Jati Utomo Dwi Hatmoko
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Jati Utomo Dwi Hatmoko has a total of 64 co-authors. Here are the top co-authors by number of shared publications:
- Mochamad Agung Wibowo
Department of Civil Engineering, Faculty of Engineering, Diponegoro University, Semarang 50275, Indonesia
7 shared publications Mochamad Agung Wibowo
Department of Civil Engineering, Diponegoro University, Jl. Prof Soedharto, SH, Semarang, 50275, Indonesia
5 shared publicationsArif Hidayat
Diponegoro University
4 shared publicationsApsari Setiawati
Civil Engineering Department Diponegoro University Semarang - Indonesia
3 shared publications- Lendra Lendra
Universitas Palangka Raya
3 shared publications Stefanus Catur Adi Prasetyo
Civil Engineering Department, Diponegoro University, Semarang - Indonesia
3 shared publications
Latest Publications
- 11 April 2026
- Published by Springer Nature in Archives of Computational Methods in Engineering
- Vol. 33 (6) , 1-25
A Decade of Artificial Intelligence in the Construction Industry: Trends, Applications, and Future Directions
- 11 April 2026
- Published by Springer Nature in Archives of Computational Methods in Engineering
- Vol. 33 (6) , 1-25
A Decade of Artificial Intelligence in the Construction Industry: Trends, Applications, and Future Directions
- Open Access
- 27 March 2026
- Published by BON VIEW PUBLISHING PTE in Artificial Intelligence and Applications
A Comprehensive Literature Review and Bibliometric Analysis of the Development and Difficulties of Artificial Intelligence Methods for International Roughness Index Prediction
The International Roughness Index (IRI) is a key indicator for pavement condition assessment and maintenance prioritization. In recent years, artificial intelligence (AI) techniques have been increasingly applied to improve IRI prediction accuracy; however, existing studies remain fragmented, limiting a comprehensive understanding of model performance, data sources, and practical implementation challenges. This study presents a systematic literature review and bibliometric analysis to synthesize recent developments in AI-based IRI prediction. Following the Preferred Reporting Items for Systematic Reviews and Meta-Analyses guidelines, 49 peer-reviewed articles published between 2008 and 2025 were analyzed using VOSviewer. The review addresses four main aspects: prediction model performance, data source effectiveness, implementation challenges, and research collaboration patterns. The results show that both machine learning methods (e.g., Random Forest, XGBoost, Gradient Boosting) and deep learning approaches (e.g., neural networks and Long Short-Term Memory) achieve high predictive accuracy, with R² values frequently exceeding 0.90. Machine learning models offer advantages in interpretability and computational efficiency, while deep learning models perform better with large and complex datasets. Bibliometric analysis identifies six major research clusters and a clear temporal evolution from early modeling studies to advanced AI applications. Despite technological progress, challenges remain, including data heterogeneity, limited interpretability, computational demands, and integration with pavement management systems. This study provides an evidence-based overview of current trends and identifies key research directions to support the practical and sustainable adoption of AI-driven IRI prediction in pavement construction and management. Received: 23 April 2025 | Revised: 15 December 2025 | Accepted: 3 March 2026 Conflicts of Interest The authors declare that they have no conflicts of interest to this work. Data Availability Statement Data sharing is not applicable to this article as no new data were created or analyzed in this study. Author Contribution Statement Lendra Lendra: Conceptualization, Methodology, Software, Formal analysis, Investigation, Resources, Data curation, Writing – original draft, Writing – review & editing, Visualization. Mochamad Agung Wibowo: Conceptualization, Validation, Formal analysis, Writing – review & editing, Supervision, Project administration, Funding acquisition. Jati Utomo Dwi Hatmoko: Validation, Writing – review & editing, Supervision. Rony Teguh: Validation, Writing – review & editing, Visualization.
