Giovanni Bisoffi
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Research Interests
Giovanni Bisoffi has a total of 350 co-authors. Here are the top co-authors by number of shared publications:
- Michele Comunian
INFN Laboratori Nazionali di Legnaro, I-35020, Legnaro (Pd), Italy
14 shared publications A. Pisent
12 shared publicationsA.M. Porcellato
11 shared publicationsA. Lombardi
10 shared publications- Fabiana Gramegna
INFN Laboratori Nazionali di Legnaro
10 shared publications M. Poggi
10 shared publications
Latest Publications
- Open Access
- 1 September 2018
- Published by IOP Publishing in Journal of Physics: Conference Series
- Vol. 1067 (5) , 052017
Progress in the realization and commissioning of the exotic beam facility SPES at INFN-LNL
SPES (Selective Production of Exotic Species) is an ISOL type facility for production and post-acceleration of exotic nuclei for forefront research in nuclear physics. Radioactive (RA) species (A = 80÷160) will be produced by fissions induced by a proton beam impinging on an UCx target: the proton beam will be delivered by a commercial cyclotron with a 40 MeV maximum energy and a 0.25 mA maximum current. The RA species, extracted from the Target-Ion-Source system as a 1+ beam, will be cooled in a RFQ (radiofrequency quadrupole) beam cooler (RFQ-BC) and purified from the isobars contaminants through a High Resolution Mass Separator (HRMS). Post-acceleration will be performed via an ECR-based charge breeder, delivering the obtained q+ RA beam to a being built CW RFQ and to the being upgraded superconducting (sc) linac ALPI (up to 10 MeV/A for a mass-to-charge ratio A/q = 7).
- 1 September 2018
- Published by IOP Publishing in Journal of Physics: Conference Series
- Vol. 1067 (5) , 052017
Open AccessProgress in the realization and commissioning of the exotic beam facility SPES at INFN-LNL
SPES (Selective Production of Exotic Species) is an ISOL type facility for production and post-acceleration of exotic nuclei for forefront research in nuclear physics. Radioactive (RA) species (A = 80÷160) will be produced by fissions induced by a proton beam impinging on an UCx target: the proton beam will be delivered by a commercial cyclotron with a 40 MeV maximum energy and a 0.25 mA maximum current. The RA species, extracted from the Target-Ion-Source system as a 1+ beam, will be cooled in a RFQ (radiofrequency quadrupole) beam cooler (RFQ-BC) and purified from the isobars contaminants through a High Resolution Mass Separator (HRMS). Post-acceleration will be performed via an ECR-based charge breeder, delivering the obtained q+ RA beam to a being built CW RFQ and to the being upgraded superconducting (sc) linac ALPI (up to 10 MeV/A for a mass-to-charge ratio A/q = 7).
- Open Access
- 1 September 2018
- Published by IOP Publishing in Journal of Physics: Conference Series
- Vol. 1067 (8) , 082008
Upgrade of PIAVE superconducting RFQs at INFN-Legnaro
Superconducting RFQs (SRFQs), the first SC RFQs ever made operational for users, have been operated on the PIAVE SC heavy ion linac injector at INFN-Legnaro since 2006. The structure is split into two resonators and is limited to the accelerating RFQ sections. The resonators had never exceeded 80% of the design accelerating fields. In 2015, an upgrade plan started, aimed at increasing the accelerating fields, while improving their slow and fast tuning systems, repairing degraded components, implementing a LASER alignment method. The upgrade plan was successfully concluded in summer 2017. The resonators were kept stably locked for days at a field larger than the nominal one. Eventually, a test beam was accelerated successfully for 72 hours, with negligible locking issues. SRFQs entered once again routine operation in December 2017. The new features will allow to accelerate heavy ions with an A/q value as high as 8.5 (versus a former maximum A/q = 7.5), allowing operation of the very first accelerated uranium beams at INFN-LNL, after the related authorizations shall have been issued.
