Hussan Al-Chalabi
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Hussan Al-Chalabi has a total of 11 co-authors. Here are the top co-authors by number of shared publications:
Jan Lundberg
5 shared publicationsBehzad Ghodrati
3 shared publicationsAdam Jonsson
2 shared publicationsAlireza Ahmadi
2 shared publications- Jan Lundberg
Luleå University of Technology
2 shared publications - Seyed Hadi Hoseinie
Department of Mining Engineering, Isfahan University of Technology, Isfahan, Iran
2 shared publications
Latest Publications
- Open Access
- 30 March 2022
- Published by Springer Nature in Life Cycle Reliability and Safety Engineering
- Vol. 11 (2) , 203-217
Development of an economic replacement time model for mining equipment: a case study
In mining operation equipment replacement represents a strategic decision problem. This paper presents an economic replacement time model for mining drill rigs. A total ownership cost minimization model was developed to optimize the lifetime of a drill rig used in Tara underground mine in Ireland. The developed methodology allows an innovative practical evaluation of the replacement process by applying sensitivity and regression analysis to rank the factors affecting the replacement time of existing and new models of the production drill rig. Compared to previous studies presented in the literature, the present study represents a further development in this field as it has resulted in a practical optimization model that can be used to estimate the economic replacement time of repairable equipment used in the mining and other production industries. The proposed model shows that the absolute economic replacement time of the drill rig investigated in this case study is 81 months and the mining company operating the rig can replace it with an identical one within an optimal replacement range of 6 months (i.e. from month 79–84) when the minimum total cost can still be achieved in practice. Sensitivity and regression analyses show that the maintenance cost has the largest impact on the economic replacement time of the drill rig. The study finds that decreasing the operating and maintenance costs of the drill rig will have the positive effect of increasing the economic replacement time linearly for a new model of the drill rig. The proposed model helps decision-makers to plan the replacement of old rigs and purchase new ones from an economic view point. Thus, this new model can be extended and used for more general applications in the mining industry.
- 30 March 2022
- Published by Springer Nature in Life Cycle Reliability and Safety Engineering
- Vol. 11 (2) , 203-217
Open AccessDevelopment of an economic replacement time model for mining equipment: a case study
In mining operation equipment replacement represents a strategic decision problem. This paper presents an economic replacement time model for mining drill rigs. A total ownership cost minimization model was developed to optimize the lifetime of a drill rig used in Tara underground mine in Ireland. The developed methodology allows an innovative practical evaluation of the replacement process by applying sensitivity and regression analysis to rank the factors affecting the replacement time of existing and new models of the production drill rig. Compared to previous studies presented in the literature, the present study represents a further development in this field as it has resulted in a practical optimization model that can be used to estimate the economic replacement time of repairable equipment used in the mining and other production industries. The proposed model shows that the absolute economic replacement time of the drill rig investigated in this case study is 81 months and the mining company operating the rig can replace it with an identical one within an optimal replacement range of 6 months (i.e. from month 79–84) when the minimum total cost can still be achieved in practice. Sensitivity and regression analyses show that the maintenance cost has the largest impact on the economic replacement time of the drill rig. The study finds that decreasing the operating and maintenance costs of the drill rig will have the positive effect of increasing the economic replacement time linearly for a new model of the drill rig. The proposed model helps decision-makers to plan the replacement of old rigs and purchase new ones from an economic view point. Thus, this new model can be extended and used for more general applications in the mining industry.
- Open Access
- 13 August 2018
- Published by MDPI AG in Algorithms
- Vol. 11 (8) , 123
Time Series Forecasting Using a Two-Level Multi-Objective Genetic Algorithm: A Case Study of Maintenance Cost Data for Tunnel Fans
The aim of this study has been to develop a novel two-level multi-objective genetic algorithm (GA) to optimize time series forecasting data for fans used in road tunnels by the Swedish Transport Administration (Trafikverket). Level 1 is for the process of forecasting time series cost data, while level 2 evaluates the forecasting. Level 1 implements either a multi-objective GA based on the ARIMA model or a multi-objective GA based on the dynamic regression model. Level 2 utilises a multi-objective GA based on different forecasting error rates to identify a proper forecasting. Our method is compared with using the ARIMA model only. The results show the drawbacks of time series forecasting using only the ARIMA model. In addition, the results of the two-level model show the drawbacks of forecasting using a multi-objective GA based on the dynamic regression model. A multi-objective GA based on the ARIMA model produces better forecasting results. In level 2, five forecasting accuracy functions help in selecting the best forecasting. Selecting a proper methodology for forecasting is based on the averages of the forecasted data, the historical data, the actual data and the polynomial trends. The forecasted data can be used for life cycle cost (LCC) analysis.
