Ivan Podadera
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Research Interests
Ivan Podadera has a total of 383 co-authors. Here are the top co-authors by number of shared publications:
- Angel Ibarra
IFMIF-DONES España, Granada, Spain
12 shared publications - Jesus Castellanos
Universidad de Castilla-La Mancha, Toledo, Spain
7 shared publications - David Jiménez Rey
CIEMAT, Madrid, Spain
6 shared publications - Claudio Torregrosa Martin
IFMIF-DONES España, Granada, Spain
5 shared publications - Daniel Sánchez-Herranz
Univ Granada, Granada, Spain
5 shared publications F. Wenander
ISOLDE
5 shared publications
Latest Publications
- Open Access
- 29 September 2026
- Published by Springer Nature in EPJ Research Infrastructures
- Vol. 10 (1) , 33
AI-Based Control of Differential Vacuum in the MuVacAS Prototype for IFMIF–DONES Particle Accelerator
- 29 September 2026
- Published by Springer Nature in EPJ Research Infrastructures
- Vol. 10 (1) , 33
Open AccessAI-Based Control of Differential Vacuum in the MuVacAS Prototype for IFMIF–DONES Particle Accelerator
- 17 June 2026
- Published by Elsevier in Fusion Engineering and Design
- Vol. 230
Soil-foundation-structure interaction analysis of IFMIF-DONES main building
- 17 June 2026
- Published by Elsevier in Fusion Engineering and Design
- Vol. 230
Soil-foundation-structure interaction analysis of IFMIF-DONES main building
- Open Access
- 23 December 2025
- Published by Elsevier in Fusion Engineering and Design
- Vol. 224
Comparison of remote access technologies for research facilities using EPICS/CSS. Application to particle accelerator experiments
- 23 December 2025
- Published by Elsevier in Fusion Engineering and Design
- Vol. 224
Open AccessComparison of remote access technologies for research facilities using EPICS/CSS. Application to particle accelerator experiments
- Open Access
- 30 September 2025
- Published by IOP Publishing in Nuclear Fusion
- Vol. 65 (12) , 122011
Overview and current status of the IFMIF-DONES accelerator systems
The IFMIF-DONES facility provides a very high intensity flux of neutrons for research on materials of future fusion reactors and other complementary applications. The generation of those neutrons is driven by stripping reactions between energetic deuteron particles and a liquid lithium jet. The requirements on the deuteron beam are to deliver a 40 MeV beam with a constant current of 125 mA. All the systems involved in the generation, acceleration, transport and shaping of the deuteron beam are grouped in the so-called accelerator systems (AS). The design of this high-power driver has been ongoing for a long time, and many prototypes of the critical technologies have been tested. During the last decade, the design has been consolidated and evolved into an engineering design ready for construction. The overview of the main features of the design and the current status is presented in this article.
- 30 September 2025
- Published by IOP Publishing in Nuclear Fusion
- Vol. 65 (12) , 122011
Open AccessOverview and current status of the IFMIF-DONES accelerator systems
The IFMIF-DONES facility provides a very high intensity flux of neutrons for research on materials of future fusion reactors and other complementary applications. The generation of those neutrons is driven by stripping reactions between energetic deuteron particles and a liquid lithium jet. The requirements on the deuteron beam are to deliver a 40 MeV beam with a constant current of 125 mA. All the systems involved in the generation, acceleration, transport and shaping of the deuteron beam are grouped in the so-called accelerator systems (AS). The design of this high-power driver has been ongoing for a long time, and many prototypes of the critical technologies have been tested. During the last decade, the design has been consolidated and evolved into an engineering design ready for construction. The overview of the main features of the design and the current status is presented in this article.
- Open Access
- 30 June 2025
- Published by IOP Publishing in Nuclear Fusion
- Vol. 65 (12) , 122010
Update on the status of the IFMIF-DONES Test Systems
The IFMIF-DONES Test Systems (TS) gather the experimental facilities offered by the plant, as well as the ancillary systems providing supplies and services both to those facilities and the irradiation modules, the latter ones belonging to the TS, although being excluded from the scope of this article. The irradiation modules gather any system that will be irradiated behind the lithium target inside the Test Cell (TC). Therefore, the Test Cell also houses the liquid Li target and the stripping reaction held between the latter and the D+ beam. The Test Cell is described in section 2, addressing as well some detail (section 2.1) about transversal key aspects like safety, RAMI, maintenance and others, although the safety aspects are collected in a dedicated part (section 5). The vacuum vessel is described in sections 2.2.1 and 2.2.3, relevant outputs from seismic, thermo-structural and fluido-dynamics analyses being as well provided. The shielding blocks are described in section 2.2.2, the lining part covering the building cavity filled in section 2.2.4, the floor in section 2.2.5, and the uppermost part in section 2.2.6. Section 3 is fully dedicated to the Test Systems Ancillaries, a summary description being included for each of thesubsystems, as well as an overview of their functional requirements. Section 4 provides a functional description of the different facilities for complementary experiments, apart from the TC. Section 5 is focused on safety issues applicable not only to the TC but to all the test systems included in the present article. Next, the current guidelines are given for the alignment (section 6) of the in-vessel systems and the integrated commissioning inside the TC (section 7). Finally, section 8 collects the main conclusions about the current status of the design of the Test Systems, irradiation modules excluded.
