Libby Schweber
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Libby Schweber has a total of 18 co-authors. Here are the top co-authors by number of shared publications:
Carla Hesse
1 shared publication- Chris Harty
London South Bank University, (School of the Built Environment and Architecture Dean), United Kingdom
1 shared publication - David Jefferies
Formerly at the University of Reading, Reading
1 shared publication Graeme D. Larsen
School of Construction Management and Engineering, University of Reading, Reading, UK
1 shared publication- Hasan Haroglu
Univ. of Doha for Science and Technology
1 shared publication Howard Bloch
1 shared publication
Latest Publications
- Open Access
- 17 July 2026
- Published by Ubiquity Press, Ltd. in Buildings and Cities
- Vol. 7 (1) , 791-807
Negotiating net-zero carbon: an ANT analysis of two buildings
The request for a net-zero carbon (NZC) building poses a major challenge for project teams. As a goal, the concept is both ambitious and underspecified. While much of the literature treats NZC building as a problem of standard setting, technical specifications and management protocols, actor–network theory draws attention to the ‘messiness’ that project team members face. This paper explores how project teams on two non-domestic new builds in the UK engaged with the concept of NZC. The research relies on semi-structured interviews with key project team members and documentary analysis. The analysis draws attention to the central role of inscriptions in rendering carbon visible, to the role of negotiable and non-negotiable constraints and to the overflow of discussions from a focus on carbon to a myriad of competing concerns. The analysis identifies three distinct negotiation processes – coordinated overflow, nomadic overflow and contentious overflow – and draws attention to the distinctive role of inscriptions in each. PRACTICE RELEVANCE The NZC concept has recently moved up the list of client requirements for non-domestic UK buildings. This paper explores the challenges that project teams faced on two building projects. Key findings concern the overlay of different, often conflicting, project goals and the importance of framing and inscription devices in managing those tensions. The analysis highlights the need for project teams to take into account: the range of assumptions and risks hidden in carbon calculations; the knock-on effects of carbon relevant design choices; the role of inscriptions and visual representations in framing carbon relevant decisions; and the overlay of distinct and sometimes conflicting concerns. Implications are drawn for standards, visual representations of carbon, project roles and professional training.
- 17 July 2026
- Published by Ubiquity Press, Ltd. in Buildings and Cities
- Vol. 7 (1) , 791-807
Open AccessNegotiating net-zero carbon: an ANT analysis of two buildings
The request for a net-zero carbon (NZC) building poses a major challenge for project teams. As a goal, the concept is both ambitious and underspecified. While much of the literature treats NZC building as a problem of standard setting, technical specifications and management protocols, actor–network theory draws attention to the ‘messiness’ that project team members face. This paper explores how project teams on two non-domestic new builds in the UK engaged with the concept of NZC. The research relies on semi-structured interviews with key project team members and documentary analysis. The analysis draws attention to the central role of inscriptions in rendering carbon visible, to the role of negotiable and non-negotiable constraints and to the overflow of discussions from a focus on carbon to a myriad of competing concerns. The analysis identifies three distinct negotiation processes – coordinated overflow, nomadic overflow and contentious overflow – and draws attention to the distinctive role of inscriptions in each. PRACTICE RELEVANCE The NZC concept has recently moved up the list of client requirements for non-domestic UK buildings. This paper explores the challenges that project teams faced on two building projects. Key findings concern the overlay of different, often conflicting, project goals and the importance of framing and inscription devices in managing those tensions. The analysis highlights the need for project teams to take into account: the range of assumptions and risks hidden in carbon calculations; the knock-on effects of carbon relevant design choices; the role of inscriptions and visual representations in framing carbon relevant decisions; and the overlay of distinct and sometimes conflicting concerns. Implications are drawn for standards, visual representations of carbon, project roles and professional training.
