Mikolaj Bednarski
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Mikolaj Bednarski has a total of 51 co-authors. Here are the top co-authors by number of shared publications:
- Pawel Stoch
Faculty of Materials Science and Ceramics, AGH University of Krakow, Al. Mickiewicza 30, 30-059 Krakow, Poland
5 shared publications J. Chmist
3 shared publications- Damian Wojas
Division of Scientific Equipment, Infrastructure Construction, Institute of Nuclear Physics Polish Academy of Sciences, Krakow, Poland
2 shared publications Giorgio D'ANgelo
CERN, Geneva, Switzerland
2 shared publicationsJ Suwalski
2 shared publicationsJ. Pszczoła
2 shared publications
Latest Publications
- 8 April 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 32 (5) , 1-7
Characterization of the Copper Resistance in the LHC Main Dipole Bypass Diode Leads
A fundamental component of the quench protection system of the large hadron collider (LHC) superconducting dipole magnets are bypass diodes. During a quench, the high current powering the magnet coil is redirected through the parallel diode. The resistance of diode current lead contacts is essential due to the risk of overheat. There is no possibility to measure their resistances, as the superconducting magnet coil acts as a short-circuit. Those measurements are possible when the magnet is in the resistive state. The most important point is the contact surface between the magnet busbar and the diode current lead. The resistance of this contact is not possible to measure when the cryostat is closed, so an indirect method that includes the resistance of the copper parts has to be developed. This article describes the methodology of measurements and calculations and summarizes the results of the resistance measurements of copper current leads of the LHC dipole bypass diodes. The measurements have been performed in a wide temperature region, to reproduce different environmental parameters of the LHC. It was proven that the temperature of measured samples has a significant influence on obtained results and a systematic approach is essential. Precise values of the resistance parameters have been obtained and will be used in the future measurements of the quality of connection of those diodes and, in consequence, will be used in the quality assurance of the quench protection system.
- 8 April 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 32 (5) , 1-7
Characterization of the Copper Resistance in the LHC Main Dipole Bypass Diode Leads
A fundamental component of the quench protection system of the large hadron collider (LHC) superconducting dipole magnets are bypass diodes. During a quench, the high current powering the magnet coil is redirected through the parallel diode. The resistance of diode current lead contacts is essential due to the risk of overheat. There is no possibility to measure their resistances, as the superconducting magnet coil acts as a short-circuit. Those measurements are possible when the magnet is in the resistive state. The most important point is the contact surface between the magnet busbar and the diode current lead. The resistance of this contact is not possible to measure when the cryostat is closed, so an indirect method that includes the resistance of the copper parts has to be developed. This article describes the methodology of measurements and calculations and summarizes the results of the resistance measurements of copper current leads of the LHC dipole bypass diodes. The measurements have been performed in a wide temperature region, to reproduce different environmental parameters of the LHC. It was proven that the temperature of measured samples has a significant influence on obtained results and a systematic approach is essential. Precise values of the resistance parameters have been obtained and will be used in the future measurements of the quality of connection of those diodes and, in consequence, will be used in the quality assurance of the quench protection system.
- Open Access
- 17 March 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 31 (5) , 1-4
Preparation and Execution of the Electrical Quality Assurance Program On the LHC Superconducting Circuits During the Second Long Shutdown
The electrical quality assurance (ELQA) of the superconducting circuits of CERN's Large Hadron Collider (LHC) during its second Long Shutdown (LS2) requires the execution of vast measurement campaigns. Each of 1658 electrical circuits as well as the instrumentation of each of the 1746 individual cryo-assemblies housing magnets, bus-bars and other components of the superconducting circuits, has to undergo a series of tests. At the beginning of the shutdown the tests are performed before and after the warm-up from cryogenic temperatures. The same tests are repeated at the end of the shutdown, this time before and after the cool-down. As part of the dipole bypass diode insulation consolidation project and due to the replacement of a few non-conform magnets, additional electrical tests and measurements had to be performed throughout the shutdown period. With each measurement, electrical parameters like resistance, complex impedance, and the quality of the insulation are verified and stored for future reference. Due to the many thousands of measurements to be performed, multiple automated mobile test benches had to be developed for the different test types along with dedicated database and analysis software applications for the documentation and follow-up of the test results and the non-conformities observed.
- 17 March 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 31 (5) , 1-4
Open AccessPreparation and Execution of the Electrical Quality Assurance Program On the LHC Superconducting Circuits During the Second Long Shutdown
The electrical quality assurance (ELQA) of the superconducting circuits of CERN's Large Hadron Collider (LHC) during its second Long Shutdown (LS2) requires the execution of vast measurement campaigns. Each of 1658 electrical circuits as well as the instrumentation of each of the 1746 individual cryo-assemblies housing magnets, bus-bars and other components of the superconducting circuits, has to undergo a series of tests. At the beginning of the shutdown the tests are performed before and after the warm-up from cryogenic temperatures. The same tests are repeated at the end of the shutdown, this time before and after the cool-down. As part of the dipole bypass diode insulation consolidation project and due to the replacement of a few non-conform magnets, additional electrical tests and measurements had to be performed throughout the shutdown period. With each measurement, electrical parameters like resistance, complex impedance, and the quality of the insulation are verified and stored for future reference. Due to the many thousands of measurements to be performed, multiple automated mobile test benches had to be developed for the different test types along with dedicated database and analysis software applications for the documentation and follow-up of the test results and the non-conformities observed.
