Hannes Harter
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Hannes Harter has a total of 34 co-authors. Here are the top co-authors by number of shared publications:
- Werner Lang
Technical University of Munich
4 shared publications - Patricia Schneider-Marin
NTNU
3 shared publications - Bruno Willenborg
Chair of Geoinformatics, Technical University of Munich (TUM), Arcisstr. 21, Munich, 80333, Bavaria, Germany
2 shared publications - Thomas H. Kolbe
Technische Universität München - Runder Tisch GIS e.V.
2 shared publications Ursula Eicker
2 shared publicationsVerena Weiler
2 shared publications
Latest Publications
- Open Access
- 18 August 2026
- Published by Elsevier in Atmospheric Environment: X
- Vol. 31
Munich CO2 emission inventory for sectors public power and commercial and residential combustion for the years 2019–2024
- 18 August 2026
- Published by Elsevier in Atmospheric Environment: X
- Vol. 31
Open AccessMunich CO2 emission inventory for sectors public power and commercial and residential combustion for the years 2019–2024
- 8 May 2023
- Published by Elsevier in Energy and Buildings
- Vol. 292, 113141
Climate-neutral municipal building stock - life cycle assessment of large residential building stocks based on semantic 3D city models
- 8 May 2023
- Published by Elsevier in Energy and Buildings
- Vol. 292, 113141
Climate-neutral municipal building stock - life cycle assessment of large residential building stocks based on semantic 3D city models
- 11 April 2023
- Published by Elsevier in Journal of Cleaner Production
- Vol. 407
Life Cycle Assessment of building energy systems on neighbourhood level based on semantic 3D city models
- 11 April 2023
- Published by Elsevier in Journal of Cleaner Production
- Vol. 407
Life Cycle Assessment of building energy systems on neighbourhood level based on semantic 3D city models
Prediction of window handle state using machine learning
Vorhersage des Fensteröffnungszustands unter Anwendung von maschinellem LernenDer in dieser Publikation beschriebene methodische Ansatz zur Anwendung von Algorithmen des maschinellen Lernens zur Vorhersage des Fensteröffnungsverhaltens von Gebäudenutzenden, basiert auf Monitoring‐Daten eines Bürogebäudes in Regensburg, Deutschland. Das umfangreiche Monitoring zur Erfassung der notwendigen Daten, z. B. der Innenraum‐ und Außentemperaturen, die Fenstergriffzustände etc. wurde im Rahmen eines Forschungsprojektes in den Jahren 2017 bis 2020 durchgeführt. Im Folgenden werden verschiedene Klassifizierungsalgorithmen des maschinellen Lernens auf die gemessenen Daten angewendet, um Modelle für die Vorhersage von Fensteröffnungen und ‐schließungen zu trainieren. Das Ziel ist es, die Potenziale und Grenzen der realistischen Vorhersage des Nutzerverhaltens auf der Grundlage der verfügbaren Daten zu identifizieren.
Prediction of window handle state using machine learning
Vorhersage des Fensteröffnungszustands unter Anwendung von maschinellem LernenDer in dieser Publikation beschriebene methodische Ansatz zur Anwendung von Algorithmen des maschinellen Lernens zur Vorhersage des Fensteröffnungsverhaltens von Gebäudenutzenden, basiert auf Monitoring‐Daten eines Bürogebäudes in Regensburg, Deutschland. Das umfangreiche Monitoring zur Erfassung der notwendigen Daten, z. B. der Innenraum‐ und Außentemperaturen, die Fenstergriffzustände etc. wurde im Rahmen eines Forschungsprojektes in den Jahren 2017 bis 2020 durchgeführt. Im Folgenden werden verschiedene Klassifizierungsalgorithmen des maschinellen Lernens auf die gemessenen Daten angewendet, um Modelle für die Vorhersage von Fensteröffnungen und ‐schließungen zu trainieren. Das Ziel ist es, die Potenziale und Grenzen der realistischen Vorhersage des Nutzerverhaltens auf der Grundlage der verfügbaren Daten zu identifizieren.
- Open Access
- 27 March 2020
- Published by International Council for Research and Innovation in Building and Construction in Journal of Information Technology in Construction
- Vol. 25 (13) , 212-232
Consistent management and evaluation of building models in the early design stages
The early stages of building design involve the consideration of different design variants and their assessment regarding various performance criteria including energy consumption and costs. During the design process, the involved experts from different disciplines frequently exchange building information to develop a design that satisfies the project’s requirements and objectives. In the course of this iterative process, the building design evolves throughout multiple refinement stages. At the same time, different variants are developed. In BIM-based projects, the maturity of the design information provided by the model is expressed by the notion of Level of development (LOD). So far, however, there is no method to formally define the information requirements of a LOD. In particular, there are no means for expressing the uncertainty involved with the provided information. By contrast, despite the insufficient information available in early design stages, a BIM model appears precise and certain. This situation leads to false assumptions and model evaluations, for example, in the case of energy efficiency calculations or structural analysis. Hence, this paper presents an overview of a set of approaches that were developed to alleviate and preserve the consistency of the designed solutions. The approach includes the development of a multi-LOD meta-model, which allows one to explicitly describe the LOD requirements of each building component type incorporating the possible uncertainties, e.g. concerning the building dimensions. On the basis of this multi-LOD model, methods for evaluating a building design’s performance regarding the building’s structure and life cycle energy performance are proposed that take the defined uncertainties into account. To support the management of design variants in one consistent model, a graph-based approach is introduced. Finally, a minimized communication protocol is described to facilitate the workflow and communicate the evaluation results for supporting the decision-making process.