- 27 March 2026
- Published by BON VIEW PUBLISHING PTE in Artificial Intelligence and Applications
Open AccessA Comprehensive Literature Review and Bibliometric Analysis of the Development and Difficulties of Artificial Intelligence Methods for International Roughness Index Prediction
The International Roughness Index (IRI) is a key indicator for pavement condition assessment and maintenance prioritization. In recent years, artificial intelligence (AI) techniques have been increasingly applied to improve IRI prediction accuracy; however, existing studies remain fragmented, limiting a comprehensive understanding of model performance, data sources, and practical implementation challenges. This study presents a systematic literature review and bibliometric analysis to synthesize recent developments in AI-based IRI prediction. Following the Preferred Reporting Items for Systematic Reviews and Meta-Analyses guidelines, 49 peer-reviewed articles published between 2008 and 2025 were analyzed using VOSviewer. The review addresses four main aspects: prediction model performance, data source effectiveness, implementation challenges, and research collaboration patterns. The results show that both machine learning methods (e.g., Random Forest, XGBoost, Gradient Boosting) and deep learning approaches (e.g., neural networks and Long Short-Term Memory) achieve high predictive accuracy, with R² values frequently exceeding 0.90. Machine learning models offer advantages in interpretability and computational efficiency, while deep learning models perform better with large and complex datasets. Bibliometric analysis identifies six major research clusters and a clear temporal evolution from early modeling studies to advanced AI applications. Despite technological progress, challenges remain, including data heterogeneity, limited interpretability, computational demands, and integration with pavement management systems. This study provides an evidence-based overview of current trends and identifies key research directions to support the practical and sustainable adoption of AI-driven IRI prediction in pavement construction and management. Received: 23 April 2025 | Revised: 15 December 2025 | Accepted: 3 March 2026 Conflicts of Interest The authors declare that they have no conflicts of interest to this work. Data Availability Statement Data sharing is not applicable to this article as no new data were created or analyzed in this study. Author Contribution Statement Lendra Lendra: Conceptualization, Methodology, Software, Formal analysis, Investigation, Resources, Data curation, Writing – original draft, Writing – review & editing, Visualization. Mochamad Agung Wibowo: Conceptualization, Validation, Formal analysis, Writing – review & editing, Supervision, Project administration, Funding acquisition. Jati Utomo Dwi Hatmoko: Validation, Writing – review & editing, Supervision. Rony Teguh: Validation, Writing – review & editing, Visualization.
- Open Access
- 23 January 2026
- Published by Acadlore Publishing Services Limited in International Journal of Transport Development and Integration
- Vol. 10 (1) , 45-63
Optimizing Artificial Neural Networks Modelling in Predicting International Roughness Index for Flexible Pavement
- 23 January 2026
- Published by Acadlore Publishing Services Limited in International Journal of Transport Development and Integration
- Vol. 10 (1) , 45-63
Open AccessOptimizing Artificial Neural Networks Modelling in Predicting International Roughness Index for Flexible Pavement
- 8 July 2025
- Published by Springer Nature
- p. 455-468
Investigating Responsibilities of Project Parties Based on Various Delay Analysis Techniques
- 8 July 2025
- Published by Springer Nature
- p. 455-468
Investigating Responsibilities of Project Parties Based on Various Delay Analysis Techniques
- Open Access
- 20 June 2025
- Published by Kaunas University of Technology (KTU) in Environmental Research, Engineering and Management
- Vol. 81 (2) , 92-111
Comparative Environmental Impact Assessment of Conventional Pavement Layers and Cement-Treated Recycled Base: Equipment Usage Analysis in Tropical Road Construction Projects
This study investigates the fuel consumption, energy consumption, and carbon dioxide emissions associated with different pavement foundation structures in road construction projects in Palangka Raya, Indonesia. Using field data gathered at two study locations, the study contrasts the environmental impact of Cement-Treated Recycled Base (CTRB) with that of conventional Sub-Base and Base layers. Palangka Raya’s tropical climate offers difficulties for construction equipment operations, given its proximity to the equator and constant high temperatures. The study used a quantitative method to gather primary data on heavy equipment fuel consumption and verify it against theoretical calculations using known formulas and emission factors. Results show that CTRB works exhibit significantly higher fuel consumption (12.23 L/m3), energy consumption (440.13 MJ/m3), and carbon emissions (32.65 kgCO2/m3) compared to conventional Sub-Base (1.47 L/m3, 52.73 MJ/m3, 3.91 kgCO2/m3) and Base layers (1.53 L/m3, 54.96 MJ/m3, 4.08 kgCO2/m3). With variations between field data and calculations ranging from−3.22% to 7.88%, the study revealed that Palangka Raya’s tropical climate equipment regularly consumed 0.48–0.49 L/h more fuel than model projections. This result emphasizes the trade-off between the long-term durability of CTRB and its higher environmental impact during construction, especially in hot tropical areas. Emphasizing the need for a thorough assessment of construction techniques, considering both immediate environmental effects and long-term sustainability elements, the study finds that choosing pavement foundation structures significantly affects energy efficiency and carbon emissions in road building. Particularly in tropical areas, the study offers insightful analysis of environmentally responsible building practices and promotes sustainable methods in civil engineering.
