Erika Anneli Pärn
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Erika Anneli Pärn has a total of 77 co-authors. Here are the top co-authors by number of shared publications:
- David John Edwards
Faculty of Engineering and the Built Environment, University of Johannesburg, Johannesburg 2092, South Africa
24 shared publications - Clinton Aigbavboa
University of Johannesburg Department of Construction management and Quantity Surveying Johannesburg
6 shared publications - De-Graft Owusu-Manu
Department of Construction Technology and Management, Kwame Nkrumah University of Science and Technology, Kumasi, Ghana
6 shared publications D.J. Edwards
5 shared publications- Maxwell Fordjour Antwi-Afari
Department of Civil Engineering, College of Engineering and Physical Sciences, Aston University, Birmingham B4 7ET, UK
4 shared publications - Albert Ping Chuen Chan
The Hong Kong Polytechnic University
3 shared publications
Latest Publications
- 7 May 2026
- Published by Edward Elgar Publishing
- p. 628-656
Deep generative models for the design automation of green buildings
Achieving all aspects of green building design can often pose significant challenges for architects and structural engineers alike. Design automation solves the problem of manual and time-consuming design processes by streamlining and optimizing architectural and structural design solutions. However, the insufficient implementation of design automation technologies in the building and structural design industry has significant implications for productivity, innovation, and sustainability. This necessitates an urgent need for comprehensive solutions to address this societal problem. In this chapter, a review of building and structural design automation methods, including generative design and deep generative design, is presented. This review organizes the exploration of generative design and deep generative models, including generative adversarial networks (GANs), variational autoencoders (VAEs), and reinforcement learning (RL) frameworks and their applications. The chapter discusses key works that have introduced methods and techniques in generative design. Moreover, it addresses key challenges observed in generative systems across design fields. Potential opportunities are identified for future research, outlining crucial areas that require strategies for resolution.
- 7 May 2026
- Published by Edward Elgar Publishing
- p. 628-656
Deep generative models for the design automation of green buildings
Achieving all aspects of green building design can often pose significant challenges for architects and structural engineers alike. Design automation solves the problem of manual and time-consuming design processes by streamlining and optimizing architectural and structural design solutions. However, the insufficient implementation of design automation technologies in the building and structural design industry has significant implications for productivity, innovation, and sustainability. This necessitates an urgent need for comprehensive solutions to address this societal problem. In this chapter, a review of building and structural design automation methods, including generative design and deep generative design, is presented. This review organizes the exploration of generative design and deep generative models, including generative adversarial networks (GANs), variational autoencoders (VAEs), and reinforcement learning (RL) frameworks and their applications. The chapter discusses key works that have introduced methods and techniques in generative design. Moreover, it addresses key challenges observed in generative systems across design fields. Potential opportunities are identified for future research, outlining crucial areas that require strategies for resolution.
- Top Cited PapersOpen Access
- 27 January 2026
- Published by Elsevier in Automation in Construction
- Vol. 183
LLM-enabled multi-agent framework for natural language interaction with graph-based digital twins
- 27 January 2026
- Published by Elsevier in Automation in Construction
- Vol. 183
Top Cited PapersOpen AccessLLM-enabled multi-agent framework for natural language interaction with graph-based digital twins
- Open Access
- 25 May 2024
- Published by Elsevier in Developments in the Built Environment
- Vol. 18
A perfect storm: Digital twins, cybersecurity, and general contracting firms
- 25 May 2024
- Published by Elsevier in Developments in the Built Environment
- Vol. 18
Open AccessA perfect storm: Digital twins, cybersecurity, and general contracting firms
- Open Access
- 9 August 2022
- Published by Taylor & Francis
- p. 129-153
E-construction
In the not-too-distant future, applications of seamless public platforms – for instance, with digital twins – will become commonplace in our daily interactions with public services. A digital twin is a replica of a real system realized through data generated by and collected from the real system. Throughout the life cycle of a city’s built environment, the transition into a smart city is further fortified by digital twins that can improve information and performance management in the operational stages of a building. In a digitally twinned world, public services will increasingly rely upon platform innovation strategies to help enhance such services for the public. Within a city and public services context, digitalization has the inherent potential to drastically change procedural methods employed for city planning and public services offered to its citizens. Against this backdrop, this chapter presents a detailed case study of a digital platform of a modern digital economy – namely, the Estonian e-construction platform. The chapter will reveal a projection on how other governments can create new value with digital twins in the digital built environment and uncover potential value for the public with examples of the visioning and business model structure of the e-construction platform as designed and developed by the Estonian Ministry of Economic Affairs.
