Per Olaf Brett
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Per Olaf Brett has a total of 14 co-authors. Here are the top co-authors by number of shared publications:
- Jose Jorge Garcia Agis
Ulstein International AS (Ulsteinvik, Norway)
6 shared publications - Sigurd Solheim Pettersen
Department of Marine Technology, Norwegian University of Science and Technology, Trondheim, Norway
4 shared publications - Stein Ove Erikstad
Department of Marine Technology, Norwegian University of Science and Technology (NTNU), Trondheim, Norway
4 shared publications - Bjørn Egil Asbjørnslett
Department of Marine Technology, Norwegian University of Science and Technology, Trondheim, Norway
3 shared publications - Carl Fredrik Rehn
Department of Marine Technology, Norwegian University of Science and Technology, Trondheim, Norway
3 shared publications - Adam M. Ross
Massachusetts Institute of Technology
1 shared publication
Latest Publications
- Open Access
- 20 May 2024
- Published by TU Delft OPEN Publishing in International Marine Design Conference
Digital Shipbuilding – Needs, challenges, and opportunities
Ship design firms, shipyards, and ship equipment manufacturers – the shipbuilding industry or just shipbuilding, must adapt their products and services' deliverables to the steadily evolving expectations of the stakeholders in the market. Digitalization and the use of computational tools have been suggested as the effective means to meet such challenges. However, many anecdotal statements and industry recognitions have expressed concern that such efforts have proven less effective than should be expected and promised, and opposite to what many application suppliers advertise. It is argued by this paper that such a situation is experienced because of, among other explanatory factors, incompatibility, lack of proper protocols for information sharing and isolated implementation efforts in single departments rather than a holistic organizational approach. The lack of full understanding of the ship designer's role and responsibility as the main facilitator of such a change process is also recognized as a clear weakness in the effort of successful digitalization of shipbuilding. It is argued that such a vital transformation process cannot be left alone to the software application providers, despite their size and dominance. This paper explains and discusses why this situation is experienced and indicates what improvement measures could be introduced to counteract the opportunity loss. The article addresses five potential digital service deliverables that could complement the existing service delivery of shipbuilding operations and thereby increase competitiveness and market attractiveness. These services include a) vessel support and control centres, b) performance monitoring, c) maintenance management, d) spare part handling, and e) life cycle assessment (LCA). The article also reflects on what implications and consequences this development has on the ship designers' work and their firm's adaptation to new services' demand in the shipbuilding market. The paper concludes with some reflections on the actual implementation of these services, highlighting challenges and further opportunities.
- 20 May 2024
- Published by TU Delft OPEN Publishing in International Marine Design Conference
Open AccessDigital Shipbuilding – Needs, challenges, and opportunities
Ship design firms, shipyards, and ship equipment manufacturers – the shipbuilding industry or just shipbuilding, must adapt their products and services' deliverables to the steadily evolving expectations of the stakeholders in the market. Digitalization and the use of computational tools have been suggested as the effective means to meet such challenges. However, many anecdotal statements and industry recognitions have expressed concern that such efforts have proven less effective than should be expected and promised, and opposite to what many application suppliers advertise. It is argued by this paper that such a situation is experienced because of, among other explanatory factors, incompatibility, lack of proper protocols for information sharing and isolated implementation efforts in single departments rather than a holistic organizational approach. The lack of full understanding of the ship designer's role and responsibility as the main facilitator of such a change process is also recognized as a clear weakness in the effort of successful digitalization of shipbuilding. It is argued that such a vital transformation process cannot be left alone to the software application providers, despite their size and dominance. This paper explains and discusses why this situation is experienced and indicates what improvement measures could be introduced to counteract the opportunity loss. The article addresses five potential digital service deliverables that could complement the existing service delivery of shipbuilding operations and thereby increase competitiveness and market attractiveness. These services include a) vessel support and control centres, b) performance monitoring, c) maintenance management, d) spare part handling, and e) life cycle assessment (LCA). The article also reflects on what implications and consequences this development has on the ship designers' work and their firm's adaptation to new services' demand in the shipbuilding market. The paper concludes with some reflections on the actual implementation of these services, highlighting challenges and further opportunities.
