Kailash Changdeorao Bhosale
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Kailash Changdeorao Bhosale has a total of 3 co-authors. Here are the top co-authors by number of shared publications:
- Padmakar Jagannath Pawar
Department of Production Engineering, K. K. Wagh Institute of Engineering Education and Research, Nashik, Savitribai Phule Pune University, Pune, India
4 shared publications P. J. Pawar
K. K. Wagh Institute of Engineering Education and Research, Nashik, Savitribai Phule Pune University
2 shared publicationsPadmakar Jagannath Pawar
Department of Production Engineering, K. K. Wagh Institute of Engineering Education and Research, Nasik. Savitribai Phule Pune University, Pune, Maharashtra. India
1 shared publication
Latest Publications
- 21 February 2025
- Published by Springer Nature in International Journal on Interactive Design and Manufacturing (IJIDeM)
- Vol. 19 (9) , 6707-6724
Investigations into effect of waiting time in integrated machine scheduling and automated guided vehicles scheduling
- 21 February 2025
- Published by Springer Nature in International Journal on Interactive Design and Manufacturing (IJIDeM)
- Vol. 19 (9) , 6707-6724
Investigations into effect of waiting time in integrated machine scheduling and automated guided vehicles scheduling
- 15 October 2024
- Published by Springer Nature
- p. 161-172
Material Flow Optimization of a Machine Loading Problem
- 15 October 2024
- Published by Springer Nature
- p. 161-172
Material Flow Optimization of a Machine Loading Problem
- Open Access
- 3 August 2022
- Published by Springer Nature in Research Square
Material Flow Optimisation of Multistage, Multiproduct Parallel Lines
In the production planning phase, long-term decision problems are addressed. In this phase, the demand of the products is fulfilled by considering the production capacity, available time and available manpower. The demand of the products is determined by Monte-Carlo simulation method. The objective function is considered to minimise material flow time. A case study based on soap finishing line which is related to multistage, multiproduct parallel line is selected. The mathematical model is formulated as mixed integer nonlinear programming. The CPLEX optimisation solver is used to find the optimum solution.
- 3 August 2022
- Published by Springer Nature in Research Square
Open AccessMaterial Flow Optimisation of Multistage, Multiproduct Parallel Lines
In the production planning phase, long-term decision problems are addressed. In this phase, the demand of the products is fulfilled by considering the production capacity, available time and available manpower. The demand of the products is determined by Monte-Carlo simulation method. The objective function is considered to minimise material flow time. A case study based on soap finishing line which is related to multistage, multiproduct parallel line is selected. The mathematical model is formulated as mixed integer nonlinear programming. The CPLEX optimisation solver is used to find the optimum solution.
- 8 February 2022
- Published by Springer Nature in Process Integration and Optimization for Sustainability
- Vol. 6 (2) , 409-430
Flexible Job Shop Scheduling for Press Working Industries with Operation Precedence Constraint
- 8 February 2022
- Published by Springer Nature in Process Integration and Optimization for Sustainability
- Vol. 6 (2) , 409-430
Flexible Job Shop Scheduling for Press Working Industries with Operation Precedence Constraint
- Open Access
- 14 July 2020
- Published by Oxford University Press (OUP) in Journal of Computational Design and Engineering
- Vol. 7 (6) , 761-774
Production planning and scheduling problem of continuous parallel lines with demand uncertainty and different production capacities
Production planning and scheduling problems are highly interdependent as scheduling provides optimum allocation of resources and planning is an optimum utilization of these allocated resources to serve multiple customers. Researchers have solved production planning and scheduling problems by the sequential method. But, in this case, the solution obtained by the production planning problem may not be feasible for scheduling method. Hence, production planning and scheduling problems must be solved simultaneously. Therefore, in this work, a mathematical model is developed to integrate production planning and scheduling problems. The solution to this integrated planning and scheduling problem is attempted by using a discrete artificial bee colony (DABC) algorithm. To speed up the DABC algorithm, a k-means clustering algorithm is used in the initial population generation phase. This k-means clustering algorithm will help to converge the algorithm in lesser time. A real-life case study of a soap manufacturing industry is presented to demonstrate the effectiveness of the proposed approach. An objective function to minimize overall cost, which comprises the processing cost, material cost, utility cost, and changeover cost, is considered. The results obtained by using DABC algorithm are compared with those obtained by CPLEX software. There is a saving of ₹2 23 324 for weeks 1–4 in overall cost compared with the results obtained by using CPLEX software.
- 14 July 2020
- Published by Oxford University Press (OUP) in Journal of Computational Design and Engineering
- Vol. 7 (6) , 761-774
Open AccessProduction planning and scheduling problem of continuous parallel lines with demand uncertainty and different production capacities
Production planning and scheduling problems are highly interdependent as scheduling provides optimum allocation of resources and planning is an optimum utilization of these allocated resources to serve multiple customers. Researchers have solved production planning and scheduling problems by the sequential method. But, in this case, the solution obtained by the production planning problem may not be feasible for scheduling method. Hence, production planning and scheduling problems must be solved simultaneously. Therefore, in this work, a mathematical model is developed to integrate production planning and scheduling problems. The solution to this integrated planning and scheduling problem is attempted by using a discrete artificial bee colony (DABC) algorithm. To speed up the DABC algorithm, a k-means clustering algorithm is used in the initial population generation phase. This k-means clustering algorithm will help to converge the algorithm in lesser time. A real-life case study of a soap manufacturing industry is presented to demonstrate the effectiveness of the proposed approach. An objective function to minimize overall cost, which comprises the processing cost, material cost, utility cost, and changeover cost, is considered. The results obtained by using DABC algorithm are compared with those obtained by CPLEX software. There is a saving of ₹2 23 324 for weeks 1–4 in overall cost compared with the results obtained by using CPLEX software.
- 10 July 2019
- Published by Springer Nature in Advances in Intelligent Systems and Computing
- p. 679-687
Integrated Production Planning and Scheduling for Parallel Production Lines
- 10 July 2019
- Published by Springer Nature in Advances in Intelligent Systems and Computing
- p. 679-687
Integrated Production Planning and Scheduling for Parallel Production Lines
- 17 March 2018
- Published by Springer Nature in Flexible Services and Manufacturing Journal
- Vol. 31 (2) , 381-423
Material flow optimisation of production planning and scheduling problem in flexible manufacturing system by real coded genetic algorithm (RCGA)
- 17 March 2018
- Published by Springer Nature in Flexible Services and Manufacturing Journal
- Vol. 31 (2) , 381-423
Material flow optimisation of production planning and scheduling problem in flexible manufacturing system by real coded genetic algorithm (RCGA)
- 1 January 2018
- Published by Elsevier in Materials Today: Proceedings
- Vol. 5 (2) , 7160-7167
Material Flow Optimisation of Flexible Manufacturing System using Real Coded Genetic Algorithm (RCGA)
- 1 January 2018
- Published by Elsevier in Materials Today: Proceedings
- Vol. 5 (2) , 7160-7167
Material Flow Optimisation of Flexible Manufacturing System using Real Coded Genetic Algorithm (RCGA)