- 27 March 2020
- Published by International Council for Research and Innovation in Building and Construction in Journal of Information Technology in Construction
- Vol. 25 (13) , 212-232
Open AccessConsistent management and evaluation of building models in the early design stages
The early stages of building design involve the consideration of different design variants and their assessment regarding various performance criteria including energy consumption and costs. During the design process, the involved experts from different disciplines frequently exchange building information to develop a design that satisfies the project’s requirements and objectives. In the course of this iterative process, the building design evolves throughout multiple refinement stages. At the same time, different variants are developed. In BIM-based projects, the maturity of the design information provided by the model is expressed by the notion of Level of development (LOD). So far, however, there is no method to formally define the information requirements of a LOD. In particular, there are no means for expressing the uncertainty involved with the provided information. By contrast, despite the insufficient information available in early design stages, a BIM model appears precise and certain. This situation leads to false assumptions and model evaluations, for example, in the case of energy efficiency calculations or structural analysis. Hence, this paper presents an overview of a set of approaches that were developed to alleviate and preserve the consistency of the designed solutions. The approach includes the development of a multi-LOD meta-model, which allows one to explicitly describe the LOD requirements of each building component type incorporating the possible uncertainties, e.g. concerning the building dimensions. On the basis of this multi-LOD model, methods for evaluating a building design’s performance regarding the building’s structure and life cycle energy performance are proposed that take the defined uncertainties into account. To support the management of design variants in one consistent model, a graph-based approach is introduced. Finally, a minimized communication protocol is described to facilitate the workflow and communicate the evaluation results for supporting the decision-making process.
- Open Access
- 26 March 2020
- Published by MDPI AG in Sustainability
- Vol. 12 (7) , 2633
Uncertainty Analysis of Embedded Energy and Greenhouse Gas Emissions Using BIM in Early Design Stages
With current efforts to increase energy efficiency and reduce greenhouse gas (GHG) emissions of buildings in the operational phase, the share of embedded energy (EE) and embedded GHG emissions is increasing. In early design stages, chances to influence these factors in a positive way are greatest, but very little and vague information about the future building is available. Therefore, this study introduces a building information modeling (BIM)-based method to analyze the contribution of the main functional parts of buildings to find embedded energy demand and GHG emission reduction potentials. At the same time, a sensitivity analysis shows the variance in results due to the uncertainties inherent in early design to avoid misleadingly precise results. The sensitivity analysis provides guidance to the design team as to where to strategically reduce uncertainties in order to increase precision of the overall results. A case study shows that the variability and sensitivity of the results differ between environmental indicators and construction types (wood or concrete). The case study contribution analysis reveals that the building’s structure is the main contributor of roughly half of total GHG emissions if the main structural material is reinforced concrete. Exchanging reinforced concrete for a wood structure reduces total GHG emissions by 25%, with GHG emissions of the structure contributing 33% and windows 30%. Variability can be reduced systematically by first reducing vagueness in geometrical and technical specifications and subsequently in the amount of interior walls. The study shows how a simplified and fast BIM-based calculation provides valuable guidance in early design stages.
- 26 March 2020
- Published by MDPI AG in Sustainability
- Vol. 12 (7) , 2633
Open AccessUncertainty Analysis of Embedded Energy and Greenhouse Gas Emissions Using BIM in Early Design Stages
With current efforts to increase energy efficiency and reduce greenhouse gas (GHG) emissions of buildings in the operational phase, the share of embedded energy (EE) and embedded GHG emissions is increasing. In early design stages, chances to influence these factors in a positive way are greatest, but very little and vague information about the future building is available. Therefore, this study introduces a building information modeling (BIM)-based method to analyze the contribution of the main functional parts of buildings to find embedded energy demand and GHG emission reduction potentials. At the same time, a sensitivity analysis shows the variance in results due to the uncertainties inherent in early design to avoid misleadingly precise results. The sensitivity analysis provides guidance to the design team as to where to strategically reduce uncertainties in order to increase precision of the overall results. A case study shows that the variability and sensitivity of the results differ between environmental indicators and construction types (wood or concrete). The case study contribution analysis reveals that the building’s structure is the main contributor of roughly half of total GHG emissions if the main structural material is reinforced concrete. Exchanging reinforced concrete for a wood structure reduces total GHG emissions by 25%, with GHG emissions of the structure contributing 33% and windows 30%. Variability can be reduced systematically by first reducing vagueness in geometrical and technical specifications and subsequently in the amount of interior walls. The study shows how a simplified and fast BIM-based calculation provides valuable guidance in early design stages.
- 1 February 2020
- Published by Elsevier in Energy and Buildings
- Vol. 208
Uncertainty Analysis of Life Cycle Energy Assessment in Early Stages of Design
- 1 February 2020
- Published by Elsevier in Energy and Buildings
- Vol. 208
Uncertainty Analysis of Life Cycle Energy Assessment in Early Stages of Design
- 1 February 2017
- Published by Elsevier in Building and Environment
- Vol. 112, 166-176
Developing a roadmap for the modernisation of city quarters – Comparing the primary energy demand and greenhouse gas emissions
- 1 February 2017
- Published by Elsevier in Building and Environment
- Vol. 112, 166-176
Developing a roadmap for the modernisation of city quarters – Comparing the primary energy demand and greenhouse gas emissions
- 1 January 2017
- Published by Elsevier in Energy and Buildings
- Vol. 134, 319-328
Life cycle assessment of buildings and city quarters comparing demolition and reconstruction with refurbishment
- 1 January 2017
- Published by Elsevier in Energy and Buildings
- Vol. 134, 319-328
Life cycle assessment of buildings and city quarters comparing demolition and reconstruction with refurbishment