- 9 August 2022
- Published by Taylor & Francis
- p. 129-153
Open AccessE-construction
In the not-too-distant future, applications of seamless public platforms – for instance, with digital twins – will become commonplace in our daily interactions with public services. A digital twin is a replica of a real system realized through data generated by and collected from the real system. Throughout the life cycle of a city’s built environment, the transition into a smart city is further fortified by digital twins that can improve information and performance management in the operational stages of a building. In a digitally twinned world, public services will increasingly rely upon platform innovation strategies to help enhance such services for the public. Within a city and public services context, digitalization has the inherent potential to drastically change procedural methods employed for city planning and public services offered to its citizens. Against this backdrop, this chapter presents a detailed case study of a digital platform of a modern digital economy – namely, the Estonian e-construction platform. The chapter will reveal a projection on how other governments can create new value with digital twins in the digital built environment and uncover potential value for the public with examples of the visioning and business model structure of the e-construction platform as designed and developed by the Estonian Ministry of Economic Affairs.
- 1 February 2021
- Published by Elsevier in Sustainable Cities and Society
- Vol. 65
Built environment of Britain in 2040: Scenarios and strategies
- 1 February 2021
- Published by Elsevier in Sustainable Cities and Society
- Vol. 65
Built environment of Britain in 2040: Scenarios and strategies
- 10 August 2019
- Published by Emerald Publishing in Journal of Engineering, Design and Technology
- Vol. 17 (5) , 960-984
A conceptual framework for utilising BIM digital objects (BDO) in manufacturing design and production
Purpose: Construction manufacturers predominantly rely upon antiquated manual design and production processes and procedures because they lack technical skills needed to automate working practices. This paper aims to automate manufacturing processes by optimising the utilisation of BIM digital objects (BDO) via the development of a conceptual model. Concomitant objectives seek to reduce design errors; eliminate unnecessary costs; automate the generation of quantity bills; and maximise productivity performance.Design/methodology/approach: An inductive approach was adopted through a post positivist epistemological lens set within the context of a case study of a small- and medium-sized enterprise. From an operational perspective, both qualitative and quantitative data were collected and analysed via a novel four-phase waterfall design, namely, literature diagnosis; recording contemporary practice; mapping manufacturing workflow and procedures; and evaluation and proof of concept development.Findings: The work illustrates that BDO enhances manufacturing workflow, reduces product manufacturing lead time and augments quality assurance throughout the whole life cycle of a manufactured product. The conceptual model developed provides a pragmatic and comprehensive solution to automate construction manufacturing procedures and to improve the facilitation of information exchanged between all stakeholders involved.Originality/value: This study presents the first comprehensive case study of BDO application within a manufacturing context. Future research is however, needed to test and validate the conceptual model presented in practice. In doing so, the model can be further refined using practitioner input and real-life manufacturing processes and procedures.
