Kürşad Ağpak
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Kürşad Ağpak has a total of 15 co-authors. Here are the top co-authors by number of shared publications:
Hadi Gökçen
Gazi University
6 shared publications- Zeynel Abidin Çil
Izmir Democracy University
6 shared publications Süleyman Mete
Department of Industrial Engineering, Munzur University , Tunceli, Turkey
5 shared publications- Eren Özceylan
Industrial Engineering Department, Gaziantep University, Gaziantep, Turkey
3 shared publications - Alexandre Dolgui
IMT Atlantique
1 shared publication Cevriye Gencer
1 shared publication
Latest Publications
- 8 December 2017
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 56 (24) , 7375-7389
An optimisation support for the design of hybrid production lines including assembly and disassembly tasks
The optimisation problems related to the assignment of tasks to workstations in assembly and disassembly lines have been largely discussed in the literature. They are known, respectively, as Assembly Line Balancing and Disassembly Line Balancing Problems. In this study, both types of task performed on the identical product are integrated in a common hybrid production system. Therefore, the logistic process is simplified and disassembly tasks can supply easier the assembly tasks with the required components. The considered production system has the layout of two parallel lines with common workstations. The product flow is conventional in the assembly line and reverse in the disassembly line. The paper provides a new mathematical model for designing such a hybrid system and an approximate approach based on ant colony optimisation for solving large-scale instances. The solution method is tested in a case study. The obtained results are compared with the solution provided by the design of two independent lines. The analysis of the results highlights the potential benefits of the hybrid production system.
- 8 December 2017
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 56 (24) , 7375-7389
An optimisation support for the design of hybrid production lines including assembly and disassembly tasks
The optimisation problems related to the assignment of tasks to workstations in assembly and disassembly lines have been largely discussed in the literature. They are known, respectively, as Assembly Line Balancing and Disassembly Line Balancing Problems. In this study, both types of task performed on the identical product are integrated in a common hybrid production system. Therefore, the logistic process is simplified and disassembly tasks can supply easier the assembly tasks with the required components. The considered production system has the layout of two parallel lines with common workstations. The product flow is conventional in the assembly line and reverse in the disassembly line. The paper provides a new mathematical model for designing such a hybrid system and an approximate approach based on ant colony optimisation for solving large-scale instances. The solution method is tested in a case study. The obtained results are compared with the solution provided by the design of two independent lines. The analysis of the results highlights the potential benefits of the hybrid production system.
- 1 December 2017
- Published by Elsevier in Applied Soft Computing
- Vol. 61, 129-138
A beam search approach for solving type II robotic parallel assembly line balancing problem
- 1 December 2017
- Published by Elsevier in Applied Soft Computing
- Vol. 61, 129-138
A beam search approach for solving type II robotic parallel assembly line balancing problem
- 1 October 2016
- Published by Elsevier in Journal of Manufacturing Systems
- Vol. 41, 188-200
A solution approach based on beam search algorithm for disassembly line balancing problem
- 1 October 2016
- Published by Elsevier in Journal of Manufacturing Systems
- Vol. 41, 188-200
A solution approach based on beam search algorithm for disassembly line balancing problem
- 29 September 2016
- Published by Taylor & Francis in Engineering Optimization
- Vol. 49 (6) , 990-1009
Analysis of the type II robotic mixed-model assembly line balancing problem
In recent years, there has been an increasing trend towards using robots in production systems. Robots are used in different areas such as packaging, transportation, loading/unloading and especially assembly lines. One important step in taking advantage of robots on the assembly line is considering them while balancing the line. On the other hand, market conditions have increased the importance of mixed-model assembly lines. Therefore, in this article, the robotic mixed-model assembly line balancing problem is studied. The aim of this study is to develop a new efficient heuristic algorithm based on beam search in order to minimize the sum of cycle times over all models. In addition, mathematical models of the problem are presented for comparison. The proposed heuristic is tested on benchmark problems and compared with the optimal solutions. The results show that the algorithm is very competitive and is a promising tool for further research.