- 1 September 2018
- Published by IOP Publishing in Journal of Physics: Conference Series
- Vol. 1067 (8) , 082008
Open AccessUpgrade of PIAVE superconducting RFQs at INFN-Legnaro
Superconducting RFQs (SRFQs), the first SC RFQs ever made operational for users, have been operated on the PIAVE SC heavy ion linac injector at INFN-Legnaro since 2006. The structure is split into two resonators and is limited to the accelerating RFQ sections. The resonators had never exceeded 80% of the design accelerating fields. In 2015, an upgrade plan started, aimed at increasing the accelerating fields, while improving their slow and fast tuning systems, repairing degraded components, implementing a LASER alignment method. The upgrade plan was successfully concluded in summer 2017. The resonators were kept stably locked for days at a field larger than the nominal one. Eventually, a test beam was accelerated successfully for 72 hours, with negligible locking issues. SRFQs entered once again routine operation in December 2017. The new features will allow to accelerate heavy ions with an A/q value as high as 8.5 (versus a former maximum A/q = 7.5), allowing operation of the very first accelerated uranium beams at INFN-LNL, after the related authorizations shall have been issued.
- Open Access
- 8 April 2015
- Published by IOP Publishing in Journal of Physics: Conference Series
- Vol. 590 (1) , 012010
Nuclear Structure Studies with Stable and Radioactive Beams: The SPES radioactive ion beam project
A new Radioactive Ion Beam (RIB) facility (SPES) is presently under construction at the Legnaro National Laboratories of INFN. The SPES facility is based on the ISOL method using an UCx Direct Target able to sustain a power of 10 kW. The primary proton beam is provided by a high current Cyclotron accelerator with energy of 35-70 MeV and a beam current of 0.2-0.5 mA. Neutron-rich radioactive ions are produced by proton induced fission on an Uranium target at an expected fission rate of the order of 1013 fissions per second. After ionization and selection the exotic isotopes are re-accelerated by the ALPI superconducting LINAC at energies of 10A MeV for masses in the region A=130 amu. The expected secondary beam rates are of the order of 107 – 109 pps. Aim of the SPES facility is to deliver high intensity radioactive ion beams of neutron rich nuclei for nuclear physics research as well as to be an interdisciplinary research centre for radio-isotopes production for medicine and for neutron beams.
- 8 April 2015
- Published by IOP Publishing in Journal of Physics: Conference Series
- Vol. 590 (1) , 012010
Open AccessNuclear Structure Studies with Stable and Radioactive Beams: The SPES radioactive ion beam project
A new Radioactive Ion Beam (RIB) facility (SPES) is presently under construction at the Legnaro National Laboratories of INFN. The SPES facility is based on the ISOL method using an UCx Direct Target able to sustain a power of 10 kW. The primary proton beam is provided by a high current Cyclotron accelerator with energy of 35-70 MeV and a beam current of 0.2-0.5 mA. Neutron-rich radioactive ions are produced by proton induced fission on an Uranium target at an expected fission rate of the order of 1013 fissions per second. After ionization and selection the exotic isotopes are re-accelerated by the ALPI superconducting LINAC at energies of 10A MeV for masses in the region A=130 amu. The expected secondary beam rates are of the order of 107 – 109 pps. Aim of the SPES facility is to deliver high intensity radioactive ion beams of neutron rich nuclei for nuclear physics research as well as to be an interdisciplinary research centre for radio-isotopes production for medicine and for neutron beams.
- Open Access
- 9 February 2015
- Published by IOP Publishing in Journal of Physics: Conference Series
- Vol. 580 (1) , 012014
The SPES Radioactive Ion Beam facility of INFN
A new Radioactive Ion Beam (RIB) facility (SPES) is presently under construction at the Legnaro National Laboratories of INFN. The SPES facility is based on the ISOL method using an UCx Direct Target able to sustain a power of 10 kW. The primary proton beam is provided by a high current Cyclotron accelerator with energy of 40 MeV and a beam current of 0.2-0.5 mA. Neutron-rich radioactive ions are produced by proton induced fission at an expected fission rate of the order of 1013 fissions per second. After ionization and selection the exotic isotopes are re-accelerated by the ALPI superconducting LINAC at energies of 10A MeV for masses in the region A=130 amu. The expected secondary beam rates are of the order of 107 – 109 pps. Aim of the SPES facility is to deliver high intensity radioactive ion beams of neutron rich nuclei for nuclear physics research as well as to be an interdisciplinary research center for radio-isotopes production for medicine and for neutron beams.
