Seyyed Mohammad Mirhosseini
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Seyyed Mohammad Mirhosseini has a total of 83 co-authors. Here are the top co-authors by number of shared publications:
Ehsanollah Zeighami
Department of Civil Engineering, Ar.C, Islamic Azad University, Arak, Iran
13 shared publications- Seyed Hamid Lajevardi
Department of Civil Engineering, Arak Branch, Islamic Azad University, Arak, Iran
5 shared publications - Hossein Rahami
School of Engineering Science, College of Engineering, University of Tehran, Tehran, Iran
4 shared publications - Ehsanollah Zeighami
Department of Civil Engineering, Arak Branch, Islamic Azad University, Arak, Iran
3 shared publications - Hamidreza Abbasianjahromi
Department of Civil Engineering, K. N. Toosi University of Technology, Tehran, Iran
3 shared publications Mohammad Ehsanifar
Department of Industrial Engineering, Ar.C, Islamic Azad University, Arak, Iran
3 shared publications
Latest Publications
- Open Access
- 1 December 2025
- Published by Elsevier in Results in Engineering
- Vol. 29
Investigating the role of chemically modified PET in enhancing the properties of green concrete with nano silica under freeze-thaw conditions
- 1 December 2025
- Published by Elsevier in Results in Engineering
- Vol. 29
Open AccessInvestigating the role of chemically modified PET in enhancing the properties of green concrete with nano silica under freeze-thaw conditions
- 25 July 2025
- Published by Springer Nature in Iranian Journal of Science and Technology, Transactions of Civil Engineering
- Vol. 50 (3) , 2579-2600
Presenting Analytical Relations and Numerical-Experimental Investigation of the Behavior of Tubular Damper in Compression and Tension Under the Effect of Uniform Loading
- 25 July 2025
- Published by Springer Nature in Iranian Journal of Science and Technology, Transactions of Civil Engineering
- Vol. 50 (3) , 2579-2600
Presenting Analytical Relations and Numerical-Experimental Investigation of the Behavior of Tubular Damper in Compression and Tension Under the Effect of Uniform Loading
- Open Access
- 6 January 2025
- Published by Universidad Estatal de Milagro (UNEMI) in CIENCIA UNEMI
- Vol. 18 (47) , 109-125
Risk management model in construction projects based on time and financial resources management
The successful completion of construction and industrial projects in the form of budget, time and quality and getting the satisfaction of the beneficiaries of the project is the ultimate goal of project management. The current research aimed to analyze the risk management model in construction projects with the approach of managing time and financial resources. In the qualitative part, firstly, by means of thematic analysis, by using interviews with experts, a theoretical framework and a conceptual model were developed, and its reliability and validity were determined by the Delphi method, and then, the structural model of risk management of construction projects with the approach of managing time and financial resources was determined. In management issues, there are things like "managers should have a written plan regarding the maintenance of human resources”, “at each stage of the work process, in order to optimally implement that process and also make businesses more profitable, managing the costs of that stage can be fruitful", "always during the process of implementing projects, issues and problems arise that require the ability of managers to solve those issues and make timely decisions in order to prevent multiple losses" showing the importance of management factors in construction projects.
- 6 January 2025
- Published by Universidad Estatal de Milagro (UNEMI) in CIENCIA UNEMI
- Vol. 18 (47) , 109-125
Open AccessRisk management model in construction projects based on time and financial resources management
The successful completion of construction and industrial projects in the form of budget, time and quality and getting the satisfaction of the beneficiaries of the project is the ultimate goal of project management. The current research aimed to analyze the risk management model in construction projects with the approach of managing time and financial resources. In the qualitative part, firstly, by means of thematic analysis, by using interviews with experts, a theoretical framework and a conceptual model were developed, and its reliability and validity were determined by the Delphi method, and then, the structural model of risk management of construction projects with the approach of managing time and financial resources was determined. In management issues, there are things like "managers should have a written plan regarding the maintenance of human resources”, “at each stage of the work process, in order to optimally implement that process and also make businesses more profitable, managing the costs of that stage can be fruitful", "always during the process of implementing projects, issues and problems arise that require the ability of managers to solve those issues and make timely decisions in order to prevent multiple losses" showing the importance of management factors in construction projects.
- Open Access
- 1 January 2025
- Published by International Digital Organization for Scientific Information (IDOSI) in International Journal of Engineering
- Vol. 38 (11) , 2697-2712
Developing a Hybrid Model for Predicting Financial Performance of Iranian Construction Companies Based on Genetic Algorithm and Adaptive Neuro-Fuzzy Inference System
Analyzing financial ratios over consecutive years is beneficial for evaluating the financial performance of construction companies. However, such an analysis can be tedious due to the vast number of the ratios. Therefore, developing an expert system based on artificial intelligence algorithms to identify and predict factors influencing the construction companies' financial performance is essential. To this end, a hybrid model based on Genetic Algorithm (GA) and Adaptive Neuro-Fuzzy Inference System (ANFIS) was introduced in this research to predict the financial performance of construction companies in Iran. This research is applied as descriptive and in terms of methodology well developed; also conducted cross-sectionally. The statistical population included all active construction companies in the construction sector in Tehran. Due to time and resource constraints, a random sampling technique was used. A questionnaire was utilized for data collection and data analysis, factor analysis methods and neuro-fuzzy system combined with GA were employed. The ANFIS combined with GA can evaluate the construction companies' financial performance with the minimum error. The findings ultimately resulted development of a model that forecasts the financial performance of Iranian construction companies, allowing them to concentrate on factors that improve financial performance.
