Changjun Wang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Changjun Wang has a total of 9 co-authors. Here are the top co-authors by number of shared publications:
- Shutong Chen
Glorious Sun School of Business and Management, Donghua University, No. 1882 West Yan’an Road, Shanghai 200051, China
2 shared publications - Bing Wang
School of Mechatronic Engineering and Automation, Shanghai University, Shanghai 200072, China
1 shared publication - Dong Yang
School of Business and Management, Donghua University, Shanghai 200051, China
1 shared publication - Jia Chen1 shared publication
Li-Meng-Tao Zhong
Business School, Sichuan University, Chengdu, China
1 shared publication- XiaoZhi Wang1 shared publication
Latest Publications
- 5 August 2025
- Published by Elsevier in Expert Systems with Applications
- Vol. 296
Tactical planning of the wind turbine manufacturing supply chain: modeling, solution methods, and real case study
- 5 August 2025
- Published by Elsevier in Expert Systems with Applications
- Vol. 296
Tactical planning of the wind turbine manufacturing supply chain: modeling, solution methods, and real case study
- 28 March 2024
- Published by Springer Nature in Annals of Operations Research
- Vol. 355 (3) , 2999-3047
Reliable design of humanitarian supply chain under correlated disruptions: a two-stage distributionally robust approach
- 28 March 2024
- Published by Springer Nature in Annals of Operations Research
- Vol. 355 (3) , 2999-3047
Reliable design of humanitarian supply chain under correlated disruptions: a two-stage distributionally robust approach
- Open Access
- 1 January 2023
- Published by American Institute of Mathematical Sciences (AIMS) in AIMS Mathematics
- Vol. 8 (2) , 4524-4550
Two-stage stochastic programming with imperfect information update: Value evaluation and information acquisition game
We focus on the two-stage stochastic programming (SP) with information update, and study how to evaluate and acquire information, especially when the information is imperfect. The scarce-data setting in which the probabilistic interdependent relationship within the updating process is unavailable, and thus, the classic Bayes' theorem is inapplicable. To address this issue, a robust approach is proposed to identify the worst probabilistic relationship of information update within the two-stage SP, and the robust Expected Value of Imperfect Information (EVII) is evaluated by developing a scenario-based max-min-min model with the bi-level structure. Three ways are developed to find the optimal solution for different settings. Furthermore, we study a costly information acquisition game between a two-stage SP decision-maker and an exogenous information provider. A linear compensation contract is designed to realize the global optimum. Finally, the proposed approach is applied to address a two-stage production and shipment problem to validate the effectiveness of our work. This paper enriches the interactions between uncertain optimization and information management and enables decision-makers to evaluate and manage imperfect information in a scarce-data setting.
- 1 January 2023
- Published by American Institute of Mathematical Sciences (AIMS) in AIMS Mathematics
- Vol. 8 (2) , 4524-4550
Open AccessTwo-stage stochastic programming with imperfect information update: Value evaluation and information acquisition game
We focus on the two-stage stochastic programming (SP) with information update, and study how to evaluate and acquire information, especially when the information is imperfect. The scarce-data setting in which the probabilistic interdependent relationship within the updating process is unavailable, and thus, the classic Bayes' theorem is inapplicable. To address this issue, a robust approach is proposed to identify the worst probabilistic relationship of information update within the two-stage SP, and the robust Expected Value of Imperfect Information (EVII) is evaluated by developing a scenario-based max-min-min model with the bi-level structure. Three ways are developed to find the optimal solution for different settings. Furthermore, we study a costly information acquisition game between a two-stage SP decision-maker and an exogenous information provider. A linear compensation contract is designed to realize the global optimum. Finally, the proposed approach is applied to address a two-stage production and shipment problem to validate the effectiveness of our work. This paper enriches the interactions between uncertain optimization and information management and enables decision-makers to evaluate and manage imperfect information in a scarce-data setting.
- Open Access
- 1 January 2021
- Published by IOP Publishing in Journal of Physics: Conference Series
- Vol. 1746 (1) , 012024
Simulation of the Worst Failure Probability of Sharing Platform under Unknown Demand Distribution
The sharing economy integrates the idle resources to match the fragmented market demand via the Internet platform. Different from the supply side, the demand is highly uncertain, in which, significant spikes and valleys exist. Therefore, it is assumed that only the statistical characteristics, instead of precise distributions, are known. The matching efficiency of supply and demand in sharing platform is studied. Firstly, a linear programming model under the moment constraints is proposed to describe the worst failure possibility in demand satisfaction. Then, the equivalent semi-infinite program is developed by Lagrange duality, and the analytical expression of the worst failure probability can be given. Finally, simulation study is implemented. This work not only riches the studies of moment-based bound, but also provides the managerial insights to the demand management of the sharing platform in the uncertain setting.
- 1 January 2021
- Published by IOP Publishing in Journal of Physics: Conference Series
- Vol. 1746 (1) , 012024
Open AccessSimulation of the Worst Failure Probability of Sharing Platform under Unknown Demand Distribution
The sharing economy integrates the idle resources to match the fragmented market demand via the Internet platform. Different from the supply side, the demand is highly uncertain, in which, significant spikes and valleys exist. Therefore, it is assumed that only the statistical characteristics, instead of precise distributions, are known. The matching efficiency of supply and demand in sharing platform is studied. Firstly, a linear programming model under the moment constraints is proposed to describe the worst failure possibility in demand satisfaction. Then, the equivalent semi-infinite program is developed by Lagrange duality, and the analytical expression of the worst failure probability can be given. Finally, simulation study is implemented. This work not only riches the studies of moment-based bound, but also provides the managerial insights to the demand management of the sharing platform in the uncertain setting.