- 9 February 2015
- Published by IOP Publishing in Journal of Physics: Conference Series
- Vol. 580 (1) , 012014
Open AccessThe SPES Radioactive Ion Beam facility of INFN
A new Radioactive Ion Beam (RIB) facility (SPES) is presently under construction at the Legnaro National Laboratories of INFN. The SPES facility is based on the ISOL method using an UCx Direct Target able to sustain a power of 10 kW. The primary proton beam is provided by a high current Cyclotron accelerator with energy of 40 MeV and a beam current of 0.2-0.5 mA. Neutron-rich radioactive ions are produced by proton induced fission at an expected fission rate of the order of 1013 fissions per second. After ionization and selection the exotic isotopes are re-accelerated by the ALPI superconducting LINAC at energies of 10A MeV for masses in the region A=130 amu. The expected secondary beam rates are of the order of 107 – 109 pps. Aim of the SPES facility is to deliver high intensity radioactive ion beams of neutron rich nuclei for nuclear physics research as well as to be an interdisciplinary research center for radio-isotopes production for medicine and for neutron beams.
- 1 January 2015
- Published by Jagiellonian University in Acta Physica Polonica B
- Vol. 46 (3)
The SPES Project at LNL: Status of the Project, Technical Challenges, Instrumentation, Scientific Program
- 1 January 2015
- Published by Jagiellonian University in Acta Physica Polonica B
- Vol. 46 (3)
The SPES Project at LNL: Status of the Project, Technical Challenges, Instrumentation, Scientific Program
- Open Access
- 7 July 2014
- Published by IOP Publishing in Journal of Physics: Conference Series
- Vol. 527 (1) , 012029
The SPES radioactive ion beam project of INFN
The SPES Radioactive Ion Beam facility at INFN-LNL is presently in the construction phase. The facility is based on the Isol (Isotope separation on-line) method with an UCx Direct Target able to sustain a power of 10 kW. The primary proton beam is provided by a high current Cyclotron accelerator with energy of 35-70 MeV and a beam current of 0.20.5 mA. Neutron-rich radioactive ions are produced by proton induced Uranium fission at an expected fission rate of the order of 1013 fissions per second. After ionization and selection the exotic isotopes are re-accelerated by the ALPI superconducting Linac at energies of 10A MeV for masses in the region A = 130 amu. The expected secondary beam rates are of the order of 107 – 109 pps. Aim of the SPES project is to provide a facility for high intensity radioactive ion beams for nuclear physics research as well as to develop an interdisciplinary research center based on the cyclotron proton beam.
- 7 July 2014
- Published by IOP Publishing in Journal of Physics: Conference Series
- Vol. 527 (1) , 012029
Open AccessThe SPES radioactive ion beam project of INFN
The SPES Radioactive Ion Beam facility at INFN-LNL is presently in the construction phase. The facility is based on the Isol (Isotope separation on-line) method with an UCx Direct Target able to sustain a power of 10 kW. The primary proton beam is provided by a high current Cyclotron accelerator with energy of 35-70 MeV and a beam current of 0.20.5 mA. Neutron-rich radioactive ions are produced by proton induced Uranium fission at an expected fission rate of the order of 1013 fissions per second. After ionization and selection the exotic isotopes are re-accelerated by the ALPI superconducting Linac at energies of 10A MeV for masses in the region A = 130 amu. The expected secondary beam rates are of the order of 107 – 109 pps. Aim of the SPES project is to provide a facility for high intensity radioactive ion beams for nuclear physics research as well as to develop an interdisciplinary research center based on the cyclotron proton beam.
