Thomas J. Dionise
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Thomas J. Dionise has a total of 11 co-authors. Here are the top co-authors by number of shared publications:
Sam Morello
Ann Enertech Associates, Johnstown, PA USA
2 shared publications- Aaron H. VanderMeulen
Portland, Oregon United States
1 shared publication - Daleep Mohla
DCM Electrical Consulting Services Inc., Missouri City, TX, USA
1 shared publication - David B. Durocher
Eaton, West Linn, Oregon, USA
1 shared publication - Gianni Paradiso
Portsmouth, New Hampshire United States
1 shared publication John Gnesda
Ann Enertech Associates, Johnstown, PA USA
1 shared publication
Latest Publications
- 18 December 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Industry Applications Magazine
- Vol. 32 (1) , 24-34
The Journey to Develop a New IEEE Standard in the Metals Industry: A Guide to Specifying an AC Electric arc Furnace Transformer
One of the activities by volunteer members of various technical committees across the 39 individual Societies of the IEEE is developing new IEEE Standards. The paper focuses on the efforts of the IEEE Industry Applications Society (IAS) Metal Industry Committee (MetIC), and their member’s efforts to develop a new IEEE Standard focused on Electric Arc Furnace (EAF) Transformers applied in the steel making industry. This specific industry application was selected as a good candidate for the new Standard by the MetIC due to the unique and demanding transformer design requirements that are specific to supply of safe and reliable power to an electric arc furnace. This paper will explain the application, discuss best practices in formation of a standards development working group, engagement and supporting standards development tools from the IEEE Standards Association and lessons learned in working through the standards development process. An open invitation of any new members to join the working group can be found in the section titled Conclusion.
- 18 December 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Industry Applications Magazine
- Vol. 32 (1) , 24-34
The Journey to Develop a New IEEE Standard in the Metals Industry: A Guide to Specifying an AC Electric arc Furnace Transformer
One of the activities by volunteer members of various technical committees across the 39 individual Societies of the IEEE is developing new IEEE Standards. The paper focuses on the efforts of the IEEE Industry Applications Society (IAS) Metal Industry Committee (MetIC), and their member’s efforts to develop a new IEEE Standard focused on Electric Arc Furnace (EAF) Transformers applied in the steel making industry. This specific industry application was selected as a good candidate for the new Standard by the MetIC due to the unique and demanding transformer design requirements that are specific to supply of safe and reliable power to an electric arc furnace. This paper will explain the application, discuss best practices in formation of a standards development working group, engagement and supporting standards development tools from the IEEE Standards Association and lessons learned in working through the standards development process. An open invitation of any new members to join the working group can be found in the section titled Conclusion.
- 1 September 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Industry Applications Magazine
- Vol. 25 (5) , 95-103
Arc Furnace Performance Validation: Using Modeling, Monitoring, and Statistical Analysis
- 1 September 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Industry Applications Magazine
- Vol. 25 (5) , 95-103
Arc Furnace Performance Validation: Using Modeling, Monitoring, and Statistical Analysis
- 12 June 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Industry Applications
- Vol. 55 (5) , 4474-4482
Exploring New and Conventional Starting Methods of Large Medium-Voltage Induction Motors on Limited kVA Sources
Liquefied Natural Gas peak shaving facilities utilize large horsepower motors to drive refrigeration compressors needed for the liquefaction process. Utilities impose strict voltage flicker requirements making evaluation of various motor starting methods imperative. The large motor starting studies must be evaluated while also factoring in equipment and controls complexity and overall project capital costs. This case study will evaluate several motor starting methods, comparing technical performance and cost considerations, identifying the best method for the project requirements and reviewing the field measurements during operation confirming acceptable performance of the installed method.
