Joaquin Molla
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Research Interests
Joaquin Molla has a total of 328 co-authors. Here are the top co-authors by number of shared publications:
- Angel Ibarra
IFMIF-DONES España, Granada, Spain
35 shared publications - Fernando Mota
CIEMAT, Avenida Complutense 40, Madrid 28040, Spain
15 shared publications - Rafael Vila
CIEMAT, Avda. Complutense 22, 28040 Madrid, Spain
14 shared publications R. Heidinger
F4E, Garching, Germany
9 shared publicationsAngel Ibarra
Laboratorio Nacional de Fusión, CIEMAT, Madrid, Spain
6 shared publications- Angela Garcia
CIEMAT, Madrid, Spain
6 shared publications
Latest Publications
- Open Access
- 26 June 2026
- Published by Elsevier in Fusion Engineering and Design
- Vol. 230
Feasibility of recycling yttrium-based hydrogen traps for the IFMIF-DONES lithium loop: a numerical study and experimental design
- 26 June 2026
- Published by Elsevier in Fusion Engineering and Design
- Vol. 230
Open AccessFeasibility of recycling yttrium-based hydrogen traps for the IFMIF-DONES lithium loop: a numerical study and experimental design
- Open Access
- 10 March 2023
- Published by IOP Publishing in Nuclear Fusion
- Vol. 63 (5) , 056012
Impact of yttrium hydride formation on multi-isotopic hydrogen retention by a getter trap for the DONES lithium loop
Compliance with imposed hydrogen concentration limits in the lithium loop of the DEMO-Oriented Neutron Source (DONES) requires the installation of an yttrium-based hydrogen trap. To determine an appropriate H-trap design, it is essential to have access to a numerical tool capable of simulating hydrogen transport in the DONES lithium loop connected to an yttrium pebble-bed. In the past, a simplified model was created that allows such calculations when hydrogen concentrations in the lithium are low. However, in certain DONES operating phases, the concentration in the lithium is high and in a range where yttrium dihydride (YH2) formation is likely. Due to the anticipated great impact of YH2 formation on the H-trap performance a new model is developed that includes the mechanism of hydride formation. It is based on a mathematical reproduction of complete pressure-composition isotherms of the Li–H and Y–H systems. Thus, the conditions that trigger YH2 formation are determined and the variation of hydrogen solubility in different yttrium hydride phases is deduced. An approximate concentration-dependent relationship of hydrogen diffusivity in yttrium is derived and incorporated into the model. Simulations are performed to analyze the dynamics of the concentration decrease during purification of the lithium circuit prior to the experimental DONES phase by varying design parameters of the trap. It is found that hydride formation greatly increases the hydrogen gettering capacity of the H-trap and limits the maximum concentration in the lithium. Indeed, YH2 formation may be purposefully triggered to exploit its beneficial properties for DONES. Simulations of the hydrogen purification process during the experimental phase of DONES show that the H-trap must be replaced at least every 28 days to meet tritium limits. This work sets the conditions for the required pebble-bed mass of the H-trap at a given temperature to comply with the DONES safety requirements. Finally, the model is validated by numerical reproduction of experimental results.
- 10 March 2023
- Published by IOP Publishing in Nuclear Fusion
- Vol. 63 (5) , 056012
Open AccessImpact of yttrium hydride formation on multi-isotopic hydrogen retention by a getter trap for the DONES lithium loop
Compliance with imposed hydrogen concentration limits in the lithium loop of the DEMO-Oriented Neutron Source (DONES) requires the installation of an yttrium-based hydrogen trap. To determine an appropriate H-trap design, it is essential to have access to a numerical tool capable of simulating hydrogen transport in the DONES lithium loop connected to an yttrium pebble-bed. In the past, a simplified model was created that allows such calculations when hydrogen concentrations in the lithium are low. However, in certain DONES operating phases, the concentration in the lithium is high and in a range where yttrium dihydride (YH2) formation is likely. Due to the anticipated great impact of YH2 formation on the H-trap performance a new model is developed that includes the mechanism of hydride formation. It is based on a mathematical reproduction of complete pressure-composition isotherms of the Li–H and Y–H systems. Thus, the conditions that trigger YH2 formation are determined and the variation of hydrogen solubility in different yttrium hydride phases is deduced. An approximate concentration-dependent relationship of hydrogen diffusivity in yttrium is derived and incorporated into the model. Simulations are performed to analyze the dynamics of the concentration decrease during purification of the lithium circuit prior to the experimental DONES phase by varying design parameters of the trap. It is found that hydride formation greatly increases the hydrogen gettering capacity of the H-trap and limits the maximum concentration in the lithium. Indeed, YH2 formation may be purposefully triggered to exploit its beneficial properties for DONES. Simulations of the hydrogen purification process during the experimental phase of DONES show that the H-trap must be replaced at least every 28 days to meet tritium limits. This work sets the conditions for the required pebble-bed mass of the H-trap at a given temperature to comply with the DONES safety requirements. Finally, the model is validated by numerical reproduction of experimental results.