- Open Access
- 20 May 2024
- Published by TU Delft OPEN Publishing in International Marine Design Conference
Early Marine Systems' Design – Cracking the wicked problem - The case of a novel biomass harvesting vessel
Several IMDC contributions have argued for a better approach to capture stakeholders' expectations in vessel newbuilding projects' execution. The appropriate processes of requirements elucidation are, however, often forgotten or insufficiently handled in traditional ship design and customer-designer settings. Such situations most often reveal a situation in which both "tamed" and "wicked" problems are addressed and must be dealt with properly and effectively at the earliest stage of the process. This paper shows how such problems can be addressed by using the existing multidisciplinary methodology. A practical approach consisting of a set of methods, tools, and work processes integrated into the Accelerated Business Development (ABD) approach is applied to a specific use case, a next-generation factory stern trawler development. A detailed step-by-step story of the early vessel design process – requirements elucidation in parallel with concept design solution development – is outlined following a narrative approach. The process being described covers how necessary support information, stakeholders' expectations identification, business[1]related analyses, specific design layout, onboard comfort, and fish process handling and storage are dealt with effectively and efficiently. This case study exemplifies specific solutions to better handle particularly wicked problem situations, but also tamed problems are addressed systemically. The paper concludes by showing how a final ship design solution can look like and consequently be prepared for and to be built. The handover process and documentation from requirements capture and concept design solution development to further basic design activities are highlighted. The case vessel at hand won the prestigious “ship-of-the-year” award in Norway in 2023. The paper critically discusses what are likely to be the most important factors leading to this outcome.
- 20 May 2024
- Published by TU Delft OPEN Publishing in International Marine Design Conference
Open AccessEarly Marine Systems' Design – Cracking the wicked problem - The case of a novel biomass harvesting vessel
Several IMDC contributions have argued for a better approach to capture stakeholders' expectations in vessel newbuilding projects' execution. The appropriate processes of requirements elucidation are, however, often forgotten or insufficiently handled in traditional ship design and customer-designer settings. Such situations most often reveal a situation in which both "tamed" and "wicked" problems are addressed and must be dealt with properly and effectively at the earliest stage of the process. This paper shows how such problems can be addressed by using the existing multidisciplinary methodology. A practical approach consisting of a set of methods, tools, and work processes integrated into the Accelerated Business Development (ABD) approach is applied to a specific use case, a next-generation factory stern trawler development. A detailed step-by-step story of the early vessel design process – requirements elucidation in parallel with concept design solution development – is outlined following a narrative approach. The process being described covers how necessary support information, stakeholders' expectations identification, business[1]related analyses, specific design layout, onboard comfort, and fish process handling and storage are dealt with effectively and efficiently. This case study exemplifies specific solutions to better handle particularly wicked problem situations, but also tamed problems are addressed systemically. The paper concludes by showing how a final ship design solution can look like and consequently be prepared for and to be built. The handover process and documentation from requirements capture and concept design solution development to further basic design activities are highlighted. The case vessel at hand won the prestigious “ship-of-the-year” award in Norway in 2023. The paper critically discusses what are likely to be the most important factors leading to this outcome.
- 3 April 2023
- Published by University of Buckingham Press in International Journal of Maritime Engineering
- Vol. 164 (A4) , 357-372
EARLY STAGE DECISIONS IN MARINE SYSTEMS DESIGN FOR DEEP-SEA MINING
This article studies the prospects for deep seabed mining as a future viable maritime industry, and discuss the commercial, operational, and technical viability of deep seabed mining. By the use of a business development approach originating from the maritime industry, we analyse opportunities for a virtual deep seabed mining project, and identify aspects of stakeholder performance expectations, contextualised by the competitive positioning and identification of related project risks. We discuss strategies and pit-falls when positioning a deep seabed mining venture within the wider mining and metal production value chain, and use a case example in the Northern Atlantic Ocean to study the prospects for a deep seabed mining operation and subsequent system design implications. Furthermore, we contrast to well-established industries like offshore oil and gas, and traditional land-based mining. The study promotes several critical aspects and problem areas when approaching marine systems design for deep seabed mining.