- 20 June 2025
- Published by Kaunas University of Technology (KTU) in Environmental Research, Engineering and Management
- Vol. 81 (2) , 92-111
Open AccessComparative Environmental Impact Assessment of Conventional Pavement Layers and Cement-Treated Recycled Base: Equipment Usage Analysis in Tropical Road Construction Projects
This study investigates the fuel consumption, energy consumption, and carbon dioxide emissions associated with different pavement foundation structures in road construction projects in Palangka Raya, Indonesia. Using field data gathered at two study locations, the study contrasts the environmental impact of Cement-Treated Recycled Base (CTRB) with that of conventional Sub-Base and Base layers. Palangka Raya’s tropical climate offers difficulties for construction equipment operations, given its proximity to the equator and constant high temperatures. The study used a quantitative method to gather primary data on heavy equipment fuel consumption and verify it against theoretical calculations using known formulas and emission factors. Results show that CTRB works exhibit significantly higher fuel consumption (12.23 L/m3), energy consumption (440.13 MJ/m3), and carbon emissions (32.65 kgCO2/m3) compared to conventional Sub-Base (1.47 L/m3, 52.73 MJ/m3, 3.91 kgCO2/m3) and Base layers (1.53 L/m3, 54.96 MJ/m3, 4.08 kgCO2/m3). With variations between field data and calculations ranging from−3.22% to 7.88%, the study revealed that Palangka Raya’s tropical climate equipment regularly consumed 0.48–0.49 L/h more fuel than model projections. This result emphasizes the trade-off between the long-term durability of CTRB and its higher environmental impact during construction, especially in hot tropical areas. Emphasizing the need for a thorough assessment of construction techniques, considering both immediate environmental effects and long-term sustainability elements, the study finds that choosing pavement foundation structures significantly affects energy efficiency and carbon emissions in road building. Particularly in tropical areas, the study offers insightful analysis of environmentally responsible building practices and promotes sustainable methods in civil engineering.
- Open Access
- 13 June 2025
- Published by Institute of Research and Community Services Diponegoro University (LPPM UNDIP) in Teknik
- Vol. 46 (3) , 317-325
Mapping the Relationship Between Enterprise Risk and Project Risks at Construction Company
The construction industry is described as a project-based industry that inherently carries a wide range of risks. These risks are not only limited to projects but also extend to organizational or enterprise-level risks involving the company's directors, departments, and divisions. This study aims to examine the relationship between construction project risks and enterprise risks within construction companies. Specifically, it investigates how risks originating at the project level may influence or correlate with broader organizational risks, and vice versa. The research method involves analyzing secondary data, including project risk management reports and enterprise risk management documentation from construction firms. Through qualitative analysis, this study found a significant reciprocal relationship between project-level risks and company-level risks, which include the financial nature of the project risks, strategic risks, operational risks, and public & legal risks. These findings suggest that effective integration of project risk management (PRM) and enterprise risk management (ERM) is essential for enhancing overall risk resilience and organizational performance in the construction sector.
- 13 June 2025
- Published by Institute of Research and Community Services Diponegoro University (LPPM UNDIP) in Teknik
- Vol. 46 (3) , 317-325
Open AccessMapping the Relationship Between Enterprise Risk and Project Risks at Construction Company
The construction industry is described as a project-based industry that inherently carries a wide range of risks. These risks are not only limited to projects but also extend to organizational or enterprise-level risks involving the company's directors, departments, and divisions. This study aims to examine the relationship between construction project risks and enterprise risks within construction companies. Specifically, it investigates how risks originating at the project level may influence or correlate with broader organizational risks, and vice versa. The research method involves analyzing secondary data, including project risk management reports and enterprise risk management documentation from construction firms. Through qualitative analysis, this study found a significant reciprocal relationship between project-level risks and company-level risks, which include the financial nature of the project risks, strategic risks, operational risks, and public & legal risks. These findings suggest that effective integration of project risk management (PRM) and enterprise risk management (ERM) is essential for enhancing overall risk resilience and organizational performance in the construction sector.