- 1 January 2025
- Published by International Digital Organization for Scientific Information (IDOSI) in International Journal of Engineering
- Vol. 38 (11) , 2697-2712
Open AccessDeveloping a Hybrid Model for Predicting Financial Performance of Iranian Construction Companies Based on Genetic Algorithm and Adaptive Neuro-Fuzzy Inference System
Analyzing financial ratios over consecutive years is beneficial for evaluating the financial performance of construction companies. However, such an analysis can be tedious due to the vast number of the ratios. Therefore, developing an expert system based on artificial intelligence algorithms to identify and predict factors influencing the construction companies' financial performance is essential. To this end, a hybrid model based on Genetic Algorithm (GA) and Adaptive Neuro-Fuzzy Inference System (ANFIS) was introduced in this research to predict the financial performance of construction companies in Iran. This research is applied as descriptive and in terms of methodology well developed; also conducted cross-sectionally. The statistical population included all active construction companies in the construction sector in Tehran. Due to time and resource constraints, a random sampling technique was used. A questionnaire was utilized for data collection and data analysis, factor analysis methods and neuro-fuzzy system combined with GA were employed. The ANFIS combined with GA can evaluate the construction companies' financial performance with the minimum error. The findings ultimately resulted development of a model that forecasts the financial performance of Iranian construction companies, allowing them to concentrate on factors that improve financial performance.
- Open Access
- 1 January 2025
- Published by International Digital Organization for Scientific Information (IDOSI) in International Journal of Engineering
- Vol. 38 (4) , 945-963
A Combined Modeling Approach for Delay Management in Construction Projects Based on a Two-objective Mathematical Model and System Dynamics
Successful civil projects are one of the key factors in the economic development. Civil projects are always criticized for time and budget wastage. Delays in the execution of these projects sometimes not only waste national resources and cause social damages, but also may ultimately render the project economically unjustifiable, to the extent that the direct and indirect damages from delays can sometimes exceed the actual value of the project. However, despite all government efforts, projects in Iran still suffer from delays. Therefore, managing the delays in construction projects in Iran for optimal utilization and proper management is essential. This research proposes a delay management model for construction projects based on evaluating the effective factors on the delay of construction projects in Iran using system dynamics and optimization methods. Finally, a model suitable for the managerial situation in top-ranked contracting companies in Tehran province was presented. The validation and credibility assessment of the proposed model in managing the delay of construction projects in Iran indicated that, by combining these two approaches, project managers can improve project performance under dynamic system conditions. This innovation can be utilized in different industries, especially in the construction industry. In fact, this study provides an optimal response to the management of delays in construction projects by changing the planning horizon using integrated tracking methods and identifying the best strategy and planning horizon for policymakers. Through this, an optimal planning horizon for managing delays in construction projects in the real world is achieved.
- 1 January 2025
- Published by International Digital Organization for Scientific Information (IDOSI) in International Journal of Engineering
- Vol. 38 (4) , 945-963
Open AccessA Combined Modeling Approach for Delay Management in Construction Projects Based on a Two-objective Mathematical Model and System Dynamics
Successful civil projects are one of the key factors in the economic development. Civil projects are always criticized for time and budget wastage. Delays in the execution of these projects sometimes not only waste national resources and cause social damages, but also may ultimately render the project economically unjustifiable, to the extent that the direct and indirect damages from delays can sometimes exceed the actual value of the project. However, despite all government efforts, projects in Iran still suffer from delays. Therefore, managing the delays in construction projects in Iran for optimal utilization and proper management is essential. This research proposes a delay management model for construction projects based on evaluating the effective factors on the delay of construction projects in Iran using system dynamics and optimization methods. Finally, a model suitable for the managerial situation in top-ranked contracting companies in Tehran province was presented. The validation and credibility assessment of the proposed model in managing the delay of construction projects in Iran indicated that, by combining these two approaches, project managers can improve project performance under dynamic system conditions. This innovation can be utilized in different industries, especially in the construction industry. In fact, this study provides an optimal response to the management of delays in construction projects by changing the planning horizon using integrated tracking methods and identifying the best strategy and planning horizon for policymakers. Through this, an optimal planning horizon for managing delays in construction projects in the real world is achieved.
- Open Access
- 16 October 2024
- Published by Elsevier in Sustainable Futures
- Vol. 8
Providing a framework to optimize the sustainable construction material supply chain with the possibility of horizontal transfers
- 16 October 2024
- Published by Elsevier in Sustainable Futures
- Vol. 8
Open AccessProviding a framework to optimize the sustainable construction material supply chain with the possibility of horizontal transfers
- Open Access
- 21 September 2024
- Published by Elsevier in Results in Engineering
- Vol. 24
Effect of foundation stiffness on the fragility curves of a concrete gravity dam under far-field ground motions
- 21 September 2024
- Published by Elsevier in Results in Engineering
- Vol. 24
Open AccessEffect of foundation stiffness on the fragility curves of a concrete gravity dam under far-field ground motions
- Open Access
- 20 August 2024
- Published by Springer Nature in Applied Water Science
- Vol. 14 (9) , 1-16
Evaluating machine learning models in predicting dam inflow and hydroelectric power production in multi-purpose dams (case study: Mahabad Dam, Iran)
- 20 August 2024
- Published by Springer Nature in Applied Water Science
- Vol. 14 (9) , 1-16
Open AccessEvaluating machine learning models in predicting dam inflow and hydroelectric power production in multi-purpose dams (case study: Mahabad Dam, Iran)