- 13 August 2018
- Published by MDPI AG in Algorithms
- Vol. 11 (8) , 123
Open AccessTime Series Forecasting Using a Two-Level Multi-Objective Genetic Algorithm: A Case Study of Maintenance Cost Data for Tunnel Fans
The aim of this study has been to develop a novel two-level multi-objective genetic algorithm (GA) to optimize time series forecasting data for fans used in road tunnels by the Swedish Transport Administration (Trafikverket). Level 1 is for the process of forecasting time series cost data, while level 2 evaluates the forecasting. Level 1 implements either a multi-objective GA based on the ARIMA model or a multi-objective GA based on the dynamic regression model. Level 2 utilises a multi-objective GA based on different forecasting error rates to identify a proper forecasting. Our method is compared with using the ARIMA model only. The results show the drawbacks of time series forecasting using only the ARIMA model. In addition, the results of the two-level model show the drawbacks of forecasting using a multi-objective GA based on the dynamic regression model. A multi-objective GA based on the ARIMA model produces better forecasting results. In level 2, five forecasting accuracy functions help in selecting the best forecasting. Selecting a proper methodology for forecasting is based on the averages of the forecasted data, the historical data, the actual data and the polynomial trends. The forecasted data can be used for life cycle cost (LCC) analysis.
- Open Access
Comparison between Simulation and Analytical Methods in Reliability Data Analysis: A Case Study on Face Drilling Rigs
Collecting the failure data and reliability analysis in an underground mining operation is challenging due to the harsh environment and high level of production pressure. Therefore, achieving an accurate, fast, and applicable analysis in a fleet of underground equipment is usually difficult and time consuming. This paper aims to discuss the main reliability analysis challenges in mining machinery by comparing three main approaches: two analytical methods (white-box and black-box modeling), and a simulation approach. For this purpose, the maintenance data from a fleet of face drilling rigs in a Swedish underground metal mine were extracted by the MAXIMO system over a period of two years and were applied for analysis. The investigations reveal that the performance of these approaches in ranking and the reliability of the studies of the machines is different. However, all mentioned methods provide similar outputs but, in general, the simulation estimates the reliability of the studied machines at a higher level. The simulation and white-box method sometimes provide exactly the same results, which are caused by their similar structure of analysis. On average, 9% of the data are missed in the white-box analysis due to a lack of sufficient data in some of the subsystems of the studies’ rigs.
Open AccessComparison between Simulation and Analytical Methods in Reliability Data Analysis: A Case Study on Face Drilling Rigs
Collecting the failure data and reliability analysis in an underground mining operation is challenging due to the harsh environment and high level of production pressure. Therefore, achieving an accurate, fast, and applicable analysis in a fleet of underground equipment is usually difficult and time consuming. This paper aims to discuss the main reliability analysis challenges in mining machinery by comparing three main approaches: two analytical methods (white-box and black-box modeling), and a simulation approach. For this purpose, the maintenance data from a fleet of face drilling rigs in a Swedish underground metal mine were extracted by the MAXIMO system over a period of two years and were applied for analysis. The investigations reveal that the performance of these approaches in ranking and the reliability of the studies of the machines is different. However, all mentioned methods provide similar outputs but, in general, the simulation estimates the reliability of the studied machines at a higher level. The simulation and white-box method sometimes provide exactly the same results, which are caused by their similar structure of analysis. On average, 9% of the data are missed in the white-box analysis due to a lack of sufficient data in some of the subsystems of the studies’ rigs.