- Open Access
- 17 November 2023
- Published by EDP Sciences in E3S Web of Conferences
- Vol. 448, 03040
Carbon Emissions Analysis of Modular House Construction
Amidst the pressing issue of the climate crisis, the concern of housing backlog requires sustained and intensive growth in housing construction. To address this challenge while also considering environmental impacts, the Indonesian Government has prepared various strategies, one of which involves adopting a modular construction approach. This method is believed to be fast, efficient, and environmentally friendly. Despite its perceived benefits, some critics argue that the environmental advantage of the modular construction approach remains unclear, as it increases transportation activity. This study dives into the process of modular house construction and quantifies the environmental impacts of each stage involved in the process. It is found that the environmental impacts of all stages in the construction process amount to 1588.44 kgCO2. Among these stages, the raw materials extraction stage holds the largest contribution share, accounting for 94% of the total emissions. In contrast, stages related to transportation activity have a relatively low contribution share, which is 2.5%. To mitigate this impact, practitioners could optimize building design, reduce the use of high embodied carbon materials, and improve workers' competency.
- 17 November 2023
- Published by EDP Sciences in E3S Web of Conferences
- Vol. 448, 03040
Open AccessCarbon Emissions Analysis of Modular House Construction
Amidst the pressing issue of the climate crisis, the concern of housing backlog requires sustained and intensive growth in housing construction. To address this challenge while also considering environmental impacts, the Indonesian Government has prepared various strategies, one of which involves adopting a modular construction approach. This method is believed to be fast, efficient, and environmentally friendly. Despite its perceived benefits, some critics argue that the environmental advantage of the modular construction approach remains unclear, as it increases transportation activity. This study dives into the process of modular house construction and quantifies the environmental impacts of each stage involved in the process. It is found that the environmental impacts of all stages in the construction process amount to 1588.44 kgCO2. Among these stages, the raw materials extraction stage holds the largest contribution share, accounting for 94% of the total emissions. In contrast, stages related to transportation activity have a relatively low contribution share, which is 2.5%. To mitigate this impact, practitioners could optimize building design, reduce the use of high embodied carbon materials, and improve workers' competency.
- Open Access
- 30 January 2023
- Published by Institute of Research and Community Services Diponegoro University (LPPM UNDIP) in MEDIA KOMUNIKASI TEKNIK SIPIL
- Vol. 28 (2) , 212-218
Project Delays Caused by the Owner: Evaluation of Causal Factors and Contractor Claims
Delays in construction projects are generally understood to be the sole responsibility of the contractor. In fact, these delays can also be caused by factors that actually are the responsibility of the owner, resulting in project completion exceeding the contract target date. As a result, the contractors can be affected and suffer losses due to delays that are not actually their responsibility. This study intends to evaluate project delays caused by the owner and the delay claims submitted by the contractor. This research is exploratory and uses a mixed method of quantitative and qualitative approach. Data was collected through interviews and questionnaires with 80 respondents of the construction industry. The study found five main factors causing delays caused by the owner, including: land acquisition problems, changes in design and work instructions, payment problems, and unclear drawings in the contract documents. Of these delays, the majority (93%) were claimed by contractors, with an average claim success rate of 53%, and the compensation generally in the form of extension of project completion time (63%). The most frequently chosen claim dispute settlement method (93%) is non-litigation settlement through negotiation. This research has provided a comprehensive overview of delays due to owners and the contractor claims, and gives valuable lessons for the construction industry stakeholders to cope with delays in the future.
- 30 January 2023
- Published by Institute of Research and Community Services Diponegoro University (LPPM UNDIP) in MEDIA KOMUNIKASI TEKNIK SIPIL
- Vol. 28 (2) , 212-218
Open AccessProject Delays Caused by the Owner: Evaluation of Causal Factors and Contractor Claims
Delays in construction projects are generally understood to be the sole responsibility of the contractor. In fact, these delays can also be caused by factors that actually are the responsibility of the owner, resulting in project completion exceeding the contract target date. As a result, the contractors can be affected and suffer losses due to delays that are not actually their responsibility. This study intends to evaluate project delays caused by the owner and the delay claims submitted by the contractor. This research is exploratory and uses a mixed method of quantitative and qualitative approach. Data was collected through interviews and questionnaires with 80 respondents of the construction industry. The study found five main factors causing delays caused by the owner, including: land acquisition problems, changes in design and work instructions, payment problems, and unclear drawings in the contract documents. Of these delays, the majority (93%) were claimed by contractors, with an average claim success rate of 53%, and the compensation generally in the form of extension of project completion time (63%). The most frequently chosen claim dispute settlement method (93%) is non-litigation settlement through negotiation. This research has provided a comprehensive overview of delays due to owners and the contractor claims, and gives valuable lessons for the construction industry stakeholders to cope with delays in the future.