- Open Access
- 29 March 2022
- Published by Elsevier in Nuclear Materials and Energy
- Vol. 31
CIEMAT experimental proposal on lithium ignition in support of DONES licensing (LiFIRE facility)
- 29 March 2022
- Published by Elsevier in Nuclear Materials and Energy
- Vol. 31
Open AccessCIEMAT experimental proposal on lithium ignition in support of DONES licensing (LiFIRE facility)
- 17 August 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Plasma Science
- Vol. 49 (9) , 2987-2996
Functional Overview of the RF Power System for the LIPAc RFQ
Design, development, manufacturing, and test activities of the RF power system (RFPS) for Linear IFMIF Prototype Accelerator (LIPAc) were completed in Europe. Installation and commissioning activities were carried out at the International Fusion Materials Irradiation Facility-Engineering Validation and Engineering Design Activities (IFMIF/EVEDA) site in Rokkasho, Japan. Challenging IFMIF requirements led to a number of innovations during design and development. Commissioning required a major effort on calibration and fine setting and led to development of new functionalities. The RFPS was validated under full power and 125-mA deuteron beam loading conditions, in the radio frequency quadrupole (RFQ), demonstrating good performance. This article is an overview about how technical challenges impacted the prototype RFPS design and its functional evolution during commissioning, cavity conditioning, and beam operation of the RFQ.
- 17 August 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Plasma Science
- Vol. 49 (9) , 2987-2996
Functional Overview of the RF Power System for the LIPAc RFQ
Design, development, manufacturing, and test activities of the RF power system (RFPS) for Linear IFMIF Prototype Accelerator (LIPAc) were completed in Europe. Installation and commissioning activities were carried out at the International Fusion Materials Irradiation Facility-Engineering Validation and Engineering Design Activities (IFMIF/EVEDA) site in Rokkasho, Japan. Challenging IFMIF requirements led to a number of innovations during design and development. Commissioning required a major effort on calibration and fine setting and led to development of new functionalities. The RFPS was validated under full power and 125-mA deuteron beam loading conditions, in the radio frequency quadrupole (RFQ), demonstrating good performance. This article is an overview about how technical challenges impacted the prototype RFPS design and its functional evolution during commissioning, cavity conditioning, and beam operation of the RFQ.
- 1 July 2021
- Published by Elsevier in Fusion Engineering and Design
- Vol. 168
Status and future developments of the Linear IFMIF Prototype Accelerator (LIPAc)
- 1 July 2021
- Published by Elsevier in Fusion Engineering and Design
- Vol. 168
Status and future developments of the Linear IFMIF Prototype Accelerator (LIPAc)
- 1 July 2021
- Published by Elsevier in Fusion Engineering and Design
- Vol. 168
First validation experiments of the prototype solid state RF system for IFMIF-DONES
- 1 July 2021
- Published by Elsevier in Fusion Engineering and Design
- Vol. 168
First validation experiments of the prototype solid state RF system for IFMIF-DONES
- 1 April 2021
- Published by Elsevier in Fusion Engineering and Design
- Vol. 165
LIPAc RF power system: design and main practical implementation issues
- 1 April 2021
- Published by Elsevier in Fusion Engineering and Design
- Vol. 165
LIPAc RF power system: design and main practical implementation issues
- 9 February 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 31 (5) , 1-5
Status of the Series Fabrication of the Superconducting Magnet Packages for LIPAc Cryomodule
The last acceleration stage of the deuteron beam of the LIPAc linear accelerator is provided by eight superconducting cavities in a cryomodule (SRF Linac). Each cavity needs a magnet package, which consists of a solenoid for beam focusing and two vertical and horizontal dipole correctors for beam steering. The superconducting coils are fed by vapour cooled current leads. The beam position monitor is part of the magnet helium vessel. The series fabrication of eight sets of magnets and current leads has been performed by Elytt Energy, under CIEMAT follow-up. This paper describes the final design used for production, the main challenges addressed during fabrication, together with the quality control procedure, acceptance tests and qualification criteria to validate both the magnets and current leads. Currently some activities are being performed in the magnet helium vessels for improvement of surfaces for handling inside the clean room and reducing the risk of presence of particulate contaminations in the beam tube.