- 14 July 2023
- Published by Edward Elgar Publishing
- p. 67-92
Theory and the contribution of qualitative research to construction management research
Qualitative research has a great deal to offer Construction Management Research (CMR), most notably in the way in which the judicious use of theory moves research beyond common sense and introduces new and interesting ways of thinking about recognised problems. However, this contribution is often compromised by a positivist use of the interpretivist approach. This chapter develops this argument by reviewing the defining features of qualitative research and making a case for the centrality of theory. Drawing on Sandberg and Alvesson’s (2021) typology, it contrasts the positivist ‘representationalist’ use of theory with five other types common in qualitative research and exemplifies them with CMR papers. The five types include: explaining, ordering, comprehending, enacting and provoking. The discussion reflects on the use of each type and highlights their contribution to academic research and practical industry concerns. The chapter concludes with lessons for doctoral students, early career researchers and established scholars.
- 14 July 2023
- Published by Edward Elgar Publishing
- p. 67-92
Theory and the contribution of qualitative research to construction management research
Qualitative research has a great deal to offer Construction Management Research (CMR), most notably in the way in which the judicious use of theory moves research beyond common sense and introduces new and interesting ways of thinking about recognised problems. However, this contribution is often compromised by a positivist use of the interpretivist approach. This chapter develops this argument by reviewing the defining features of qualitative research and making a case for the centrality of theory. Drawing on Sandberg and Alvesson’s (2021) typology, it contrasts the positivist ‘representationalist’ use of theory with five other types common in qualitative research and exemplifies them with CMR papers. The five types include: explaining, ordering, comprehending, enacting and provoking. The discussion reflects on the use of each type and highlights their contribution to academic research and practical industry concerns. The chapter concludes with lessons for doctoral students, early career researchers and established scholars.
- Open Access
- 26 July 2022
- Published by Ubiquity Press, Ltd. in Buildings and Cities
- Vol. 3 (1) , 518-533
Professional judgement: an institutional logic approach to contractor tender pricing
- 26 July 2022
- Published by Ubiquity Press, Ltd. in Buildings and Cities
- Vol. 3 (1) , 518-533
Open AccessProfessional judgement: an institutional logic approach to contractor tender pricing
- 31 December 2020
- Published by Walter de Gruyter GmbH
- p. 157-176
7 Limits to Institutionalization
7 Limits to Institutionalization was published in Disciplining Statistics on page 157.
- 31 December 2020
- Published by Walter de Gruyter GmbH
- p. 157-176
7 Limits to Institutionalization
7 Limits to Institutionalization was published in Disciplining Statistics on page 157.
- Open Access
- 1 December 2017
- Published by Elsevier in Energy Research & Social Science
- Vol. 34, 294-304
Jack-in-the-black-box: Using Foucault to explore the embeddedness and reach of building level assessment methods
- 1 December 2017
- Published by Elsevier in Energy Research & Social Science
- Vol. 34, 294-304
Open AccessJack-in-the-black-box: Using Foucault to explore the embeddedness and reach of building level assessment methods
- Open Access
- 26 June 2017
- Published by Taylor & Francis in Building Research & Information
- Vol. 46 (1) , 10-22
Unintended consequences: institutional artefacts, closure mechanisms and the performance gap
Renewable technologies often feature in policies to improve the energy efficiency of buildings. Designers introduce predicted energy values for specific technologies, but are surprised when the technologies fail to perform as expected. Three building projects are used to explore the effect of construction processes on the energy performance of building-integrated photovoltaic (BIPV) technology. In two cases BIPV failed to deliver expected energy generation, while in the third, dramatic changes in project processes and technical specifications were needed to achieve the specified output. A social construction of technology (SCOT) analysis documents how the energy generation of BIPV disappeared from view at certain points as actors focused on building features. A contribution is made to the theoretical development of SCOT by responding to two issues: privileging of cognitive closure mechanisms and the neglect of institutional analysis. The concept of inflection mechanisms is introduced as a second type of closure mechanism. More specifically, the role of institutional artefacts (e.g. planning requirements and schedules) in the construction process is found to contribute to the performance gap. To reduce the ‘performance gap’, practitioners need to focus on the distribution of design responsibility, sequencing of work and the location of expertise.