- 3 April 2023
- Published by University of Buckingham Press in International Journal of Maritime Engineering
- Vol. 164 (A4) , 357-372
EARLY STAGE DECISIONS IN MARINE SYSTEMS DESIGN FOR DEEP-SEA MINING
This article studies the prospects for deep seabed mining as a future viable maritime industry, and discuss the commercial, operational, and technical viability of deep seabed mining. By the use of a business development approach originating from the maritime industry, we analyse opportunities for a virtual deep seabed mining project, and identify aspects of stakeholder performance expectations, contextualised by the competitive positioning and identification of related project risks. We discuss strategies and pit-falls when positioning a deep seabed mining venture within the wider mining and metal production value chain, and use a case example in the Northern Atlantic Ocean to study the prospects for a deep seabed mining operation and subsequent system design implications. Furthermore, we contrast to well-established industries like offshore oil and gas, and traditional land-based mining. The study promotes several critical aspects and problem areas when approaching marine systems design for deep seabed mining.
- 26 October 2020
- Published by Taylor & Francis in Production Planning & Control
- Vol. 33 (9-10) , 957-973
Analyzing the factors affecting engineering change implementation performance in the engineer-to-order production environment: case studies from a Norwegian shipbuilding group
Engineering changes (ECs) are unavoidable in the engineer-to-order (ETO) environment. ECs improve products and bring additional profit to ETO companies if effectively negotiated and implemented. Despite the abundant relevant literature on EC management, ETO companies still report cost overruns owing to ECs. Here, a multiple case study conducted in a Norwegian shipbuilding group was used to investigate the factors affecting EC implementation performance in complex ETO environments. The factors were examined by a cross-case analysis of six ECs occurring in the shipbuilding projects. Eleven factors were identified and analyzed; their impact on EC cost was assessed by experts. The factors were ranked; the ranking shows three factors having the highest impact: time of EC occurrence, competence and experience of engineering and production staff, and degree of vertical integration in a supply chain. Finally, the study recommends EC management practices and tools to reduce the negative impacts of the identified factors.
- 26 October 2020
- Published by Taylor & Francis in Production Planning & Control
- Vol. 33 (9-10) , 957-973
Analyzing the factors affecting engineering change implementation performance in the engineer-to-order production environment: case studies from a Norwegian shipbuilding group
Engineering changes (ECs) are unavoidable in the engineer-to-order (ETO) environment. ECs improve products and bring additional profit to ETO companies if effectively negotiated and implemented. Despite the abundant relevant literature on EC management, ETO companies still report cost overruns owing to ECs. Here, a multiple case study conducted in a Norwegian shipbuilding group was used to investigate the factors affecting EC implementation performance in complex ETO environments. The factors were examined by a cross-case analysis of six ECs occurring in the shipbuilding projects. Eleven factors were identified and analyzed; their impact on EC cost was assessed by experts. The factors were ranked; the ranking shows three factors having the highest impact: time of EC occurrence, competence and experience of engineering and production staff, and degree of vertical integration in a supply chain. Finally, the study recommends EC management practices and tools to reduce the negative impacts of the identified factors.