- 9 February 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 31 (5) , 1-5
Status of the Series Fabrication of the Superconducting Magnet Packages for LIPAc Cryomodule
The last acceleration stage of the deuteron beam of the LIPAc linear accelerator is provided by eight superconducting cavities in a cryomodule (SRF Linac). Each cavity needs a magnet package, which consists of a solenoid for beam focusing and two vertical and horizontal dipole correctors for beam steering. The superconducting coils are fed by vapour cooled current leads. The beam position monitor is part of the magnet helium vessel. The series fabrication of eight sets of magnets and current leads has been performed by Elytt Energy, under CIEMAT follow-up. This paper describes the final design used for production, the main challenges addressed during fabrication, together with the quality control procedure, acceptance tests and qualification criteria to validate both the magnets and current leads. Currently some activities are being performed in the magnet helium vessels for improvement of surfaces for handling inside the clean room and reducing the risk of presence of particulate contaminations in the beam tube.
- 24 November 2020
- Published by IOP Publishing in Nuclear Fusion
- Vol. 61 (1) , 015001
Design, manufacturing and tests of the LIPAc high energy beam transport line
The International Fusion Materials Irradiation Facility (IFMIF) is a projected accelerator-based, D-Li neutron source for fusion reactor materials qualification. LIPAc (Linear IFMIF Prototype Accelerator) is an accelerator aiming to generate a 125 mA, 9 MeV continuous wave deuteron beam, which is currently being commissioned in Rokkasho (Japan) with the objective of validating the IFMIF accelerator design. In LIPAc, a 10 m long High Energy Beam Transport line (HEBT) will connect the exit of the superconducting linac to the beam dump (BD). The HEBT line must accommodate the diagnostics for beam characterization and open the beam at the end to allow its stopping at the BD. The line contains several magnets to control the beam shape and its trajectory, maintaining beam losses below 1 W m−1 along the beamline to limit activation of surrounding elements and allow hands-on maintenance. In this work, the LIPAc HEBT line project is described since its origins. A summary of the beam dynamics calculations and other studies (vacuum, radioprotection, assembly, alignment) that led to the conceptual design of the line is done. After that, the detailed design of the line is presented, justifying the main design decisions taken and finally, the manufacturing and procurement process and the acceptance tests performed are summarized.
- 24 November 2020
- Published by IOP Publishing in Nuclear Fusion
- Vol. 61 (1) , 015001
Design, manufacturing and tests of the LIPAc high energy beam transport line
The International Fusion Materials Irradiation Facility (IFMIF) is a projected accelerator-based, D-Li neutron source for fusion reactor materials qualification. LIPAc (Linear IFMIF Prototype Accelerator) is an accelerator aiming to generate a 125 mA, 9 MeV continuous wave deuteron beam, which is currently being commissioned in Rokkasho (Japan) with the objective of validating the IFMIF accelerator design. In LIPAc, a 10 m long High Energy Beam Transport line (HEBT) will connect the exit of the superconducting linac to the beam dump (BD). The HEBT line must accommodate the diagnostics for beam characterization and open the beam at the end to allow its stopping at the BD. The line contains several magnets to control the beam shape and its trajectory, maintaining beam losses below 1 W m−1 along the beamline to limit activation of surrounding elements and allow hands-on maintenance. In this work, the LIPAc HEBT line project is described since its origins. A summary of the beam dynamics calculations and other studies (vacuum, radioprotection, assembly, alignment) that led to the conceptual design of the line is done. After that, the detailed design of the line is presented, justifying the main design decisions taken and finally, the manufacturing and procurement process and the acceptance tests performed are summarized.