- 15 December 2015
- Published by Springer Nature
- p. 633-643
Monte Carlo Reliability Simulation of Underground Mining Drilling Rig
- 15 December 2015
- Published by Springer Nature
- p. 633-643
Monte Carlo Reliability Simulation of Underground Mining Drilling Rig
- 11 May 2015
- Published by Emerald Publishing in Journal of Quality in Maintenance Engineering
- Vol. 21 (2) , 207-226
Model for economic replacement time of mining production rigs including redundant rig costs
Purpose: – The purpose of this paper is to present a practical model to determine the economic replacement time (ERT) of production machines. The objective is to minimise the total cost of capital equipment, where total cost includes acquisition, operating, maintenance costs and costs related to the machine’s downtime. The costs related to the machine’s downtime are represented by the costs of using a redundant machine. Design/methodology/approach: – In total, four years of cost data are collected. Data are analysed, practical optimisation model is developed and regression analysis is done to estimate the drilling rigs ERT. The artificial neural network (ANN) technique is used to identify the effect of factors influencing the ERT of the drilling rigs. Findings: – The results show that the redundant rig cost has the largest impact on ERT, followed by acquisition, maintenance and operating costs. The study also finds that increasing redundant costs per hour have a negative effect on ERT, while decreases in other costs have a positive effect. Regression analysis shows a linear relationship between the cost factors and ERT. Practical implications: – The proposed approach can be used by the decision maker in determining the ERT of production machines which used in mining industry. Originality/value: – The research proposed in this paper provides and develops an optimisation model for ERT of mining machines. This research also identifies and explains the factors that have the largest impact on the production machine’s ERT. This model for estimating the ERT has never been studied on mining drilling rigs.
- 11 May 2015
- Published by Emerald Publishing in Journal of Quality in Maintenance Engineering
- Vol. 21 (2) , 207-226
Model for economic replacement time of mining production rigs including redundant rig costs
Purpose: – The purpose of this paper is to present a practical model to determine the economic replacement time (ERT) of production machines. The objective is to minimise the total cost of capital equipment, where total cost includes acquisition, operating, maintenance costs and costs related to the machine’s downtime. The costs related to the machine’s downtime are represented by the costs of using a redundant machine. Design/methodology/approach: – In total, four years of cost data are collected. Data are analysed, practical optimisation model is developed and regression analysis is done to estimate the drilling rigs ERT. The artificial neural network (ANN) technique is used to identify the effect of factors influencing the ERT of the drilling rigs. Findings: – The results show that the redundant rig cost has the largest impact on ERT, followed by acquisition, maintenance and operating costs. The study also finds that increasing redundant costs per hour have a negative effect on ERT, while decreases in other costs have a positive effect. Regression analysis shows a linear relationship between the cost factors and ERT. Practical implications: – The proposed approach can be used by the decision maker in determining the ERT of production machines which used in mining industry. Originality/value: – The research proposed in this paper provides and develops an optimisation model for ERT of mining machines. This research also identifies and explains the factors that have the largest impact on the production machine’s ERT. This model for estimating the ERT has never been studied on mining drilling rigs.
- 1 January 2015
- Published by Inderscience Publishers in International Journal of Strategic Engineering Asset Management
- Vol. 2 (2) , 177
Economic lifetime of a drilling machine: a case study on mining industry
Underground mines use many different types of machinery during the drift mining processes of drilling, charging, blasting, loading, scaling and bolting. Drilling machines play a critical role in the mineral extraction process and thus are important economically. However, as the machines age, their efficiency and effectiveness decrease, negatively affecting productivity and profitability and increasing total cost. Hence, the economic replacement lifetime of the machine is a key performance indicator. This paper introduces an optimisation model that gives the optimal lifetime for a drilling machine. A case study has been done at an underground Swedish mine to identify the economic replacement time of a drilling machine. It considers the purchase price, maintenance and operation costs, and the machine's second-hand value. Findings show that the economic replacement lifetime of a drilling machine in this mine is 96 months. The proposed model can be used for other underground mining machines.
- 1 January 2015
- Published by Inderscience Publishers in International Journal of Strategic Engineering Asset Management
- Vol. 2 (2) , 177
Economic lifetime of a drilling machine: a case study on mining industry
Underground mines use many different types of machinery during the drift mining processes of drilling, charging, blasting, loading, scaling and bolting. Drilling machines play a critical role in the mineral extraction process and thus are important economically. However, as the machines age, their efficiency and effectiveness decrease, negatively affecting productivity and profitability and increasing total cost. Hence, the economic replacement lifetime of the machine is a key performance indicator. This paper introduces an optimisation model that gives the optimal lifetime for a drilling machine. A case study has been done at an underground Swedish mine to identify the economic replacement time of a drilling machine. It considers the purchase price, maintenance and operation costs, and the machine's second-hand value. Findings show that the economic replacement lifetime of a drilling machine in this mine is 96 months. The proposed model can be used for other underground mining machines.