- Open Access
- 28 February 2017
- Published by IOP Publishing in IOP Conference Series: Materials Science and Engineering
- Vol. 171 (1) , 012099
XFEL AMTF operation completed: results and lessons learned
In order to produce short pulsed electron beam of 17.5 GeV energy, the XFEL linear accelerator is being built at DESY in Hamburg. Before being installed in the accelerator tunnel, 103 accelerator modules have to be tested in Accelerator Module Test Facility (AMTF). Cavities and cryomodules are tested at two vertical cryostats and three horizontal test benches. Two valve boxes and a liquid helium (LHe) storage tank are installed to enable cryogenic operation of AMTF. This paper describes our experience of three years cryogenic operation of AMTF. All 800 cavities and almost all cryomodules have been tested. The test results and lessons learned are also summarized
- 28 February 2017
- Published by IOP Publishing in IOP Conference Series: Materials Science and Engineering
- Vol. 171 (1) , 012099
Open AccessXFEL AMTF operation completed: results and lessons learned
In order to produce short pulsed electron beam of 17.5 GeV energy, the XFEL linear accelerator is being built at DESY in Hamburg. Before being installed in the accelerator tunnel, 103 accelerator modules have to be tested in Accelerator Module Test Facility (AMTF). Cavities and cryomodules are tested at two vertical cryostats and three horizontal test benches. Two valve boxes and a liquid helium (LHe) storage tank are installed to enable cryogenic operation of AMTF. This paper describes our experience of three years cryogenic operation of AMTF. All 800 cavities and almost all cryomodules have been tested. The test results and lessons learned are also summarized
- 1 November 2013
- Published by Elsevier in Intermetallics
- Vol. 42, 99-106
Electrical resistivity, Curie temperature and band structure in Tb0.27Dy0.73(Fe1−xCox)2 intermetallics
- 1 November 2013
- Published by Elsevier in Intermetallics
- Vol. 42, 99-106
Electrical resistivity, Curie temperature and band structure in Tb0.27Dy0.73(Fe1−xCox)2 intermetallics
- 31 May 2013
- Published by Elsevier in Journal of Magnetism and Magnetic Materials
- Vol. 334, 59-65
Crystal structure, electrical resistivity and Curie temperature of Ho(Mn1−xFex)2 and Ho(Co1−xNix)2 intermetallics
- 31 May 2013
- Published by Elsevier in Journal of Magnetism and Magnetic Materials
- Vol. 334, 59-65
Crystal structure, electrical resistivity and Curie temperature of Ho(Mn1−xFex)2 and Ho(Co1−xNix)2 intermetallics
- 3 February 2012
- Published by IOP Publishing in Physica Scripta
- Vol. 85 (3) , 035703
Electrical resistivity, Curie temperature and band structure of Ho(Fe1−xCox)2compounds
- 3 February 2012
- Published by IOP Publishing in Physica Scripta
- Vol. 85 (3) , 035703
Electrical resistivity, Curie temperature and band structure of Ho(Fe1−xCox)2compounds
- 1 May 2011
- Published by IOP Publishing in Physica Scripta
- Vol. 83 (5)
Mössbauer effect and full-potential linearized augmented plane wave band structure studies on Ho(Fe1−xCox)2intermetallics
- 1 May 2011
- Published by IOP Publishing in Physica Scripta
- Vol. 83 (5)
Mössbauer effect and full-potential linearized augmented plane wave band structure studies on Ho(Fe1−xCox)2intermetallics
- 3 December 2010
- Published by IOP Publishing in Physica Scripta
- Vol. 83 (1)
Hyperfine interactions in Ho(Fe1−xCox)2compounds at 77 K
- 3 December 2010
- Published by IOP Publishing in Physica Scripta
- Vol. 83 (1)
Hyperfine interactions in Ho(Fe1−xCox)2compounds at 77 K
- 1 May 2007
- Published by Elsevier in Journal of Alloys and Compounds
- Vol. 433 (1-2) , 53-58
Crystal structure and electrical resistivity studies of Gd(Fe1− Co )2 intermetallics
- 1 May 2007
- Published by Elsevier in Journal of Alloys and Compounds
- Vol. 433 (1-2) , 53-58
Crystal structure and electrical resistivity studies of Gd(Fe1− Co )2 intermetallics