Nataliia I. Dereviahina
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Nataliia I. Dereviahina has a total of 18 co-authors. Here are the top co-authors by number of shared publications:
- Oleksandr Inkin
Dnipro University of Technology
4 shared publications - Ivan Sadovenko
Dnipro University of Technology
3 shared publications - Oleksandr Skobenko
Dnipro University of Technology, Dnipro
2 shared publications - Volodymyr Shapoval
Dnipro University of Technology
2 shared publications - Anatolii S. Kobets
Дніпровський державний аграрно-економічний університет, м. Дніпро
1 shared publication - Andrii Puhach
Dnipro State Agrarian and Economic University
1 shared publication
Latest Publications
- Open Access
- 9 November 2026
- Published by Ukrainian State University of Science and Technologies in Bridges and tunnels: Theory, Research, Practice
- No. 30,p. 108-118
Algorithm to identify calculation dimensions for the ground foundation-underground and surface structures system
Purpose is to elaborate recommendations to identify horizontal dimensions for the calculation area of a ground foundation while defining a stress-strain state of the ground foundation-underground and surface structures system using a finite element method. Methodology. The research applied numerical approach to model a stress-strain state of the ground foundation-underground and surface structures system. To evaluate the impact by the calculation area dimensions, internal forces and displacements within the underground structure, foundation, and surface structure elements have been compared in terms of successive size increase. Differences between the results were assessed through relative and symmetrically relative mean-square errors. Findings. It has been defined that an increase in the calculation area dimensions up to the certain point results in the decrease of differences between the obtained internal forces and displacements. At the same time, further increase may stipulate their sharp growth and influence by the area dimensions is more essential for a base plate and underground structure, and less expressed for the surface structure columns. An algorithm has been proposed to determine the calculation area dimensions by means of their gradual increase and comparison of the related calculation results. A symmetric relative mean-square error value not exceeding 5% or its minimum value has been assumed as a sufficiency criterion. Originality. An approach has been developed to identify horizontal dimensions of the calculation area of ground foundations based upon a quantitative comparison of the changes in a stress-strain state of the system under successive increase in the area sizes. Practical value. The developed algorithm makes it possible to define reasonably dimensions of a calculation area of the foundation in the process of finite-element simulation of common action by ground foundation; and underground and surface structures.
- 9 November 2026
- Published by Ukrainian State University of Science and Technologies in Bridges and tunnels: Theory, Research, Practice
- No. 30,p. 108-118
Open AccessAlgorithm to identify calculation dimensions for the ground foundation-underground and surface structures system
Purpose is to elaborate recommendations to identify horizontal dimensions for the calculation area of a ground foundation while defining a stress-strain state of the ground foundation-underground and surface structures system using a finite element method. Methodology. The research applied numerical approach to model a stress-strain state of the ground foundation-underground and surface structures system. To evaluate the impact by the calculation area dimensions, internal forces and displacements within the underground structure, foundation, and surface structure elements have been compared in terms of successive size increase. Differences between the results were assessed through relative and symmetrically relative mean-square errors. Findings. It has been defined that an increase in the calculation area dimensions up to the certain point results in the decrease of differences between the obtained internal forces and displacements. At the same time, further increase may stipulate their sharp growth and influence by the area dimensions is more essential for a base plate and underground structure, and less expressed for the surface structure columns. An algorithm has been proposed to determine the calculation area dimensions by means of their gradual increase and comparison of the related calculation results. A symmetric relative mean-square error value not exceeding 5% or its minimum value has been assumed as a sufficiency criterion. Originality. An approach has been developed to identify horizontal dimensions of the calculation area of ground foundations based upon a quantitative comparison of the changes in a stress-strain state of the system under successive increase in the area sizes. Practical value. The developed algorithm makes it possible to define reasonably dimensions of a calculation area of the foundation in the process of finite-element simulation of common action by ground foundation; and underground and surface structures.