- 26 June 2017
- Published by Taylor & Francis in Building Research & Information
- Vol. 46 (1) , 10-22
Open AccessUnintended consequences: institutional artefacts, closure mechanisms and the performance gap
Renewable technologies often feature in policies to improve the energy efficiency of buildings. Designers introduce predicted energy values for specific technologies, but are surprised when the technologies fail to perform as expected. Three building projects are used to explore the effect of construction processes on the energy performance of building-integrated photovoltaic (BIPV) technology. In two cases BIPV failed to deliver expected energy generation, while in the third, dramatic changes in project processes and technical specifications were needed to achieve the specified output. A social construction of technology (SCOT) analysis documents how the energy generation of BIPV disappeared from view at certain points as actors focused on building features. A contribution is made to the theoretical development of SCOT by responding to two issues: privileging of cognitive closure mechanisms and the neglect of institutional analysis. The concept of inflection mechanisms is introduced as a second type of closure mechanism. More specifically, the role of institutional artefacts (e.g. planning requirements and schedules) in the construction process is found to contribute to the performance gap. To reduce the ‘performance gap’, practitioners need to focus on the distribution of design responsibility, sequencing of work and the location of expertise.
- 26 September 2016
- Published by Taylor & Francis in Building Research & Information
- Vol. 45 (8) , 910-925
Client engagement and building design: the view from actor–network theory
The accommodation of client expectations in a construction project is challenging. This is, in part, because a client is rarely a single individual and their expectations are rarely static. This paper uses the actor–network theory (ANT) concepts of problematization, enrolment and durability to explore client engagement. The contribution of ANT lies in its (ontological) model of distributed agency, fluid heterogeneous networks and associated effects. A pilot study of a single building project provides an opportunity to theorize the different ways that clients engage in the development of a building. Client engagement differs with the direct versus mediated presence of different client actors, with the devices used to mediate negotiations and with the relative materiality of the network. The findings move the discussion of client engagement beyond the usual calls for better integration to an awareness of the mechanisms by which clients engage. Some decisions are fixed in material objects, while others remain open to ongoing negotiation. There is a need for explicit and continuous interaction and better awareness of when and how decisions are fixed. This would help all participants to deal with the complex and dynamic landscape of people, organizations and interests usually labelled as ‘client’.
- 26 September 2016
- Published by Taylor & Francis in Building Research & Information
- Vol. 45 (8) , 910-925
Client engagement and building design: the view from actor–network theory
The accommodation of client expectations in a construction project is challenging. This is, in part, because a client is rarely a single individual and their expectations are rarely static. This paper uses the actor–network theory (ANT) concepts of problematization, enrolment and durability to explore client engagement. The contribution of ANT lies in its (ontological) model of distributed agency, fluid heterogeneous networks and associated effects. A pilot study of a single building project provides an opportunity to theorize the different ways that clients engage in the development of a building. Client engagement differs with the direct versus mediated presence of different client actors, with the devices used to mediate negotiations and with the relative materiality of the network. The findings move the discussion of client engagement beyond the usual calls for better integration to an awareness of the mechanisms by which clients engage. Some decisions are fixed in material objects, while others remain open to ongoing negotiation. There is a need for explicit and continuous interaction and better awareness of when and how decisions are fixed. This would help all participants to deal with the complex and dynamic landscape of people, organizations and interests usually labelled as ‘client’.
- 26 January 2016
- Published by Taylor & Francis in Construction Management and Economics
- p. 1-21
Putting theory to work: the use of theory in construction research
Attention to epistemology, theory use and citation practices are all issues which distinguish academic disciplines from other ways of knowing. Examples from construction research are used to outline and reflect on these issues. In doing so, the discussion provides an introduction to some key issues in social research as well as a reflection on the current state of construction research as a field. More specifically, differences between positivist and interpretivist epistemologies, the role of theory in each and their use by construction researchers are discussed. Philosophical differences are illustrated by appeal to two published construction research articles by Reichstein et al. and Harty on innovation (Reichstein, Salter and Gann, 2005 Reichstein, T. , Salter, A.J. and Gann, D.M. (2005) Last among equals: a comparison of innovation in construction, services and manufacturing in the UK. Construction Management and Economics, 23, 631–644.10.1080/01446190500126940 [Taylor & Francis Online] [Google Scholar] ; Harty, 2008 Harty, C. (2008) Implementing innovation in construction: contexts, relative boundedness and actor-network theory. Construction Management and Economics, 26, 1029–1041.10.1080/01446190802298413 [Taylor & Francis Online] [Google Scholar] ). An analysis of citations for each highlights different cumulativity strategies. The potential contribution of mixed research programmes, combining positivist and interpretivist research, is evaluated. The paper should be of interest to early researchers and to scholars concerned with the ongoing development of construction research as an academic field.