- 7 October 2014
- Published by Emerald Publishing in Journal of Quality in Maintenance Engineering
- Vol. 20 (4) , 306-332
Downtime analysis of drilling machines and suggestions for improvements
Purpose: – The purpose of this paper is to analyse and compare the downtime of four drilling machines used in two underground mines in Sweden. The downtime of these machines was compared to show what problems affect downtime and which strategies should be applied to reduce it.Design/methodology/approach: – The study collects failure data from a two-year period for four drilling machines and performs reliability analysis. It also performs downtime analysis utilising a log-log diagram with a confidence interval.Findings: – There are notable differences in the downtime of most of the studied components for all machines. The hoses and feeder have relatively high downtime. Depending on their downtime, the significant components can be ranked in three groups. The downtime of the studied components is due to reliability problems. The study suggests the need to improve the reliability of critical components to reduce the downtime of drilling machines.Originality/value: – The method of analysing the downtime, identifying dominant factors and the interval estimation for the downtime, has never been studied on drilling machines. The research proposed in this paper provides a general method to link downtime analysis with potential component improvement. To increase the statistical accuracy; four case studies was performed in two different mines with completely different working environment and ore properties. Using the above method showed which components need to be improved and suggestions for improvement was proposed and will be implemented accordingly.
- 7 October 2014
- Published by Emerald Publishing in Journal of Quality in Maintenance Engineering
- Vol. 20 (4) , 306-332
Downtime analysis of drilling machines and suggestions for improvements
Purpose: – The purpose of this paper is to analyse and compare the downtime of four drilling machines used in two underground mines in Sweden. The downtime of these machines was compared to show what problems affect downtime and which strategies should be applied to reduce it.Design/methodology/approach: – The study collects failure data from a two-year period for four drilling machines and performs reliability analysis. It also performs downtime analysis utilising a log-log diagram with a confidence interval.Findings: – There are notable differences in the downtime of most of the studied components for all machines. The hoses and feeder have relatively high downtime. Depending on their downtime, the significant components can be ranked in three groups. The downtime of the studied components is due to reliability problems. The study suggests the need to improve the reliability of critical components to reduce the downtime of drilling machines.Originality/value: – The method of analysing the downtime, identifying dominant factors and the interval estimation for the downtime, has never been studied on drilling machines. The research proposed in this paper provides a general method to link downtime analysis with potential component improvement. To increase the statistical accuracy; four case studies was performed in two different mines with completely different working environment and ore properties. Using the above method showed which components need to be improved and suggestions for improvement was proposed and will be implemented accordingly.
- Open Access
- 30 September 2014
- Published by Taylor & Francis in The Engineering Economist
- Vol. 60 (2) , 138-154
Case Study: Model for Economic Lifetime of Drilling Machines in the Swedish Mining Industry
The purpose of this article is to develop a practical economic replacement decision model to identify the economic lifetime of a mining drilling machine. A data-driven optimization model was developed for operating and maintenance costs, purchase price, and machine resale value. Equivalent present value of these costs by using discount rate was considered. The proposed model shows that the absolute optimal replacement time (ORT) of a drilling machine used in one underground mine in Sweden is 115 months. Sensitivity and regression analysis show that the maintenance cost has the largest impact on the ORT of this machine. The proposed decision-making model is applicable and useful and can be implemented within the mining industry.
- 30 September 2014
- Published by Taylor & Francis in The Engineering Economist
- Vol. 60 (2) , 138-154
Open AccessCase Study: Model for Economic Lifetime of Drilling Machines in the Swedish Mining Industry
The purpose of this article is to develop a practical economic replacement decision model to identify the economic lifetime of a mining drilling machine. A data-driven optimization model was developed for operating and maintenance costs, purchase price, and machine resale value. Equivalent present value of these costs by using discount rate was considered. The proposed model shows that the absolute optimal replacement time (ORT) of a drilling machine used in one underground mine in Sweden is 115 months. Sensitivity and regression analysis show that the maintenance cost has the largest impact on the ORT of this machine. The proposed decision-making model is applicable and useful and can be implemented within the mining industry.
- Open Access
- 21 July 2014
- Published by Taylor & Francis in International Journal of Mining, Reclamation and Environment
- Vol. 28 (5) , 311-322
Economic lifetime prediction of a mining drilling machine using an artificial neural network
- 21 July 2014
- Published by Taylor & Francis in International Journal of Mining, Reclamation and Environment
- Vol. 28 (5) , 311-322
Open AccessEconomic lifetime prediction of a mining drilling machine using an artificial neural network