- Open Access
- 30 September 2026
- Published by Ukrainian State University of Science and Technologies in Science and Transport Progress
- No. 3(115),p. 219-231
Features of the Interaction Between Underground and Above-Ground Structures in Dense Urban Development
Purpose. To investigate the interaction between underground and above-ground structures in densely built urban areas and to assess the influence of their combined behaviour on the stress-strain state of structural elements in order to improve the reliability of engineering design solutions. Methodology. The study was based on finite element numerical modelling, which made it possible to analyse different configurations of the “foundation–underground structure–above-ground structure” system and to perform a comparative assessment of the stress-strain state of individual structural components. Comparative evaluation criteria were applied to determine the magnitude and nature of discrepancies between alternative modelling approaches. Findings. The results demonstrate that neglecting the mutual interaction between underground and above-ground structures leads to a significant distortion in the assessment of their stress-strain behaviour. The most pronounced changes were identified in foundation slabs, floor slabs, and underground structural elements, where considerable variations in stresses, internal forces, and deformations were observed. Based on the obtained results, engineering recommendations were developed concerning the consideration of structural interaction during design, including improvements in foundation stiffness, reinforcement of slab elements, and accounting for changes in bending moments within structural columns. Originality. The scientific novelty lies in the comprehensive assessment of the influence of underground–above-ground structural interaction on the stress-strain state through the comparison of alternative computational models and the identification of characteristic patterns in stress, internal force, and deformation redistribution depending on the adopted modelling scheme. Practical value. The proposed approach can be applied in the structural design of facilities located in densely developed urban environments to improve the accuracy of engineering calculations, optimise structural solutions, and enhance the operational safety and reliability of integrated underground and above-ground construction systems.
- 30 September 2026
- Published by Ukrainian State University of Science and Technologies in Science and Transport Progress
- No. 3(115),p. 219-231
Open AccessFeatures of the Interaction Between Underground and Above-Ground Structures in Dense Urban Development
Purpose. To investigate the interaction between underground and above-ground structures in densely built urban areas and to assess the influence of their combined behaviour on the stress-strain state of structural elements in order to improve the reliability of engineering design solutions. Methodology. The study was based on finite element numerical modelling, which made it possible to analyse different configurations of the “foundation–underground structure–above-ground structure” system and to perform a comparative assessment of the stress-strain state of individual structural components. Comparative evaluation criteria were applied to determine the magnitude and nature of discrepancies between alternative modelling approaches. Findings. The results demonstrate that neglecting the mutual interaction between underground and above-ground structures leads to a significant distortion in the assessment of their stress-strain behaviour. The most pronounced changes were identified in foundation slabs, floor slabs, and underground structural elements, where considerable variations in stresses, internal forces, and deformations were observed. Based on the obtained results, engineering recommendations were developed concerning the consideration of structural interaction during design, including improvements in foundation stiffness, reinforcement of slab elements, and accounting for changes in bending moments within structural columns. Originality. The scientific novelty lies in the comprehensive assessment of the influence of underground–above-ground structural interaction on the stress-strain state through the comparison of alternative computational models and the identification of characteristic patterns in stress, internal force, and deformation redistribution depending on the adopted modelling scheme. Practical value. The proposed approach can be applied in the structural design of facilities located in densely developed urban environments to improve the accuracy of engineering calculations, optimise structural solutions, and enhance the operational safety and reliability of integrated underground and above-ground construction systems.
- Open Access
- 15 July 2025
- Published by Institute of Geological Sciences of the National Academy of Sciences of Ukraine in Geological Journal
- No. 2,p. 45-55
ENGINEERING-GEOLOGICAL TYPIFICATION AS A BASIS FOR ASSESSMENT AND FORECAST OF RISKS IN THE DEVELOPMENT OF UNDERGROUND SPACE IN CITIES USING THE EXAMPLE OF THE DNIPRO CITY
The development of cities is accompanied by an increase in the height and density of buildings, the development of underground space, which leads to the need to update the methods and technologies for engineering and geological surveys. Existing regulatory documents regulate the methods and technologies for studying near-surface geological formations, mainly of Quaternary age. The development of underground space leads to the need to study mainly pre-Quaternary sediments as a medium for the placement and construction of engineering structures for various purposes: from residential buildings to defense facilities. Information on the engineering and geological properties, structure, condition and variability of pre-Quaternary sediments is scarce. The cities concentrated in the Dnipro River Valley are characterized by general patterns of geological structure due to the history of the region's development. In this paper, on the example of Dnipro city, the information on some aspects of regional engineering and geological conditions is generalized on the basis of generalization of information on the conditions of occurrence and properties of the most common geological horizons that are the environment of geological risk. The stratigraphic division of sediments and their indexing are presented in accordance with the legends to the map schemes of the used reports. The goal is to establish the general features of typification of engineering and geological conditions for the development of long-term plans for the development of underground space in urban areas in similar or similar conditions. The objectives were to substantiate the factors of the engineering and geological conditions of the research object; to analyze the study of the composition and properties of certain horizons that are or may be subject to technogenic impact during the construction of multi-storey residential or other structures, the zone of influence of which is located within the Quaternary sediments; to determine the relationship between undesirable engineering and geological processes and phenomena and the composition and properties of geological formations based on known data. The solution to this problem is relevant and will contribute to the sustainable development of cities.
