David Walter
David Walter has a total of 12 co-authors. Here are the top co-authors by number of shared publications:
Philipp Klingel
Stadtwerke Karlsruhe Netzservice GmbH, Daxlander Str. 72, 76127 Karlsruhe, Germany
3 shared publicationsMiran Mastaller
Karlsruhe Institute of Technology (KIT), Institute for Water and River Basin Management (IWG), Kaiserstraße 12, 76131 Karlsruhe, Germany
2 shared publications- Anthea Müller
Karlsruhe Institute of Technology
1 shared publication - Daniel Stoffel
Karlsruher Institut für Technologie; Institut für Wasser und Gewässerentwicklung, Fachbereich Wasserwirtschaft und Kulturtechnik; Kaiserstraße 12 76131 Karlsruhe
1 shared publication - Fabian Haas
Karlsruhe Institute of Technology
1 shared publication - Franz Nestmann
Institute for Water and River Basin Management, Karlsruhe Institute of Technology (KIT), Kaiserstr. 12, 76131 Karlsruhe, Germany
1 shared publication
Latest Publications
- Open Access
- 27 January 2021
- Published by IWA Publishing in Water Supply
- Vol. 21 (4) , 1538-1551
System for controlled distribution of non-demand-covering water availability: concept, design and modelling
This paper presents a novel water supply system to distribute limited water resources with varying quantity. The system enables a controlled, planned and, thus, fair distribution of the water availability independently from the consumption patterns. The system input is transported by gravitation through a branched pipe system to decentralised storage tanks. Each storage tank is allocated to a supply unit which comprises several consumers and, possibly, distribution structures connecting the consumers and the tank. At every junction the water is divided by a distribution tank with several chambers that are separated by weir overflows. Water that is not consumed is redistributed in the system automatically. The concept, the components, planning criteria and system design as well as the system modelling are described within the paper. The application of the solution in a supply area located in northern Vietnam is outlined.
- 27 January 2021
- Published by IWA Publishing in Water Supply
- Vol. 21 (4) , 1538-1551
Open AccessSystem for controlled distribution of non-demand-covering water availability: concept, design and modelling
This paper presents a novel water supply system to distribute limited water resources with varying quantity. The system enables a controlled, planned and, thus, fair distribution of the water availability independently from the consumption patterns. The system input is transported by gravitation through a branched pipe system to decentralised storage tanks. Each storage tank is allocated to a supply unit which comprises several consumers and, possibly, distribution structures connecting the consumers and the tank. At every junction the water is divided by a distribution tank with several chambers that are separated by weir overflows. Water that is not consumed is redistributed in the system automatically. The concept, the components, planning criteria and system design as well as the system modelling are described within the paper. The application of the solution in a supply area located in northern Vietnam is outlined.
- 20 July 2017
- Published by Wiley in Bautechnik
- Vol. 94 (8) , 514-525
Innovative Technologien zur Wasserförderung und ‐verteilung in Gebirgsregionen
- 20 July 2017
- Published by Wiley in Bautechnik
- Vol. 94 (8) , 514-525
Innovative Technologien zur Wasserförderung und ‐verteilung in Gebirgsregionen
- 14 July 2017
- Published by IWA Publishing in Water Supply
- Vol. 18 (2) , 679-687
Accuracy of single-jet and multi-jet water meters under the influence of the filling process in intermittently operated pipe networks
In many areas of the world water distribution systems are operated intermittently. The alternate filling and emptying of the pipe network leads to effects, which have negative impacts on water meter accuracy. For example, air that is present in the pipe network due to the emptying process must exit the network during the subsequent filling process. A part of this air is discharged through service connections and, thus, through water meters. In this paper, a study is presented in which the measurement error of single-jet and multi-jet water meters due to the filling process of an empty pipe is investigated experimentally. From the start of air flow to the steady-state flow of water, several causes of measurement errors can be distinguished, such as pure air flow, the impact of the water front on the impeller, the existence of two-phase flow or unsteady flow conditions. For both meter types, it has been discovered that the measurement error is mainly caused by the air flow. The experimental results show that up to 93% of the air volume in the pipe is registered by the water meters. Based on these results, an approach for estimating the measurement error for both meter types is presented.
- 14 July 2017
- Published by IWA Publishing in Water Supply
- Vol. 18 (2) , 679-687
Accuracy of single-jet and multi-jet water meters under the influence of the filling process in intermittently operated pipe networks
In many areas of the world water distribution systems are operated intermittently. The alternate filling and emptying of the pipe network leads to effects, which have negative impacts on water meter accuracy. For example, air that is present in the pipe network due to the emptying process must exit the network during the subsequent filling process. A part of this air is discharged through service connections and, thus, through water meters. In this paper, a study is presented in which the measurement error of single-jet and multi-jet water meters due to the filling process of an empty pipe is investigated experimentally. From the start of air flow to the steady-state flow of water, several causes of measurement errors can be distinguished, such as pure air flow, the impact of the water front on the impeller, the existence of two-phase flow or unsteady flow conditions. For both meter types, it has been discovered that the measurement error is mainly caused by the air flow. The experimental results show that up to 93% of the air volume in the pipe is registered by the water meters. Based on these results, an approach for estimating the measurement error for both meter types is presented.
- 28 March 2017
- Published by Taylor & Francis in Urban Water Journal
- Vol. 14 (10) , 991-998
Accuracy of single-jet water meters during filling of the pipe network in intermittent water supply
In intermittently operated water distribution systems the air intruded into the pipe network through the filling and emptying process must inevitably exit the system at some point. Part of this air is discharged through service connections and thus through water meters. Due to this air flow, water meters are being used contrary to their actual conception. This article presents a study in which the measurement error of single-jet water meters due to the filling process of an empty service connection is experimentally examined. It shows that this error is caused mainly by the air flow before the water front reaches the water meter. The correlation between the measurement error and the air volume in front of the water meter is almost linear. The impact of the water front, the presence of water-air mixtures or unsteady flow processes however, is shown to have very little influence on the results.
- 28 March 2017
- Published by Taylor & Francis in Urban Water Journal
- Vol. 14 (10) , 991-998
Accuracy of single-jet water meters during filling of the pipe network in intermittent water supply
In intermittently operated water distribution systems the air intruded into the pipe network through the filling and emptying process must inevitably exit the system at some point. Part of this air is discharged through service connections and thus through water meters. Due to this air flow, water meters are being used contrary to their actual conception. This article presents a study in which the measurement error of single-jet water meters due to the filling process of an empty service connection is experimentally examined. It shows that this error is caused mainly by the air flow before the water front reaches the water meter. The correlation between the measurement error and the air volume in front of the water meter is almost linear. The impact of the water front, the presence of water-air mixtures or unsteady flow processes however, is shown to have very little influence on the results.
- 2 June 2014
- Published by Wiley in Bautechnik
- Vol. 91 (6) , 393-397
Herausforderung Sri Lanka