Claudio Benghi
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Claudio Benghi has a total of 39 co-authors. Here are the top co-authors by number of shared publications:
Gloria Ronchi
Aether & Hemera
4 shared publicationsAisen C. Chacin
University of Tsukuba
1 shared publicationAnke Brock
IRIT -- CNRS & Université Toulouse
1 shared publicationBen Bengler
Queen Mary University of London
1 shared publicationBernard Oriola
IRIT -- CNRS & Université Toulouse
1 shared publicationChristophe Jouffrais
IRIT -- CNRS & Université Toulouse
1 shared publication
Latest Publications
- 1 January 2018
- Published by IGI Global Scientific Publishing
- p. 27-51
Constraints in Authoring BIM Components
The authors investigated issues of geometric interoperability for reusable BIM components across multiple platforms using industry foundation classes (IFCs) which many proprietary BIM software platforms claim to fully support. These assertions were tested, first in 2012 and then in 2017 to assess the state and evolution of interoperability in the industry. A simple test model was created representing significant types of geometry encountered in component libraries, which were then expressed in IFC files. In the 2012 study, 11 commonly used BIM tools showed a dramatic failure to process the geometries as intended, indicating that the authoring tools, whilst technically capable of supporting required component geometric representations, were constrained from doing so by their conversion interfaces with IFC geometries. In the 2017 tests, improvements were observed though there were still significant processing failures that could result in serious errors; particularly in the case of the BIM library components imported into project design models.
- 1 January 2018
- Published by IGI Global Scientific Publishing
- p. 27-51
Constraints in Authoring BIM Components
The authors investigated issues of geometric interoperability for reusable BIM components across multiple platforms using industry foundation classes (IFCs) which many proprietary BIM software platforms claim to fully support. These assertions were tested, first in 2012 and then in 2017 to assess the state and evolution of interoperability in the industry. A simple test model was created representing significant types of geometry encountered in component libraries, which were then expressed in IFC files. In the 2012 study, 11 commonly used BIM tools showed a dramatic failure to process the geometries as intended, indicating that the authoring tools, whilst technically capable of supporting required component geometric representations, were constrained from doing so by their conversion interfaces with IFC geometries. In the 2017 tests, improvements were observed though there were still significant processing failures that could result in serious errors; particularly in the case of the BIM library components imported into project design models.
- Open Access
- 7 December 2017
- Published by The Open Journal in Journal of Open Source Software
- Vol. 2 (20)
Xbim.Essentials: a library for interoperable building information applications
The Xbim.Essentials library offers data extraction, data transformation and data validation functions for Building Information Models (BIM); its robust and optimised implementation allows efficient operations on gigabyte-range files for researchers and practitioners interested in the built environment.
- 7 December 2017
- Published by The Open Journal in Journal of Open Source Software
- Vol. 2 (20)
Open AccessXbim.Essentials: a library for interoperable building information applications
The Xbim.Essentials library offers data extraction, data transformation and data validation functions for Building Information Models (BIM); its robust and optimised implementation allows efficient operations on gigabyte-range files for researchers and practitioners interested in the built environment.
- Open Access
- 23 August 2016
- Published by Association for Computing Machinery (ACM) in Interactions
- Vol. 23 (5) , 8-11
Demo hour
- 23 August 2016
- Published by Association for Computing Machinery (ACM) in Interactions
- Vol. 23 (5) , 8-11
Open AccessDemo hour
- Open Access
- 1 March 2014
- Published by Association for Computing Machinery (ACM) in Interactions
- Vol. 21 (2) , 10-13
Demo hour
Demo Hour highlights new prototypes and projects that exemplify innovation and novel forms of interaction. Audrey Desjardins, Editor
- 1 March 2014
- Published by Association for Computing Machinery (ACM) in Interactions
- Vol. 21 (2) , 10-13
Open AccessDemo hour
Demo Hour highlights new prototypes and projects that exemplify innovation and novel forms of interaction. Audrey Desjardins, Editor
- 1 January 2014
- Published by Inderscience Publishers in International Journal of Arts and Technology
- Vol. 7 (4) , 377
Interactive light and sound installation using artificial intelligence
This work aims at investigating the relationship between creation and fruition of art in interactive installations that exhibit intelligent responsiveness to participant input. A practice-based research led to the development of an interactive environment, in which the audience members are partners in constructing meanings and producing contents. The presented piece Which is your brass voice? employs artificial intelligence techniques to create unique multi-sensory experience for the audience. The artificial intelligence behind the artwork analyses the individual nuances of people's voices and creates a new music composition in real time on the base of its vast musical knowledge. User input is transformed into sound and coloured lights for further exploration of computer mediated aesthetic experiences. A brief description of the technical system is also included.