- 15 July 2025
- Published by Institute of Geological Sciences of the National Academy of Sciences of Ukraine in Geological Journal
- No. 2,p. 45-55
Open AccessENGINEERING-GEOLOGICAL TYPIFICATION AS A BASIS FOR ASSESSMENT AND FORECAST OF RISKS IN THE DEVELOPMENT OF UNDERGROUND SPACE IN CITIES USING THE EXAMPLE OF THE DNIPRO CITY
The development of cities is accompanied by an increase in the height and density of buildings, the development of underground space, which leads to the need to update the methods and technologies for engineering and geological surveys. Existing regulatory documents regulate the methods and technologies for studying near-surface geological formations, mainly of Quaternary age. The development of underground space leads to the need to study mainly pre-Quaternary sediments as a medium for the placement and construction of engineering structures for various purposes: from residential buildings to defense facilities. Information on the engineering and geological properties, structure, condition and variability of pre-Quaternary sediments is scarce. The cities concentrated in the Dnipro River Valley are characterized by general patterns of geological structure due to the history of the region's development. In this paper, on the example of Dnipro city, the information on some aspects of regional engineering and geological conditions is generalized on the basis of generalization of information on the conditions of occurrence and properties of the most common geological horizons that are the environment of geological risk. The stratigraphic division of sediments and their indexing are presented in accordance with the legends to the map schemes of the used reports. The goal is to establish the general features of typification of engineering and geological conditions for the development of long-term plans for the development of underground space in urban areas in similar or similar conditions. The objectives were to substantiate the factors of the engineering and geological conditions of the research object; to analyze the study of the composition and properties of certain horizons that are or may be subject to technogenic impact during the construction of multi-storey residential or other structures, the zone of influence of which is located within the Quaternary sediments; to determine the relationship between undesirable engineering and geological processes and phenomena and the composition and properties of geological formations based on known data. The solution to this problem is relevant and will contribute to the sustainable development of cities.
- Open Access
- 1 July 2023
- Published by Polish Mineral Engineering Society in Inżynieria Mineralna
- Vol. 1 (1) , 97–102
Simulating Filtration to Evaluate Hydrodynamic Indices of the Underground Gas Storage Operation
The research objective is to develop and test mathematical model of gas storage in the layered aquifer with poorly permeable interlayer if plane-parallel and axisymmetric filtration takes place. The paper evaluates the gas-hydrodynamic operational indices of the underground gas storages within aquifers in the South East Ukraine. Comprehensive approach has been applied involving collection, systematization, and analysis of actual data on filtration and physicomechanical properties of enclosing rocks impacting formation of natural and technogenic deposits as well as analytical and numerical methods to solve equations of the gas-water contact shift under different conditions. A gas-hydrodynamic model of underground gas storage within the nonuniform aquifer has been substantiated to calculate its cyclic operation in the three-layered seam taking into consideration crossflows through a poorly permeable stopping. The calculation results show significant impact of characteristics of the layered porous environment on the gas water contact transfer through certain seams. The derived new technique linearizing a system of differential equations to identify pressure within a reservoir is generalization of the earlier applied procedures with introduction of ‘boundary schemes’. The calculation results demonstrate significant impact of the layered porous environment on the gas water contact transfer through certain seams. The findings may be applied while making evaluations at the stage of gas storage design within aquifers.