- Open Access
- 7 March 2019
- Published by Wiley in Discrete Dynamics in Nature and Society
- Vol. 2019, 1-28
Incorporating a Bayesian Network into Two-Stage Stochastic Programming for Blood Bank Location-Inventory Problem in Case of Disasters
This paper is concerned with the optimal decisions of blood banks in a blood logistics network (BLN) with the consideration of natural disasters. One of the biggest challenges is how to deal with unexpected disasters. Our idea is to consider the disasters as the natural consequences of interaction among multiple interdependent uncertain factors, such as the locations and the levels of disasters, the number of casualties, and the availabilities of rescue facilities, which work together to influence the rescue effects of the BLN. Thus, taking earthquakes as the example, a Bayesian Network is proposed to describe such uncertainties and interdependences and, then, we incorporate it into a dedicated two-stage multi-period stochastic programming model for the BLN. The planning stage in the model focuses on blood bank location and inventory decisions. The subsequent operational stage is composed of multiple periods, some of which may suffer disasters and initiate corresponding rescue operations. Numerical tests show that the proposed approach can be efficiently applied in blood management under the complicated disaster scenarios.
- 7 March 2019
- Published by Wiley in Discrete Dynamics in Nature and Society
- Vol. 2019, 1-28
Open AccessIncorporating a Bayesian Network into Two-Stage Stochastic Programming for Blood Bank Location-Inventory Problem in Case of Disasters
This paper is concerned with the optimal decisions of blood banks in a blood logistics network (BLN) with the consideration of natural disasters. One of the biggest challenges is how to deal with unexpected disasters. Our idea is to consider the disasters as the natural consequences of interaction among multiple interdependent uncertain factors, such as the locations and the levels of disasters, the number of casualties, and the availabilities of rescue facilities, which work together to influence the rescue effects of the BLN. Thus, taking earthquakes as the example, a Bayesian Network is proposed to describe such uncertainties and interdependences and, then, we incorporate it into a dedicated two-stage multi-period stochastic programming model for the BLN. The planning stage in the model focuses on blood bank location and inventory decisions. The subsequent operational stage is composed of multiple periods, some of which may suffer disasters and initiate corresponding rescue operations. Numerical tests show that the proposed approach can be efficiently applied in blood management under the complicated disaster scenarios.
- Open Access
- 1 January 2019
- Published by Wiley in Complexity
- Vol. 2019 (1)
Planning of Cascade Hydropower Stations with the Consideration of Long‐Term Operations under Uncertainties
In the location‐related planning of a hydropower system, the consideration of future operations under uncertainties can make the decisions sustainable and robust. Then, it is of great importance to develop an effective approach that deals with the long‐term stochasticity due to the long‐lasting effects of the location selections. Thus, we propose a multistage stochastic programming model to optimize the planning decisions of cascade hydropower stations and the long‐term stochastic operations in an integrated way. The first stage (i.e., the planning stage) in the model deals with the location and capacity decisions of the hydropower stations, while the subsequent stages implement the scheduling decisions under each stagewise stochastic scenario. To address the curse of dimensionality caused by the long‐term stochastic operations, we further propose a novel dimensionality reduction approach based on dual equilibrium to transform the multistage model into a tractable two‐stage stochastic program. The applicability of our approach is validated by a case study based on a basin of Yangtze River, China, and corresponding sensitivity analysis.
- 1 January 2019
- Published by Wiley in Complexity
- Vol. 2019 (1)
Open AccessPlanning of Cascade Hydropower Stations with the Consideration of Long‐Term Operations under Uncertainties
In the location‐related planning of a hydropower system, the consideration of future operations under uncertainties can make the decisions sustainable and robust. Then, it is of great importance to develop an effective approach that deals with the long‐term stochasticity due to the long‐lasting effects of the location selections. Thus, we propose a multistage stochastic programming model to optimize the planning decisions of cascade hydropower stations and the long‐term stochastic operations in an integrated way. The first stage (i.e., the planning stage) in the model deals with the location and capacity decisions of the hydropower stations, while the subsequent stages implement the scheduling decisions under each stagewise stochastic scenario. To address the curse of dimensionality caused by the long‐term stochastic operations, we further propose a novel dimensionality reduction approach based on dual equilibrium to transform the multistage model into a tractable two‐stage stochastic program. The applicability of our approach is validated by a case study based on a basin of Yangtze River, China, and corresponding sensitivity analysis.
- 9 September 2010
- Published by American Society of Civil Engineers (ASCE)
- p. 4123-4129
Incentive Contract Design for Logistics Outsourcing under Double Moral Hazard
This paper studies the characteristics of optimal logistics outsourcing contracts when both actors are risk-neutral in the double moral-hazard situation. Our study compares both parties' effort levels under the complete and the asymmetric information and then reveals the reasonable range and the optimal solution of commission ration β in the output-based incentive contract. Furthermore, we explore in depth the optimal design for incentive contract.
- 9 September 2010
- Published by American Society of Civil Engineers (ASCE)
- p. 4123-4129
Incentive Contract Design for Logistics Outsourcing under Double Moral Hazard
This paper studies the characteristics of optimal logistics outsourcing contracts when both actors are risk-neutral in the double moral-hazard situation. Our study compares both parties' effort levels under the complete and the asymmetric information and then reveals the reasonable range and the optimal solution of commission ration β in the output-based incentive contract. Furthermore, we explore in depth the optimal design for incentive contract.