- 10 August 2019
- Published by Emerald Publishing in Journal of Engineering, Design and Technology
- Vol. 17 (5) , 960-984
A conceptual framework for utilising BIM digital objects (BDO) in manufacturing design and production
Purpose: Construction manufacturers predominantly rely upon antiquated manual design and production processes and procedures because they lack technical skills needed to automate working practices. This paper aims to automate manufacturing processes by optimising the utilisation of BIM digital objects (BDO) via the development of a conceptual model. Concomitant objectives seek to reduce design errors; eliminate unnecessary costs; automate the generation of quantity bills; and maximise productivity performance.Design/methodology/approach: An inductive approach was adopted through a post positivist epistemological lens set within the context of a case study of a small- and medium-sized enterprise. From an operational perspective, both qualitative and quantitative data were collected and analysed via a novel four-phase waterfall design, namely, literature diagnosis; recording contemporary practice; mapping manufacturing workflow and procedures; and evaluation and proof of concept development.Findings: The work illustrates that BDO enhances manufacturing workflow, reduces product manufacturing lead time and augments quality assurance throughout the whole life cycle of a manufactured product. The conceptual model developed provides a pragmatic and comprehensive solution to automate construction manufacturing procedures and to improve the facilitation of information exchanged between all stakeholders involved.Originality/value: This study presents the first comprehensive case study of BDO application within a manufacturing context. Future research is however, needed to test and validate the conceptual model presented in practice. In doing so, the model can be further refined using practitioner input and real-life manufacturing processes and procedures.
- Open Access
- 3 August 2019
- Published by Springer Nature in Journal of Housing and the Built Environment
- Vol. 34 (4) , 1149-1167
Pension reforms, risk transfer and housing finance innovations
- 3 August 2019
- Published by Springer Nature in Journal of Housing and the Built Environment
- Vol. 34 (4) , 1149-1167
Open AccessPension reforms, risk transfer and housing finance innovations
- 13 March 2019
- Published by Springer Nature in Science and Engineering Ethics
- Vol. 26 (1) , 325-349
An Empirical Study on Construction Process Corruption Susceptibility: A Vignette of International Expertise
Construction process stages are argued to be vulnerable to the prevalence of corrupt practices. However, the validity of this argument has not been empirically explored in the extant literature of construction management. Therefore, this study examines the stages of the construction process susceptibility to corruption and its most prominent forms of corrupt activities (within the respective stages). A total of forty-four project-related professionals were involved in an expert survey to assess such susceptibilities and the criticality of the identified corrupt activities at each stage. A comparative study of expert views from developing regions against experts from developed regions is conducted. Expert scoring results revealed that three stages are most susceptible, namely: project execution, pre-qualification and tender stages. Such results were confirmed by application of the Mann–Whitney U test statistics tool, showing wide disparities in seven out of eleven identical stages. This study is intended to incite polemic discussions and greater empirical, evidence-based research from scholars in both developed and developing countries. This study adds to the extant literature corruption-related works on the construction process through deeper understanding of the dynamic nature of corrupt practices involved in the stages of the construction process in developing countries. Practically, it intends to offer a veritable plethora of information on the critical stages of the construction process for industry practitioners, policymakers and anti-corruption bodies to careen their attention towards the fight against corruption.
- 13 March 2019
- Published by Springer Nature in Science and Engineering Ethics
- Vol. 26 (1) , 325-349
An Empirical Study on Construction Process Corruption Susceptibility: A Vignette of International Expertise
Construction process stages are argued to be vulnerable to the prevalence of corrupt practices. However, the validity of this argument has not been empirically explored in the extant literature of construction management. Therefore, this study examines the stages of the construction process susceptibility to corruption and its most prominent forms of corrupt activities (within the respective stages). A total of forty-four project-related professionals were involved in an expert survey to assess such susceptibilities and the criticality of the identified corrupt activities at each stage. A comparative study of expert views from developing regions against experts from developed regions is conducted. Expert scoring results revealed that three stages are most susceptible, namely: project execution, pre-qualification and tender stages. Such results were confirmed by application of the Mann–Whitney U test statistics tool, showing wide disparities in seven out of eleven identical stages. This study is intended to incite polemic discussions and greater empirical, evidence-based research from scholars in both developed and developing countries. This study adds to the extant literature corruption-related works on the construction process through deeper understanding of the dynamic nature of corrupt practices involved in the stages of the construction process in developing countries. Practically, it intends to offer a veritable plethora of information on the critical stages of the construction process for industry practitioners, policymakers and anti-corruption bodies to careen their attention towards the fight against corruption.