- 29 September 2016
- Published by Taylor & Francis in Engineering Optimization
- Vol. 49 (6) , 990-1009
Analysis of the type II robotic mixed-model assembly line balancing problem
In recent years, there has been an increasing trend towards using robots in production systems. Robots are used in different areas such as packaging, transportation, loading/unloading and especially assembly lines. One important step in taking advantage of robots on the assembly line is considering them while balancing the line. On the other hand, market conditions have increased the importance of mixed-model assembly lines. Therefore, in this article, the robotic mixed-model assembly line balancing problem is studied. The aim of this study is to develop a new efficient heuristic algorithm based on beam search in order to minimize the sum of cycle times over all models. In addition, mathematical models of the problem are presented for comparison. The proposed heuristic is tested on benchmark problems and compared with the optimal solutions. The results show that the algorithm is very competitive and is a promising tool for further research.
- 1 January 2016
- Published by Elsevier in IFAC-PapersOnLine
- Vol. 49 (12) , 938-942
A Goal Programming Approach for Robotic Assembly Line Balancing Problem
- 1 January 2016
- Published by Elsevier in IFAC-PapersOnLine
- Vol. 49 (12) , 938-942
A Goal Programming Approach for Robotic Assembly Line Balancing Problem
- 1 January 2016
- Published by Elsevier in IFAC-PapersOnLine
- Vol. 49 (12) , 921-925
Resource Constrained Disassembly Line Balancing Problem
- 1 January 2016
- Published by Elsevier in IFAC-PapersOnLine
- Vol. 49 (12) , 921-925
Resource Constrained Disassembly Line Balancing Problem
- 14 July 2014
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 53 (4) , 1242-1254
Mathematical models for parallel two-sided assembly line balancing problems and extensions
In this study, a mixed integer programming model for the parallel two-sided assembly line balancing problem is developed. Several extensions such as a cost-oriented model, a model with time and space constraints and a model with assignment restrictions which considers characteristics of parallel lines are also presented. The model has been tested on a number of test problems from the literature. The results for different objective functions are analysed on the test problems.
- 14 July 2014
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 53 (4) , 1242-1254
Mathematical models for parallel two-sided assembly line balancing problems and extensions
In this study, a mixed integer programming model for the parallel two-sided assembly line balancing problem is developed. Several extensions such as a cost-oriented model, a model with time and space constraints and a model with assignment restrictions which considers characteristics of parallel lines are also presented. The model has been tested on a number of test problems from the literature. The results for different objective functions are analysed on the test problems.
- 14 December 2011
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 50 (18) , 5035-5047
Two-sided U-type assembly line balancing problem
U-type and two-sided assembly lines are two types of design having advantages over traditional straight assembly lines. In this paper, a new line design hybrid of U-type and two-sided lines is presented. A bi-objective 0-1 integer programming model is developed to solve the line balancing problem of the proposed design. Zoning constraints are also considered for the proposed design. A number of test problems from the literature with up to 65 tasks are solved. Benefits of two-sided U-type lines are discussed.
- 14 December 2011
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 50 (18) , 5035-5047
Two-sided U-type assembly line balancing problem
U-type and two-sided assembly lines are two types of design having advantages over traditional straight assembly lines. In this paper, a new line design hybrid of U-type and two-sided lines is presented. A bi-objective 0-1 integer programming model is developed to solve the line balancing problem of the proposed design. Zoning constraints are also considered for the proposed design. A number of test problems from the literature with up to 65 tasks are solved. Benefits of two-sided U-type lines are discussed.