- 1 July 2023
- Published by Polish Mineral Engineering Society in Inżynieria Mineralna
- Vol. 1 (1) , 97–102
Open AccessSimulating Filtration to Evaluate Hydrodynamic Indices of the Underground Gas Storage Operation
The research objective is to develop and test mathematical model of gas storage in the layered aquifer with poorly permeable interlayer if plane-parallel and axisymmetric filtration takes place. The paper evaluates the gas-hydrodynamic operational indices of the underground gas storages within aquifers in the South East Ukraine. Comprehensive approach has been applied involving collection, systematization, and analysis of actual data on filtration and physicomechanical properties of enclosing rocks impacting formation of natural and technogenic deposits as well as analytical and numerical methods to solve equations of the gas-water contact shift under different conditions. A gas-hydrodynamic model of underground gas storage within the nonuniform aquifer has been substantiated to calculate its cyclic operation in the three-layered seam taking into consideration crossflows through a poorly permeable stopping. The calculation results show significant impact of characteristics of the layered porous environment on the gas water contact transfer through certain seams. The derived new technique linearizing a system of differential equations to identify pressure within a reservoir is generalization of the earlier applied procedures with introduction of ‘boundary schemes’. The calculation results demonstrate significant impact of the layered porous environment on the gas water contact transfer through certain seams. The findings may be applied while making evaluations at the stage of gas storage design within aquifers.
- 16 June 2023
- Published by Springer Nature
- p. 193-204
Evaluating Hydrodynamic Indices of the Underground Gas Storage Operation Based upon a Two-Phase Filtration Model
- 16 June 2023
- Published by Springer Nature
- p. 193-204
Evaluating Hydrodynamic Indices of the Underground Gas Storage Operation Based upon a Two-Phase Filtration Model
- 30 August 2022
- Published by Dnipro University of Technology in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
- No. 4,p. 84-90
Ecological estimation of installing geothermal systems on territories of closed coal mines
Purpose. To conduct an ecological estimation of calorific value for two alternative energy sources: traditional coal combustion and heat recovery from geothermal modules. Methodology. The methods of comparative analysis for environmental impact of energy production due to coal use in comparison with the alternative of using geothermal modules and heat pumps are used. The technique for gross emissions estimation from coal combustion processes for the conditions of Donbas mines and equivalent volumes of potential energy from heat pumps is applied. Findings. The ecological estimation of geothermal modules as alternative sources of thermal power on a territory of liquidated mines of Donbas is performed. A comparative estimation of the potential for thermal energy production by coal combustion and using geothermal modules is performed based on the analysis of average characteristics of coal in the Donetsk basin, as well as a calorific value of fuel. The parameters necessary for technical and economic estimation of the efficiency of implementing geothermal modules for providing alternative heat supply are calculated. Originality. For the first time, a comparative estimation of the potential for thermal energy production by coal combustion and using geothermal modules has been performed based on analysis of average coal characteristics in the Donetsk basin, as well as a calorific value of fuel. Equivalent mass of coal, which can be preserved due to the operation of geothermal modules for conditions of liquidated mines of Donbas and mines of Selydove group, is calculated according to the values of additionally obtained thermal power of geothermal modules Pth. Practical value. According to the calculations, the amount of geothermal power Uth from mine water in terms of equivalent mass of coal during the heating season is estimated as 7.63 1061.76 108MJ for open geothermal systems based on mine water discharge in Donbas; 0.49 1060.57106MJ for modules of geothermal circulation of Selydove group of mines. It is proven that the implementation of geothermal modules for thermal energy production in operating and closed coal mines is a promising environmentally friendly technology with long-term technological potential, economic and social benefits.