- 1 January 2014
- Published by Inderscience Publishers in International Journal of Arts and Technology
- Vol. 7 (4) , 377
Interactive light and sound installation using artificial intelligence
This work aims at investigating the relationship between creation and fruition of art in interactive installations that exhibit intelligent responsiveness to participant input. A practice-based research led to the development of an interactive environment, in which the audience members are partners in constructing meanings and producing contents. The presented piece Which is your brass voice? employs artificial intelligence techniques to create unique multi-sensory experience for the audience. The artificial intelligence behind the artwork analyses the individual nuances of people's voices and creates a new music composition in real time on the base of its vast musical knowledge. User input is transformed into sound and coloured lights for further exploration of computer mediated aesthetic experiences. A brief description of the technical system is also included.
- 1 January 2013
- Published by IGI Global Scientific Publishing in International Journal of 3-D Information Modeling
- Vol. 2 (1) , 29-44
Constraints in Authoring BIM Components for Optimal Data Reuse and Interoperability
Constraints in Authoring BIM Components for Optimal Data Reuse and Interoperability: Results of Some Initial Tests: 10.4018/ij3dim.2013010104: This research investigates the issues of authoring reusable BIM components that can be delivered across multiple platforms. A key constraint in the uptake of
- 1 January 2013
- Published by IGI Global Scientific Publishing in International Journal of 3-D Information Modeling
- Vol. 2 (1) , 29-44
Constraints in Authoring BIM Components for Optimal Data Reuse and Interoperability
Constraints in Authoring BIM Components for Optimal Data Reuse and Interoperability: Results of Some Initial Tests: 10.4018/ij3dim.2013010104: This research investigates the issues of authoring reusable BIM components that can be delivered across multiple platforms. A key constraint in the uptake of
- Open Access
- 1 January 2013
- Published by Association for Computing Machinery (ACM) in Interactions
- Vol. 20 (1) , 10-11
Demo hour
Demo Hour highlights new prototypes and projects that exemplify innovation and novel forms of interaction. Leah Maestri, Editor
- 1 January 2013
- Published by Association for Computing Machinery (ACM) in Interactions
- Vol. 20 (1) , 10-11
Open AccessDemo hour
Demo Hour highlights new prototypes and projects that exemplify innovation and novel forms of interaction. Leah Maestri, Editor
- Open Access
- 1 January 2010
- Published by International Association for Bridge and Structural Engineering (IABSE)
Developing 5D System Connecting Cost, Schedule and 3D Model
A recent topic, BIM could be considered as an effort to integrate all the information. So far, the integration of cost and schedule data has been done successfully as there is a good case of EVMS in order to synthesize those data. There have been many efforts to develop a 5D system that integrates cost, schedule data and a 3D model, but its technology is so difficult that few have succeeded. The 5D system will have many advantages once it is made: The visualization of schedule data and verification of cost in real time are possible and the future cost and schedule can be expected accurately. Especially, in case of an atypical structure the clash of members and errors of drawings which are hard to find in 2D drawings can be detected and corrected in a 3D model. This paper presents the methodology and results to develop a 5D system with the integrated cost and schedule data from EVMS, and a 3D model of the 2nd Geumgang Bridge within nD-CCIR, a 5D system developed in the UK.
- 1 January 2010
- Published by International Association for Bridge and Structural Engineering (IABSE)
Open AccessDeveloping 5D System Connecting Cost, Schedule and 3D Model
A recent topic, BIM could be considered as an effort to integrate all the information. So far, the integration of cost and schedule data has been done successfully as there is a good case of EVMS in order to synthesize those data. There have been many efforts to develop a 5D system that integrates cost, schedule data and a 3D model, but its technology is so difficult that few have succeeded. The 5D system will have many advantages once it is made: The visualization of schedule data and verification of cost in real time are possible and the future cost and schedule can be expected accurately. Especially, in case of an atypical structure the clash of members and errors of drawings which are hard to find in 2D drawings can be detected and corrected in a 3D model. This paper presents the methodology and results to develop a 5D system with the integrated cost and schedule data from EVMS, and a 3D model of the 2nd Geumgang Bridge within nD-CCIR, a 5D system developed in the UK.