- 28 September 2010
- Published by Emerald Publishing in Assembly Automation
- Vol. 30 (4) , 378-387
An approach to find task sequence for re‐balancing of assembly lines
Purpose – Cycle time fluctuations in assembly lines are one of the important reasons of re-balancing. As a result of re-balancing of assembly lines, it will be necessary to change task sequences or equipment locations. The purpose of this paper is to find the task sequence which enables assembly line balancing (ALB) with minimum number of stations (NS) for different cycle times such that tasks and equipment or fixture locations remain unchanged. Design/methodology/approach – In this paper a heuristic which consist of two stages is proposed to find a common task sequence for different cycle times in assembly lines. Findings – It is shown that optimal NS for different cycle times can be achieved with a fixed task sequence. Research limitations/implications – The approach is limited to a single model case. Model variety together with cycle time variety can be investigated in further studies. Practical implications – Assembly lines which require less time and cost for re-balancing can be easily designed by the proposed approach. Originality/value – ALB problem is handled with a new viewpoint. Also, it is observed that the proposed approach serves as a bridge between assembly line design and balancing. In this regard, it is thought to have an important place in the ALB literature.
- 28 September 2010
- Published by Emerald Publishing in Assembly Automation
- Vol. 30 (4) , 378-387
An approach to find task sequence for re‐balancing of assembly lines
Purpose – Cycle time fluctuations in assembly lines are one of the important reasons of re-balancing. As a result of re-balancing of assembly lines, it will be necessary to change task sequences or equipment locations. The purpose of this paper is to find the task sequence which enables assembly line balancing (ALB) with minimum number of stations (NS) for different cycle times such that tasks and equipment or fixture locations remain unchanged. Design/methodology/approach – In this paper a heuristic which consist of two stages is proposed to find a common task sequence for different cycle times in assembly lines. Findings – It is shown that optimal NS for different cycle times can be achieved with a fixed task sequence. Research limitations/implications – The approach is limited to a single model case. Model variety together with cycle time variety can be investigated in further studies. Practical implications – Assembly lines which require less time and cost for re-balancing can be easily designed by the proposed approach. Originality/value – ALB problem is handled with a new viewpoint. Also, it is observed that the proposed approach serves as a bridge between assembly line design and balancing. In this regard, it is thought to have an important place in the ALB literature.
- 1 June 2010
- Published by Canadian Science Publishing in Transactions of the Canadian Society for Mechanical Engineering
- Vol. 34 (2) , 225-241
A NEW ALGORITHM FOR U-SHAPED TWO-SIDED ASSEMBLY LINE BALANCING
This study introduces a new hybrid design for a specific case of assembly lines, and proposes a multi-pass random assignment algorithm to find the minimum number of stations required. The algorithm also finds the sequence and the schedule of the tasks assigned. The new design is a combination of two-sided lines and U-shaped lines, which benefits from the advantages of both designs at the same time. One side of the line is arranged in U-shape allowing stations with crossovers, and the other side of the line is balanced like a traditional straight flow. Depending on product direction, either Left or Right side of the line can be designed in U-shape. Small and large-sized two-sided assembly line test-bed problems were solved using the algorithm. Optimal results are achieved for all small-sized problems. Due to the novelty of the design, results of largesized problems are compared to findings of studies on simple two-sided balancing. Algorithm produced better results in most of the cases.
- 1 June 2010
- Published by Canadian Science Publishing in Transactions of the Canadian Society for Mechanical Engineering
- Vol. 34 (2) , 225-241
A NEW ALGORITHM FOR U-SHAPED TWO-SIDED ASSEMBLY LINE BALANCING
This study introduces a new hybrid design for a specific case of assembly lines, and proposes a multi-pass random assignment algorithm to find the minimum number of stations required. The algorithm also finds the sequence and the schedule of the tasks assigned. The new design is a combination of two-sided lines and U-shaped lines, which benefits from the advantages of both designs at the same time. One side of the line is arranged in U-shape allowing stations with crossovers, and the other side of the line is balanced like a traditional straight flow. Depending on product direction, either Left or Right side of the line can be designed in U-shape. Small and large-sized two-sided assembly line test-bed problems were solved using the algorithm. Optimal results are achieved for all small-sized problems. Due to the novelty of the design, results of largesized problems are compared to findings of studies on simple two-sided balancing. Algorithm produced better results in most of the cases.