAMS for small and medium-sized problems. Third, the results show that while exact methods become computationally inefficient or infeasible for large-scale instances, the GA remains robust and capable of producing near-optimal solutions within reasonable computational time. Finally, sensitivity analysis confirms the consistency and validity of the model, showing that total cost increases logically with demand and cost parameters. These findings highlight the effectiveness and scalability of the proposed approach and demonstrate its applicability as a decision-support tool for policymakers and healthcare planners in managing complex vaccine distribution systems, particularly during large-scale public health emergencies.
- Open Access
- 15 June 2026
- Published by Elsevier in Sustainable Futures
- Vol. 12
A Sustainable Agri-Food Supply Chain for a Multi-Layer, Multi-Period, Multi-Product Chain Restaurants Planning Problem
- 15 June 2026
- Published by Elsevier in Sustainable Futures
- Vol. 12
Open AccessA Sustainable Agri-Food Supply Chain for a Multi-Layer, Multi-Period, Multi-Product Chain Restaurants Planning Problem
- Open Access
- 26 May 2026
- Published by Elsevier in Results in Engineering
- Vol. 31
Integrated control chart and maintenance strategy under multiple dependent assignable causes and delayed monitoring
- 26 May 2026
- Published by Elsevier in Results in Engineering
- Vol. 31
Open AccessIntegrated control chart and maintenance strategy under multiple dependent assignable causes and delayed monitoring
- 16 March 2026
- Published by Springer Nature in Operational Research
- Vol. 26  (2)
Optimizing water sustainability: integrating blockchain technology in the water and wastewater supply chain management
- 16 March 2026
- Published by Springer Nature in Operational Research
- Vol. 26  (2)
Optimizing water sustainability: integrating blockchain technology in the water and wastewater supply chain management
- Open Access
- 6 February 2026
- Published by Elsevier in Sustainable Futures
- Vol. 11
Sustainable pharmaceutical supply chain for humanitarian relief logistics
- 6 February 2026
- Published by Elsevier in Sustainable Futures
- Vol. 11
Open AccessSustainable pharmaceutical supply chain for humanitarian relief logistics
- Open Access
- 14 October 2025
- Published by Springer Nature in Scientific Reports
- Vol. 15  (1) , 1-29
A mathematical modelling for integrated construction and production supply chain network design
Nowadays, the construction industry has become one of the most important and crucial sectors of an economy. With the introduction of the concept of the supply chain and the successful use of supply chain management in many production-based industries, it has also entered the construction industry in recent years. In a classical production-based supply chain, the flow of materials and outputs at the end of the chain consists of manufactured products. However, in the construction supply chain, the final output is a building or structure. In this paper, we propose integrating the construction supply chain with a production supply chain planning problem. The facility location decisions (opening and launching facilities), which are very traditional decisions in production supply chain problems, require significant construction activities. However, the construction supply chain concept is not considered in literature for such an important part of a production-based supply chain. When designing the topology of a production supply chain (numbers, capacities, geographic positions of plants and warehouses), a series of construction activities and projects begin to create the strategic structure for the supply chain. Subsequently, once operational, the production supply chain can start producing products to sell to customers. In this article, we will formulate such an integrated problem using a comprehensive mixed integer linear programming optimization model. The aim is designing an optimal structure for the supply chain with minimal construction and production costs by determining optimal amounts of building materials, raw materials, workers, equipment and machinery, transportation methods, and designs based on required construction size. A wide range of examples and test problems are presented, discussed, and compared in detail to investigate and illustrate the performance of proposed mathematical model.
- 14 October 2025
- Published by Springer Nature in Scientific Reports
- Vol. 15  (1) , 1-29
Open AccessA mathematical modelling for integrated construction and production supply chain network design
Nowadays, the construction industry has become one of the most important and crucial sectors of an economy. With the introduction of the concept of the supply chain and the successful use of supply chain management in many production-based industries, it has also entered the construction industry in recent years. In a classical production-based supply chain, the flow of materials and outputs at the end of the chain consists of manufactured products. However, in the construction supply chain, the final output is a building or structure. In this paper, we propose integrating the construction supply chain with a production supply chain planning problem. The facility location decisions (opening and launching facilities), which are very traditional decisions in production supply chain problems, require significant construction activities. However, the construction supply chain concept is not considered in literature for such an important part of a production-based supply chain. When designing the topology of a production supply chain (numbers, capacities, geographic positions of plants and warehouses), a series of construction activities and projects begin to create the strategic structure for the supply chain. Subsequently, once operational, the production supply chain can start producing products to sell to customers. In this article, we will formulate such an integrated problem using a comprehensive mixed integer linear programming optimization model. The aim is designing an optimal structure for the supply chain with minimal construction and production costs by determining optimal amounts of building materials, raw materials, workers, equipment and machinery, transportation methods, and designs based on required construction size. A wide range of examples and test problems are presented, discussed, and compared in detail to investigate and illustrate the performance of proposed mathematical model.
- 2 September 2025
- Published by Elsevier in Transportation Research Part E: Logistics and Transportation Review
- Vol. 204
A supply chain redesign problem considering facility functionality transformation
- 2 September 2025
- Published by Elsevier in Transportation Research Part E: Logistics and Transportation Review
- Vol. 204
A supply chain redesign problem considering facility functionality transformation