- 30 June 2025
- Published by IOP Publishing in Nuclear Fusion
- Vol. 65 (12) , 122010
Open AccessUpdate on the status of the IFMIF-DONES Test Systems
The IFMIF-DONES Test Systems (TS) gather the experimental facilities offered by the plant, as well as the ancillary systems providing supplies and services both to those facilities and the irradiation modules, the latter ones belonging to the TS, although being excluded from the scope of this article. The irradiation modules gather any system that will be irradiated behind the lithium target inside the Test Cell (TC). Therefore, the Test Cell also houses the liquid Li target and the stripping reaction held between the latter and the D+ beam. The Test Cell is described in section 2, addressing as well some detail (section 2.1) about transversal key aspects like safety, RAMI, maintenance and others, although the safety aspects are collected in a dedicated part (section 5). The vacuum vessel is described in sections 2.2.1 and 2.2.3, relevant outputs from seismic, thermo-structural and fluido-dynamics analyses being as well provided. The shielding blocks are described in section 2.2.2, the lining part covering the building cavity filled in section 2.2.4, the floor in section 2.2.5, and the uppermost part in section 2.2.6. Section 3 is fully dedicated to the Test Systems Ancillaries, a summary description being included for each of thesubsystems, as well as an overview of their functional requirements. Section 4 provides a functional description of the different facilities for complementary experiments, apart from the TC. Section 5 is focused on safety issues applicable not only to the TC but to all the test systems included in the present article. Next, the current guidelines are given for the alignment (section 6) of the in-vessel systems and the integrated commissioning inside the TC (section 7). Finally, section 8 collects the main conclusions about the current status of the design of the Test Systems, irradiation modules excluded.
- Open Access
- 20 June 2024
- Published by Elsevier in Nuclear Materials and Energy
- Vol. 40
Update of the 5 MW Beam-on-Target Requirements for improvement of the materials irradiation performance at IFMIF-DONES
- 20 June 2024
- Published by Elsevier in Nuclear Materials and Energy
- Vol. 40
Open AccessUpdate of the 5 MW Beam-on-Target Requirements for improvement of the materials irradiation performance at IFMIF-DONES
- 1 May 2024
- Published by IOP Publishing in Journal of Instrumentation
- Vol. 19 (05) , T05013
High beam current operation with beam diagnostics at LIPAc
The Linear International Fusion Materials Irradiation Facility Prototype Accelerator (LIPAc) is under commissioning in Rokkasho Fusion Institute in Japan and aims to accelerate 125 mA D+ at 9 MeV in Continuous Wave mode for validating the IFMIF accelerator design. To ensure a fine characterization and tuning of the machine many beam diagnostics are installed spanning from injector to the beam dump. The beam operations in 1.0 ms pulsed D+ at 5 MeV were successfully completed with a low power beam dump in 2019. Despite the challenges posed by the pandemic, the crucial transition to a new LINAC configuration was also finalized to enable operation in 1.0 ms — CW D+ at 5 MeV with the high-power beam dump. The 1st beam operation of the configuration was carried out in 2021. The experiences and challenges encountered during these beam campaigns are described in this paper.
- 1 May 2024
- Published by IOP Publishing in Journal of Instrumentation
- Vol. 19 (05) , T05013
High beam current operation with beam diagnostics at LIPAc
The Linear International Fusion Materials Irradiation Facility Prototype Accelerator (LIPAc) is under commissioning in Rokkasho Fusion Institute in Japan and aims to accelerate 125 mA D+ at 9 MeV in Continuous Wave mode for validating the IFMIF accelerator design. To ensure a fine characterization and tuning of the machine many beam diagnostics are installed spanning from injector to the beam dump. The beam operations in 1.0 ms pulsed D+ at 5 MeV were successfully completed with a low power beam dump in 2019. Despite the challenges posed by the pandemic, the crucial transition to a new LINAC configuration was also finalized to enable operation in 1.0 ms — CW D+ at 5 MeV with the high-power beam dump. The 1st beam operation of the configuration was carried out in 2021. The experiences and challenges encountered during these beam campaigns are described in this paper.
- 11 March 2024
- Published by Elsevier in Fusion Engineering and Design
- Vol. 202
Engineering design status of IFMIF-DONES High Energy Beam Transport line and Beam Dump system inside the TIR and RIZ
- 11 March 2024
- Published by Elsevier in Fusion Engineering and Design
- Vol. 202
Engineering design status of IFMIF-DONES High Energy Beam Transport line and Beam Dump system inside the TIR and RIZ