- 12 June 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Industry Applications
- Vol. 55 (5) , 4474-4482
Exploring New and Conventional Starting Methods of Large Medium-Voltage Induction Motors on Limited kVA Sources
Liquefied Natural Gas peak shaving facilities utilize large horsepower motors to drive refrigeration compressors needed for the liquefaction process. Utilities impose strict voltage flicker requirements making evaluation of various motor starting methods imperative. The large motor starting studies must be evaluated while also factoring in equipment and controls complexity and overall project capital costs. This case study will evaluate several motor starting methods, comparing technical performance and cost considerations, identifying the best method for the project requirements and reviewing the field measurements during operation confirming acceptable performance of the installed method.
- 6 September 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Industry Applications Magazine
- Vol. 24 (1) , 98-109
A Case Study of Voltage Transformer Failures: Solution Implementation in a Modern Data Center
While preparing a modern data center for startup, the commissioning process involved primary circuit switching that resulted in two voltage transformer (VT) failures. As a result, we conducted a comprehensive investigation of the VT failures. As the investigation proceeded, VT ferroresonance on circuit opening and high-frequency switching transients on closing emerged as possible root causes of the failures. After incorporating extensive transient simulations and three rounds of field transient measurements, we designed and implemented a complete solution that included the sizing of snubbers to overcome excessive switching transients and the development of a saturable reactor to protect VTs against the effects of ferroresonance. This article describes the root causes, simulations, field measurements, recommended solutions, and solution implementation for this event. The correlation between field measurements and simulation results shows the effectiveness of modeling the implemented solutions.
- 6 September 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Industry Applications Magazine
- Vol. 24 (1) , 98-109
A Case Study of Voltage Transformer Failures: Solution Implementation in a Modern Data Center
While preparing a modern data center for startup, the commissioning process involved primary circuit switching that resulted in two voltage transformer (VT) failures. As a result, we conducted a comprehensive investigation of the VT failures. As the investigation proceeded, VT ferroresonance on circuit opening and high-frequency switching transients on closing emerged as possible root causes of the failures. After incorporating extensive transient simulations and three rounds of field transient measurements, we designed and implemented a complete solution that included the sizing of snubbers to overcome excessive switching transients and the development of a saturable reactor to protect VTs against the effects of ferroresonance. This article describes the root causes, simulations, field measurements, recommended solutions, and solution implementation for this event. The correlation between field measurements and simulation results shows the effectiveness of modeling the implemented solutions.
- 26 July 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Industry Applications
- Vol. 53 (6) , 6024-6032
Installation, Startup, and Performance of a Static VAR Compensator for an Electric Arc Furnace Upgrade
This steel maker upgraded the electric arc furnace (EAF) melt shop to increase production and improve the metallurgical quality of their product. The increased electrical load and harmonic generation for the new 50 MVA furnace operation necessitated the installation of an 80 MVAR static VAR compensator (SVC) to meet utility interconnect requirements. This paper is a follow-up and companion to the author's previous paper that documented comprehensive analysis to specify the SVC. This paper describes the sequence of events during the installation, commissioning, and operation of the SVC. It will assess the performance of the SVC compared with the electrical requirements of the utility for voltage regulation, flicker, harmonics, and power factor. Power quality measurements during EAF operation without the SVC established a baseline to compare improvements provided by the SVC as well as compliance with the utility limits. Additionally, events encountered during the commissioning are shared as lessons learned.
- 26 July 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Industry Applications
- Vol. 53 (6) , 6024-6032
Installation, Startup, and Performance of a Static VAR Compensator for an Electric Arc Furnace Upgrade
This steel maker upgraded the electric arc furnace (EAF) melt shop to increase production and improve the metallurgical quality of their product. The increased electrical load and harmonic generation for the new 50 MVA furnace operation necessitated the installation of an 80 MVAR static VAR compensator (SVC) to meet utility interconnect requirements. This paper is a follow-up and companion to the author's previous paper that documented comprehensive analysis to specify the SVC. This paper describes the sequence of events during the installation, commissioning, and operation of the SVC. It will assess the performance of the SVC compared with the electrical requirements of the utility for voltage regulation, flicker, harmonics, and power factor. Power quality measurements during EAF operation without the SVC established a baseline to compare improvements provided by the SVC as well as compliance with the utility limits. Additionally, events encountered during the commissioning are shared as lessons learned.