- Open Access
- 5 January 2020
- Published by Taylor & Francis in Maritime Policy & Management
- Vol. 47 (4) , 479-499
Latent capabilities in support of maritime emergency response
This paper defines latent capabilities in marine systems and proposes that latent capabilities can support large-scale emergency response, in which the demand for assistance exceeds the capabilities of dedicated emergency infrastructure. Latent capabilities are functional resources that were neither intended nor recognized during the design phase. Latent capabilities represent an opportunity for ship owners to adapt to swift changes in operating context, responding to new demands that emerge quickly. To enable exploitation of latent capabilities, we suggest a method for identification and implementation of latent capabilities during contingency planning. As a proof-of-concept for latent capabilities, the response to the Macondo oil spill is used as a case study. The case shows that advanced offshore vessels provided latent capabilities that were decisive in shutting down the leaking well. Enabling factors and challenges for this approach are explored, including the impact on vessel economics, the role of the managing organization, and other constraints.
- 5 January 2020
- Published by Taylor & Francis in Maritime Policy & Management
- Vol. 47 (4) , 479-499
Open AccessLatent capabilities in support of maritime emergency response
This paper defines latent capabilities in marine systems and proposes that latent capabilities can support large-scale emergency response, in which the demand for assistance exceeds the capabilities of dedicated emergency infrastructure. Latent capabilities are functional resources that were neither intended nor recognized during the design phase. Latent capabilities represent an opportunity for ship owners to adapt to swift changes in operating context, responding to new demands that emerge quickly. To enable exploitation of latent capabilities, we suggest a method for identification and implementation of latent capabilities during contingency planning. As a proof-of-concept for latent capabilities, the response to the Macondo oil spill is used as a case study. The case shows that advanced offshore vessels provided latent capabilities that were decisive in shutting down the leaking well. Enabling factors and challenges for this approach are explored, including the impact on vessel economics, the role of the managing organization, and other constraints.
- 18 July 2019
- Published by Springer Nature in Research in Engineering Design
- Vol. 30 (4) , 473-487
Overspecified vessel design solutions in multi-stakeholder design problems
- 18 July 2019
- Published by Springer Nature in Research in Engineering Design
- Vol. 30 (4) , 473-487
Overspecified vessel design solutions in multi-stakeholder design problems
- 19 September 2018
- Published by Wiley in Systems Engineering
- Vol. 22 (1) , 80-94
Quantification of changeability level for engineering systems
This paper outlines a generic method for quantifying changeability level, to support better decision making in the early stages of design of engineering systems. Changeability represents the ability of a system to change form, function, or operation, and is a collective term for characteristics such as flexibility, adaptability, and agility. Quantification of changeability level must not be confused with valuation of changeability. The level of changeability in a design is essentially under the control of the designer. Two aspects of changeability are discussed, the first being how to structure changeable design alternatives using the Design for Changeability (DFC) variable. The DFC variable represents combinations of path enablers built into a design. Path enablers are characteristics of systems enabling them to change more easily. The second aspect is to quantify the level of changeability for a given design alternative, based on change cost and time. For the latter, we propose two measures for quantification: (1) bottom‐up, measuring the reduction of cost and time enabled for each relevant change, and (2) top‐down, measuring the span of change opportunities at given cost and time thresholds. A case study of a ship is presented to demonstrate the proposed generic method.
- 19 September 2018
- Published by Wiley in Systems Engineering
- Vol. 22 (1) , 80-94
Quantification of changeability level for engineering systems
This paper outlines a generic method for quantifying changeability level, to support better decision making in the early stages of design of engineering systems. Changeability represents the ability of a system to change form, function, or operation, and is a collective term for characteristics such as flexibility, adaptability, and agility. Quantification of changeability level must not be confused with valuation of changeability. The level of changeability in a design is essentially under the control of the designer. Two aspects of changeability are discussed, the first being how to structure changeable design alternatives using the Design for Changeability (DFC) variable. The DFC variable represents combinations of path enablers built into a design. Path enablers are characteristics of systems enabling them to change more easily. The second aspect is to quantify the level of changeability for a given design alternative, based on change cost and time. For the latter, we propose two measures for quantification: (1) bottom‐up, measuring the reduction of cost and time enabled for each relevant change, and (2) top‐down, measuring the span of change opportunities at given cost and time thresholds. A case study of a ship is presented to demonstrate the proposed generic method.