- Open Access
- 19 December 2022
- Published by Universitas Muhammadiyah Jakarta in Konstruksia
- Vol. 13 (1) , 113-127
BEBAN MAKSIMUM, TEGANGAN, LENDUTAN DAN MOMEN CURVATUR PADA VARIASI JEMBATAN BETON BALOK T DENGAN MENGGUNAKAN SOFTWARE RESPONSE 2000
Jembatan menjadi media transportasi utama untuk menghubungkan suatu daerah yang terpisah oleh sungai, rel kereta, atau lembah. Analisis jembatan digunakan untuk mengetahui gaya – gaya yang terjadi dan dapat menghindari terjadinya musibah runtuhnya jembatan. Pada penelitian ini bertujuan untuk mengetahu beban maksimum, tegangan, lendutan dan momen curvature yang terjadi pada jembatan beton balok T. Data – data yang digunakan pada penelitian ini menggunakan data yang diasumsikan. Pembeban jembatan dilakukan pada benda uji dengan acuan SNI 1725:2016. Data pembebanan jembatan berupa gaya aksial yang terjadi pada jembatan. Analisis ini dilakukan menggunakan software response – 2000. Panjang bentang jembatan sebesar 15 m dengan luas penampang yang sama dan tulangan yang sama tetapi memilik dimensi yang berbeda. Hasil analisis berupa grafik tegangan, lendutan, load max deflection dan momen curvature. Grafik tegangan mendapatkan hasil berupa gaya tekan dan gaya tarik yang bekerja pada jembatan. Tegangan terkecil terjadi pada BT 1 sebesar 24,81 MPa. Lendutan yang dihasilkan memdapatkan data yang bervariasi dengan lendutan terkecil sebesar 174,59 mm pada tengah bentang. Momen curvature terjadi karena momen yang menyebabkan curvature pada balok dengan momen curvature terkecil pada BT3 sebesar 44,526 rad/km. Beban ultimate mempengaruhi lendutan yang terjadi dengan beban terbesar terjadi pada BT 3 sebesar 117,163 kN.
- 19 December 2022
- Published by Universitas Muhammadiyah Jakarta in Konstruksia
- Vol. 13 (1) , 113-127
Open AccessBEBAN MAKSIMUM, TEGANGAN, LENDUTAN DAN MOMEN CURVATUR PADA VARIASI JEMBATAN BETON BALOK T DENGAN MENGGUNAKAN SOFTWARE RESPONSE 2000
Jembatan menjadi media transportasi utama untuk menghubungkan suatu daerah yang terpisah oleh sungai, rel kereta, atau lembah. Analisis jembatan digunakan untuk mengetahui gaya – gaya yang terjadi dan dapat menghindari terjadinya musibah runtuhnya jembatan. Pada penelitian ini bertujuan untuk mengetahu beban maksimum, tegangan, lendutan dan momen curvature yang terjadi pada jembatan beton balok T. Data – data yang digunakan pada penelitian ini menggunakan data yang diasumsikan. Pembeban jembatan dilakukan pada benda uji dengan acuan SNI 1725:2016. Data pembebanan jembatan berupa gaya aksial yang terjadi pada jembatan. Analisis ini dilakukan menggunakan software response – 2000. Panjang bentang jembatan sebesar 15 m dengan luas penampang yang sama dan tulangan yang sama tetapi memilik dimensi yang berbeda. Hasil analisis berupa grafik tegangan, lendutan, load max deflection dan momen curvature. Grafik tegangan mendapatkan hasil berupa gaya tekan dan gaya tarik yang bekerja pada jembatan. Tegangan terkecil terjadi pada BT 1 sebesar 24,81 MPa. Lendutan yang dihasilkan memdapatkan data yang bervariasi dengan lendutan terkecil sebesar 174,59 mm pada tengah bentang. Momen curvature terjadi karena momen yang menyebabkan curvature pada balok dengan momen curvature terkecil pada BT3 sebesar 44,526 rad/km. Beban ultimate mempengaruhi lendutan yang terjadi dengan beban terbesar terjadi pada BT 3 sebesar 117,163 kN.