- 30 August 2022
- Published by Dnipro University of Technology in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
- No. 4,p. 84-90
Ecological estimation of installing geothermal systems on territories of closed coal mines
Purpose. To conduct an ecological estimation of calorific value for two alternative energy sources: traditional coal combustion and heat recovery from geothermal modules. Methodology. The methods of comparative analysis for environmental impact of energy production due to coal use in comparison with the alternative of using geothermal modules and heat pumps are used. The technique for gross emissions estimation from coal combustion processes for the conditions of Donbas mines and equivalent volumes of potential energy from heat pumps is applied. Findings. The ecological estimation of geothermal modules as alternative sources of thermal power on a territory of liquidated mines of Donbas is performed. A comparative estimation of the potential for thermal energy production by coal combustion and using geothermal modules is performed based on the analysis of average characteristics of coal in the Donetsk basin, as well as a calorific value of fuel. The parameters necessary for technical and economic estimation of the efficiency of implementing geothermal modules for providing alternative heat supply are calculated. Originality. For the first time, a comparative estimation of the potential for thermal energy production by coal combustion and using geothermal modules has been performed based on analysis of average coal characteristics in the Donetsk basin, as well as a calorific value of fuel. Equivalent mass of coal, which can be preserved due to the operation of geothermal modules for conditions of liquidated mines of Donbas and mines of Selydove group, is calculated according to the values of additionally obtained thermal power of geothermal modules Pth. Practical value. According to the calculations, the amount of geothermal power Uth from mine water in terms of equivalent mass of coal during the heating season is estimated as 7.63 1061.76 108MJ for open geothermal systems based on mine water discharge in Donbas; 0.49 1060.57106MJ for modules of geothermal circulation of Selydove group of mines. It is proven that the implementation of geothermal modules for thermal energy production in operating and closed coal mines is a promising environmentally friendly technology with long-term technological potential, economic and social benefits.
- Open Access
- 10 October 2020
- Published by Oles Honchar Dnipropetrovsk National University in Journal of Geology, Geography and Geoecology
- Vol. 29 (3) , 530-538
Geotechnological Foundations of Mining Natural-Technogenic Deposits in Donbas
The purpose of this study is to substantiate theoretically and technologically both parameters, formation and recovery schemes to use natural-technogenic and capacity resources of the mined coal deposits with the help of a set of geo-modules providing their activation, extraction, and storage depending on seasonable irregularity of energy consumption. Methods. Complex approach has been applied to achieve the purpose. The approach involves collection, systematization, and analysis of actual data concerning filtration as well as physical and mechanical characteristics of enclosing rocks, and seam mining conditions effecting formation of natural and technogenic deposits in addition to analytical and numerical methods to solve hydrogasodynamic, heat and mass transfer equations. The models reflect thermodynamic processes of a geocirculating system performance providing both heating and conditioning of industrial facilities and civic buildings since it accumulates summer heat and winter cold within the disturbed aquifers. Numerical modeling has been applied to simulate formation dynamics and a pattern of heat resource within an aquifer located over the coal seam being burnt depending on its inclination angle, coal mining stage, and aquifuge thickness. Originality. Spatial nonstationary model of heat transfer, simulating filtration direction, velocity of underground water and its temperature while carrier pumping and extracting from an aquifer for heat and cold supply of buildings according to ambient temperature has been developed and tested. Heat transfer mechanism within the flooded rock massif in an abandoned mine, followed by periodical injection and extraction of mine water from different levels, and its heating with the help of natural geothermal heat as well as underground burning of residual coal reserves has been analyzed. Practical implications. Operation parameters of a geotechnological module for reuse of thermal resource of the flooded mine workings while extracting and injecting water from different levels for heat and cold supply of buildings have been substantiated. It has been proved (in terms of the “Novohrodivska 2” mine being during liquidation) that the thermal flow, which is formed while coal burning and heated water pumping, is quite sufficient to meet calorific requirements of a town with 15 thousand inhabitants.