- Open Access
- 20 March 2014
- Published by EDP Sciences in EPJ Web of Conferences
- Vol. 66, 11030
The SPES project at the INFN- Laboratori Nazionali di Legnaro
The SPES Radioactive Ion Beam (RIB) facility at INFN-LNL is in the construction phase. It is based on the ISOL method with an UCx Direct Target able to sustain a power of 10 kW. The primary proton beam is delivered by a high current Cyclotron accelerator, with energy 35-70 MeV and a beam current of 0.2-0.5 mA. Neutron-rich radioactive ions will be produced by proton induced Uranium fission in the UCx target at an expected fission rate in the order of 1013 fissions per second. The exotic isotopes will be re-accelerated by the ALPI superconducting LINAC at energies of 10A MeV and higher, for masses in the region A=130 amu at expected rate on the secondary target of 107 – 109 pps. The SPES project has the aim to provide high intensity and highquality beams of neutron-rich nuclei as well as to develop an interdisciplinary research center based on the cyclotron proton beam.
- 20 March 2014
- Published by EDP Sciences in EPJ Web of Conferences
- Vol. 66, 11030
Open AccessThe SPES project at the INFN- Laboratori Nazionali di Legnaro
The SPES Radioactive Ion Beam (RIB) facility at INFN-LNL is in the construction phase. It is based on the ISOL method with an UCx Direct Target able to sustain a power of 10 kW. The primary proton beam is delivered by a high current Cyclotron accelerator, with energy 35-70 MeV and a beam current of 0.2-0.5 mA. Neutron-rich radioactive ions will be produced by proton induced Uranium fission in the UCx target at an expected fission rate in the order of 1013 fissions per second. The exotic isotopes will be re-accelerated by the ALPI superconducting LINAC at energies of 10A MeV and higher, for masses in the region A=130 amu at expected rate on the secondary target of 107 – 109 pps. The SPES project has the aim to provide high intensity and highquality beams of neutron-rich nuclei as well as to develop an interdisciplinary research center based on the cyclotron proton beam.
- Open Access
- 20 March 2014
- Published by EDP Sciences in EPJ Web of Conferences
- Vol. 66, 11003
ALPI Setup as the SPES Accelerator of Exotic Beams
EPJ Web of Conferences, open-access proceedings in physics and related sciences
- 20 March 2014
- Published by EDP Sciences in EPJ Web of Conferences
- Vol. 66, 11003
Open AccessALPI Setup as the SPES Accelerator of Exotic Beams
EPJ Web of Conferences, open-access proceedings in physics and related sciences
- 1 January 2014
- Published by Jagiellonian University in Acta Physica Polonica B
- Vol. 45 (2)
SPES: the INFN Exotic Beam ISOL Facility at the LNL and Its First Day Scientific Program
- 1 January 2014
- Published by Jagiellonian University in Acta Physica Polonica B
- Vol. 45 (2)
SPES: the INFN Exotic Beam ISOL Facility at the LNL and Its First Day Scientific Program
- 1 January 2012
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 1491 (1) , 58-61
SPES: The INFN radioactive beam facility for nuclear physics
The SPES project at Laboratori di Legnaro of INFN (Italy) is concentrating on the production of neutron-rich radioactive nuclei for nuclear physics experiment, by the Uranium fission at a rate of 1013 fission/s. The emphasis to neutron-rich isotopes is justified by the fact that this vast territory has been little explored. The Radioactive Ion Beam (RIB) will be produced by ISOL technique using the proton induced fission on a Direct Target of UCx.
- 1 January 2012
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 1491 (1) , 58-61
SPES: The INFN radioactive beam facility for nuclear physics
The SPES project at Laboratori di Legnaro of INFN (Italy) is concentrating on the production of neutron-rich radioactive nuclei for nuclear physics experiment, by the Uranium fission at a rate of 1013 fission/s. The emphasis to neutron-rich isotopes is justified by the fact that this vast territory has been little explored. The Radioactive Ion Beam (RIB) will be produced by ISOL technique using the proton induced fission on a Direct Target of UCx.