- 26 January 2016
- Published by Taylor & Francis in Construction Management and Economics
- p. 1-21
Putting theory to work: the use of theory in construction research
Attention to epistemology, theory use and citation practices are all issues which distinguish academic disciplines from other ways of knowing. Examples from construction research are used to outline and reflect on these issues. In doing so, the discussion provides an introduction to some key issues in social research as well as a reflection on the current state of construction research as a field. More specifically, differences between positivist and interpretivist epistemologies, the role of theory in each and their use by construction researchers are discussed. Philosophical differences are illustrated by appeal to two published construction research articles by Reichstein et al. and Harty on innovation (Reichstein, Salter and Gann, 2005 Reichstein, T. , Salter, A.J. and Gann, D.M. (2005) Last among equals: a comparison of innovation in construction, services and manufacturing in the UK. Construction Management and Economics, 23, 631–644.10.1080/01446190500126940 [Taylor & Francis Online] [Google Scholar] ; Harty, 2008 Harty, C. (2008) Implementing innovation in construction: contexts, relative boundedness and actor-network theory. Construction Management and Economics, 26, 1029–1041.10.1080/01446190802298413 [Taylor & Francis Online] [Google Scholar] ). An analysis of citations for each highlights different cumulativity strategies. The potential contribution of mixed research programmes, combining positivist and interpretivist research, is evaluated. The paper should be of interest to early researchers and to scholars concerned with the ongoing development of construction research as an academic field.
- Open Access
- 8 April 2015
- Published by Taylor & Francis in Construction Management and Economics
- Vol. 33 (5-6) , 349-360
The co-development of technology and new buildings: incorporating building integrated photovoltaics
Current approaches for the reduction of carbon emissions in buildings are often predicated on the integration of renewable technologies into building projects. Building integrated photovoltaics (BIPV) is one of these technologies and brings its own set of challenges and problems with a resulting mutual articulation of this technology and the building. A Social Construction of Technology (SCOT) approach explores how negotiations between informal groups of project actors with shared interests shape the ongoing specification of both BIPV and the building. Six main groups with different interests were found to be involved in the introduction of BIPV (Cost Watchers, Design Aesthetes, Green Guardians, Design Optimizers, Generation Maximizers and Users). Their involvement around three sets of issues (design changes from lack of familiarity with the technology, misunderstandings from unfamiliar interdependencies of trades and the effects of standard firm procedure) is followed. Findings underline how BIPV requires a level of integration that typically spans different work packages and how standard contractual structures inhibit the smooth incorporation of BIPV. Successful implementation is marked by ongoing (re-)design of both the building and the technology as informal fluid groups of project actors with shared interests address the succession of problems which arise in the process of implementation.
- 8 April 2015
- Published by Taylor & Francis in Construction Management and Economics
- Vol. 33 (5-6) , 349-360
Open AccessThe co-development of technology and new buildings: incorporating building integrated photovoltaics
Current approaches for the reduction of carbon emissions in buildings are often predicated on the integration of renewable technologies into building projects. Building integrated photovoltaics (BIPV) is one of these technologies and brings its own set of challenges and problems with a resulting mutual articulation of this technology and the building. A Social Construction of Technology (SCOT) approach explores how negotiations between informal groups of project actors with shared interests shape the ongoing specification of both BIPV and the building. Six main groups with different interests were found to be involved in the introduction of BIPV (Cost Watchers, Design Aesthetes, Green Guardians, Design Optimizers, Generation Maximizers and Users). Their involvement around three sets of issues (design changes from lack of familiarity with the technology, misunderstandings from unfamiliar interdependencies of trades and the effects of standard firm procedure) is followed. Findings underline how BIPV requires a level of integration that typically spans different work packages and how standard contractual structures inhibit the smooth incorporation of BIPV. Successful implementation is marked by ongoing (re-)design of both the building and the technology as informal fluid groups of project actors with shared interests address the succession of problems which arise in the process of implementation.