- 10 October 2020
- Published by Oles Honchar Dnipropetrovsk National University in Journal of Geology, Geography and Geoecology
- Vol. 29 (3) , 530-538
Open AccessGeotechnological Foundations of Mining Natural-Technogenic Deposits in Donbas
The purpose of this study is to substantiate theoretically and technologically both parameters, formation and recovery schemes to use natural-technogenic and capacity resources of the mined coal deposits with the help of a set of geo-modules providing their activation, extraction, and storage depending on seasonable irregularity of energy consumption. Methods. Complex approach has been applied to achieve the purpose. The approach involves collection, systematization, and analysis of actual data concerning filtration as well as physical and mechanical characteristics of enclosing rocks, and seam mining conditions effecting formation of natural and technogenic deposits in addition to analytical and numerical methods to solve hydrogasodynamic, heat and mass transfer equations. The models reflect thermodynamic processes of a geocirculating system performance providing both heating and conditioning of industrial facilities and civic buildings since it accumulates summer heat and winter cold within the disturbed aquifers. Numerical modeling has been applied to simulate formation dynamics and a pattern of heat resource within an aquifer located over the coal seam being burnt depending on its inclination angle, coal mining stage, and aquifuge thickness. Originality. Spatial nonstationary model of heat transfer, simulating filtration direction, velocity of underground water and its temperature while carrier pumping and extracting from an aquifer for heat and cold supply of buildings according to ambient temperature has been developed and tested. Heat transfer mechanism within the flooded rock massif in an abandoned mine, followed by periodical injection and extraction of mine water from different levels, and its heating with the help of natural geothermal heat as well as underground burning of residual coal reserves has been analyzed. Practical implications. Operation parameters of a geotechnological module for reuse of thermal resource of the flooded mine workings while extracting and injecting water from different levels for heat and cold supply of buildings have been substantiated. It has been proved (in terms of the “Novohrodivska 2” mine being during liquidation) that the thermal flow, which is formed while coal burning and heated water pumping, is quite sufficient to meet calorific requirements of a town with 15 thousand inhabitants.
- Open Access
- 2 October 2020
- Published by DKS Center in Інвестиції: практика та досвід
- No. 17-18,p. 111
MEANS OF PUBLIC ADMINISTRATION OF ENVIRONMENTAL PROTECTION IN UKRAINE
- 2 October 2020
- Published by DKS Center in Інвестиції: практика та досвід
- No. 17-18,p. 111
Open AccessMEANS OF PUBLIC ADMINISTRATION OF ENVIRONMENTAL PROTECTION IN UKRAINE
- Open Access
- 22 October 2019
- Published by EDP Sciences in E3S Web of Conferences
- Vol. 123, 01046
Actualization of prospects of thermal usage of groundwater of mines during liquidation
The aim of the paper is justification of the economically efficient technological scheme for development of a thermal resource of “Stashkov” mine after its closure, ensuring the maintenance of a favorable energy and ecological-hydrogeological regime in the region. A geotechnological scheme of environmentally safe usage of mine water was justified, involving water pumping up to the surface, heat removal and water reverse pumping into the seams. The suggested circulation system is characterized by an increased energy balance, since it is used to extract almost all the groundwater heat, as well as part of the heat of host rocks. In order to estimate the effectiveness of usage of this technology, calculations of usage of mine water as a source of low-potential energy in heat pumps in comparison with other alternatives (groundwater and surface water streams) using Mathcad software were performed, and it was established that this gives great conversion coefficients of mine water. A geotechnological scheme of usage of mine water was developed, which considers heat transfer, filtration direction, velocity and temperature of groundwater during pumping and removal of heat-transfer fluid from an aquifer for heating and cooling of buildings. The mechanism of heat removal in a flooded rock massif of amine during liquidation was studied with justification of environmentally safe usage of mine water.
- 22 October 2019
- Published by EDP Sciences in E3S Web of Conferences
- Vol. 123, 01046
Open AccessActualization of prospects of thermal usage of groundwater of mines during liquidation
The aim of the paper is justification of the economically efficient technological scheme for development of a thermal resource of “Stashkov” mine after its closure, ensuring the maintenance of a favorable energy and ecological-hydrogeological regime in the region. A geotechnological scheme of environmentally safe usage of mine water was justified, involving water pumping up to the surface, heat removal and water reverse pumping into the seams. The suggested circulation system is characterized by an increased energy balance, since it is used to extract almost all the groundwater heat, as well as part of the heat of host rocks. In order to estimate the effectiveness of usage of this technology, calculations of usage of mine water as a source of low-potential energy in heat pumps in comparison with other alternatives (groundwater and surface water streams) using Mathcad software were performed, and it was established that this gives great conversion coefficients of mine water. A geotechnological scheme of usage of mine water was developed, which considers heat transfer, filtration direction, velocity and temperature of groundwater during pumping and removal of heat-transfer fluid from an aquifer for heating and cooling of buildings. The mechanism of heat removal in a flooded rock massif of amine during liquidation was studied with justification of environmentally safe usage of mine water.