- 28 February 2019
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 26 (3) , 479-498
Risk of excavators overturning
Purpose: Tracked hydraulic excavators are versatile and ubiquitous items of off-highway plant and machinery that are utilised throughout the construction industry. Each year, a significant number of excavators overturn whilst conducting a lifting operation, causing damage to property, personnel injury or even fatality. The reasons for the overturn are myriad, including: operational or environmental conditions; machine operator acts or omissions; and/or inadequate site supervision. Furthermore, the safe working load (SWL) figure obtained from manufacturer guidance and utilised in lift plans is based upon undertaking a static load only. The purpose of this paper is to determine whether the SWL is still safe to be used in a lift plan when slewing a freely suspended (dynamic) load, and, if not, whether this may be a further contributory factor to overturn incidents.Design/methodology/approach: Previous research has developed a number of machine stability test regimes but these were largely subjective, impractical to replicate and failed to accurately measure the “dynamic” horizontal centrifugal force resulting from slewing the load. This research contributes towards resolving the stability problem by critically evaluating existing governing standards and legislation, investigating case studies of excavator overturn and simulating the dynamic effects of an excavator when slewing a freely suspended load at high rotations per minute (rpm). To achieve this, both the static load and horizontal centrifugal force from slewing this load were calculated for six randomly selected cases of an excavator, with different arm geometry configurations.Findings: The results from the six cases are presented and a worked example of one is detailed to demonstrate how the results were derived. The findings reveal that the SWL quoted on an excavator’s lift rating chart considerably underestimates the extra forces experienced by the machine when an additional dynamic load is added to the static load whilst lifting and slewing a freely suspended load.Originality/value: This work presents the first attempt to accurately model excavator stability by taking consideration of the dynamic forces caused by slewing a freely suspended load and will lead to changes in the way that industry develops and manages lift plans. Future research proposes to vary the weight of load, arm geometry and rpm to predict machine stability characteristics under various operational conditions, and exploit these modelling data to populate pre-programmed sensor-based technology to monitor stability in real time and automatically restrict lift mode operations.
- 28 February 2019
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 26 (3) , 479-498
Risk of excavators overturning
Purpose: Tracked hydraulic excavators are versatile and ubiquitous items of off-highway plant and machinery that are utilised throughout the construction industry. Each year, a significant number of excavators overturn whilst conducting a lifting operation, causing damage to property, personnel injury or even fatality. The reasons for the overturn are myriad, including: operational or environmental conditions; machine operator acts or omissions; and/or inadequate site supervision. Furthermore, the safe working load (SWL) figure obtained from manufacturer guidance and utilised in lift plans is based upon undertaking a static load only. The purpose of this paper is to determine whether the SWL is still safe to be used in a lift plan when slewing a freely suspended (dynamic) load, and, if not, whether this may be a further contributory factor to overturn incidents.Design/methodology/approach: Previous research has developed a number of machine stability test regimes but these were largely subjective, impractical to replicate and failed to accurately measure the “dynamic” horizontal centrifugal force resulting from slewing the load. This research contributes towards resolving the stability problem by critically evaluating existing governing standards and legislation, investigating case studies of excavator overturn and simulating the dynamic effects of an excavator when slewing a freely suspended load at high rotations per minute (rpm). To achieve this, both the static load and horizontal centrifugal force from slewing this load were calculated for six randomly selected cases of an excavator, with different arm geometry configurations.Findings: The results from the six cases are presented and a worked example of one is detailed to demonstrate how the results were derived. The findings reveal that the SWL quoted on an excavator’s lift rating chart considerably underestimates the extra forces experienced by the machine when an additional dynamic load is added to the static load whilst lifting and slewing a freely suspended load.Originality/value: This work presents the first attempt to accurately model excavator stability by taking consideration of the dynamic forces caused by slewing a freely suspended load and will lead to changes in the way that industry develops and manages lift plans. Future research proposes to vary the weight of load, arm geometry and rpm to predict machine stability characteristics under various operational conditions, and exploit these modelling data to populate pre-programmed sensor-based technology to monitor stability in real time and automatically restrict lift mode operations.