Hartmut Stadtler
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Hartmut Stadtler has a total of 11 co-authors. Here are the top co-authors by number of shared publications:
- Christoph Kilger
Wirtschaftsprüfungsgesellschaft
2 shared publications - Herbert Meyr
Department of Supply Chain Management, University of Hohenheim, Stuttgart, Germany
2 shared publications - Boris Reuter
Wirtschaftsprüfungsgesellschaft
1 shared publication - Carolin Puettmann
Institute for Logistics and Transportation, University of Hamburg, Hamburg, Germany
1 shared publication - Fatma Tevhide Altekin
School of ManagementSabancı University Orhanlı 34956 Tuzla Istanbul Turkey
1 shared publication Gregor Dudek
Department of Production and Supply Chain Management , Darmstadt University of Technology , Hochschulstrl. 1, Darmstadt, 64287, Germany
1 shared publication
Latest Publications
- Open Access
- 25 January 2024
- Published by Springer Nature in OR Spectrum
- Vol. 46 (3) , 639-668
Multi-period descriptive sampling for scenario generation applied to the stochastic capacitated lot-sizing problem
Using scenarios to model a stochastic system’s behavior poses a dilemma. While a large(r) set of scenarios usually improves the model’s accuracy, it also causes drastic increases in the model’s size and the computational effort required. Multi-period descriptive sampling (MPDS) is a new way to generate a small(er) set of scenarios that yield a good fit both to the periods’ probability distributions and to the convoluted probability distributions of stochastic variables (e.g., period demands) over time. MPDS uses descriptive sampling to draw a sample of S representative random numbers from a period’s known (demand) distribution. Now, to create a set of S representative scenarios, MPDS heuristically combines these random numbers (period demands) period by period so that a good fit is achieved to the convoluted (demand) distributions up to any period in the planning interval. A further contribution of this paper is an (accuracy) improvement heuristic, called fine-tuning, executed once the fix-and-optimize (FO) heuristic to solve a scenario-based mixed integer programming model has been completed. Fine-tuning uses linear programming (LP) with fixed binary variables (e.g., setup decisions) generated by FO and iteratively adapts production quantities so that compliance with given expected service level constraints is reached. The LP is solved with relatively little computational effort, even for large(r) sets of scenarios. We show the advancements possible with MPDS and fine-tuning by solving numerous test instances of the stochastic capacitated lot-sizing problem under a static uncertainty approach.
- 25 January 2024
- Published by Springer Nature in OR Spectrum
- Vol. 46 (3) , 639-668
Open AccessMulti-period descriptive sampling for scenario generation applied to the stochastic capacitated lot-sizing problem
Using scenarios to model a stochastic system’s behavior poses a dilemma. While a large(r) set of scenarios usually improves the model’s accuracy, it also causes drastic increases in the model’s size and the computational effort required. Multi-period descriptive sampling (MPDS) is a new way to generate a small(er) set of scenarios that yield a good fit both to the periods’ probability distributions and to the convoluted probability distributions of stochastic variables (e.g., period demands) over time. MPDS uses descriptive sampling to draw a sample of S representative random numbers from a period’s known (demand) distribution. Now, to create a set of S representative scenarios, MPDS heuristically combines these random numbers (period demands) period by period so that a good fit is achieved to the convoluted (demand) distributions up to any period in the planning interval. A further contribution of this paper is an (accuracy) improvement heuristic, called fine-tuning, executed once the fix-and-optimize (FO) heuristic to solve a scenario-based mixed integer programming model has been completed. Fine-tuning uses linear programming (LP) with fixed binary variables (e.g., setup decisions) generated by FO and iteratively adapts production quantities so that compliance with given expected service level constraints is reached. The LP is solved with relatively little computational effort, even for large(r) sets of scenarios. We show the advancements possible with MPDS and fine-tuning by solving numerous test instances of the stochastic capacitated lot-sizing problem under a static uncertainty approach.
- 25 March 2019
- Published by Springer Nature in OR Spectrum
- Vol. 41 (4) , 1025-1056
Model formulations for the capacitated lot-sizing problem with service-level constraints
- 25 March 2019
- Published by Springer Nature in OR Spectrum
- Vol. 41 (4) , 1025-1056
Model formulations for the capacitated lot-sizing problem with service-level constraints
- Open Access
- 29 January 2019
- Published by Springer Nature in Business Research
- Vol. 13 (1) , 3-38
Stabilized-cycle strategy for a multi-item, capacitated, hierarchical production planning problem in rolling schedules
Little research has been done on hierarchical production planning systems (HPPS) in the context of rolling schedules with service-level constraints. Here, we adapt the stabilized-cycle strategy, which has initially been created for the master planning level (Meistering and Stadtler in Prod Oper Manag 26:2247–2265, 2017), to a two-level, multi-item, capacitated (short-medium-term) HPPS with demand uncertainty. For each planning level, we present extensions for mixed-integer programming models from literature (CLSP-L, PLSP) and introduce anticipation functions, as well as linking constraints. In a computational study, we analyze the performance of the HPPS with different rolling schedule strategies: the period-based, the order-based, and the stabilized-cycle strategy. It turns out that the stabilized-cycle strategy dominates the period-based strategy for all studied instances. For some instances, the stabilized-cycle strategy even dominates the order-based strategy; while in remaining instances, the stabilized-cycle strategy provides non-dominated solutions with a significant smaller downside deviation from service-level agreements and only a minor increase of costs.
- 29 January 2019
- Published by Springer Nature in Business Research
- Vol. 13 (1) , 3-38
Open AccessStabilized-cycle strategy for a multi-item, capacitated, hierarchical production planning problem in rolling schedules
Little research has been done on hierarchical production planning systems (HPPS) in the context of rolling schedules with service-level constraints. Here, we adapt the stabilized-cycle strategy, which has initially been created for the master planning level (Meistering and Stadtler in Prod Oper Manag 26:2247–2265, 2017), to a two-level, multi-item, capacitated (short-medium-term) HPPS with demand uncertainty. For each planning level, we present extensions for mixed-integer programming models from literature (CLSP-L, PLSP) and introduce anticipation functions, as well as linking constraints. In a computational study, we analyze the performance of the HPPS with different rolling schedule strategies: the period-based, the order-based, and the stabilized-cycle strategy. It turns out that the stabilized-cycle strategy dominates the period-based strategy for all studied instances. For some instances, the stabilized-cycle strategy even dominates the order-based strategy; while in remaining instances, the stabilized-cycle strategy provides non-dominated solutions with a significant smaller downside deviation from service-level agreements and only a minor increase of costs.
- 17 October 2014
- Published by Springer Nature
- p. 525-536
Linear and Mixed Integer Programming
- 17 October 2014
- Published by Springer Nature
- p. 501-509
Conclusions and Outlook