- Open Access
- 21 April 2019
- Published by Oles Honchar Dnipropetrovsk National University in Journal of Geology, Geography and Geoecology
- Vol. 28 (1) , 173-179
Investigation of hydrogeomechanical parameters of loess massifs in conditions of technogenic underflooding and development of technical recommendations for strengthening of bases of foundations
Based on the analysis of actual data and the results of numerical modeling, dependencies of deformations of the investigated residential complex due to technogenic moistening of a loess massif of soils are investigated. It was established that a dynamics of subsidence of bench marks in time is closely correlated with a moistening mode. In order to form a picture of dynamics of development of moistening phases of the massif and a quantitative estimation of main factors of their formation, a numerical model of the loess massif was built, based on the finite element approximation of the section of built-up area of the residential complex. Stability of a soil massif was estimated by the character of development of plastic deformation zones. Analysis of a stress-strain state of a rock massif indicated that water-saturated soils are partially in a state of plastic flow in a base. The development of shear deformations is most characteristic within a zone of the main moistening, as well as a boundary of its front. Development of rupture disturbances at the edge of the contour of buildings corresponds with the formation of tear cracks. An intensification of subsidence of buildings with simultaneous frontal and subvertical technogenic moistening of loess soils can be noted. Model estimations of a stress-strain state of the pile foundation, considering the uneven subsidence that occurred along the perimeter of residential buildings, show that the elastic mode of their deformation has not been exhausted. Options of redistribution of loads from residential sections onto an additional pile field, regulated base moistening and grouting of soils are considered as engineering measures to prevent further deformation of the residential complex. Stabilization of a soil base by means of high-pressure cementation is the most acceptable in the present conditions. Technological scheme of cementation of the soil base is recommended, as well as measures after the base stabilization, such as monitoring of further deformations of the complex itself and parking structures, and possibilities of constructing auxiliary drainage.
- 21 April 2019
- Published by Oles Honchar Dnipropetrovsk National University in Journal of Geology, Geography and Geoecology
- Vol. 28 (1) , 173-179
Open AccessInvestigation of hydrogeomechanical parameters of loess massifs in conditions of technogenic underflooding and development of technical recommendations for strengthening of bases of foundations
Based on the analysis of actual data and the results of numerical modeling, dependencies of deformations of the investigated residential complex due to technogenic moistening of a loess massif of soils are investigated. It was established that a dynamics of subsidence of bench marks in time is closely correlated with a moistening mode. In order to form a picture of dynamics of development of moistening phases of the massif and a quantitative estimation of main factors of their formation, a numerical model of the loess massif was built, based on the finite element approximation of the section of built-up area of the residential complex. Stability of a soil massif was estimated by the character of development of plastic deformation zones. Analysis of a stress-strain state of a rock massif indicated that water-saturated soils are partially in a state of plastic flow in a base. The development of shear deformations is most characteristic within a zone of the main moistening, as well as a boundary of its front. Development of rupture disturbances at the edge of the contour of buildings corresponds with the formation of tear cracks. An intensification of subsidence of buildings with simultaneous frontal and subvertical technogenic moistening of loess soils can be noted. Model estimations of a stress-strain state of the pile foundation, considering the uneven subsidence that occurred along the perimeter of residential buildings, show that the elastic mode of their deformation has not been exhausted. Options of redistribution of loads from residential sections onto an additional pile field, regulated base moistening and grouting of soils are considered as engineering measures to prevent further deformation of the residential complex. Stabilization of a soil base by means of high-pressure cementation is the most acceptable in the present conditions. Technological scheme of cementation of the soil base is recommended, as well as measures after the base stabilization, such as monitoring of further deformations of the complex itself and parking structures, and possibilities of constructing auxiliary drainage.