Ali Rahbari
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Ali Rahbari has a total of 12 co-authors. Here are the top co-authors by number of shared publications:
- Mohammad Mahdi Nasiri
School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
5 shared publications - Ali Bozorgi-Amiri
School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
1 shared publication Dinçer Konur
Department of Information Systems and Analytics, McCoy College of Business, Texas State University, TX
1 shared publication- Fariborz Jolai
School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
1 shared publication - Frank Werner
Faculty of Mathematics, Otto-von-Guericke University, 39106 Magdeburg, Germany
1 shared publication Mojtaba Abdollai
University of Tehran
1 shared publication
Latest Publications
- 23 February 2024
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2678 (9) , 169-195
Integrated Forward and Reverse Cross-Docking with Vehicle Routing and Scheduling Under the Uncertainty of Inspection Results: A Genetic-Mathematic Algorithm
Despite the recognized advantages of cross-docking in forward logistics, very few studies have investigated reverse cross-docking, and these studies do not consider the operational uncertainties of returned products in the reverse flow, which is required in practice. This paper introduces a vehicle routing and scheduling problem for the integration of forward and reverse logistics, in which the cross-docking facility is employed as (i) the distribution center in forward flow and (ii) the collection and dispatching center of returned products in reverse flow. We present two modes based on the inspection point: (i) retailer site or (ii) cross-dock. A deterministic mixed integer linear programming model is presented for the retailer-site inspection mode to minimize the total operational costs. For the second mode, a robust optimization counterpart of the modified deterministic model is formulated to account for the uncertainties arising from the inspection results revealed at the cross-dock. A genetic-mathematic algorithm is proposed to solve the large-sized instances. Through numerical studies, we evaluated the performance of the algorithm and demonstrated cost reductions and truck utilization improvements as benefits of integration. Moreover, in sensitivity analyses using a quasi-real case of a personal electronic device supply chain, and employing simulation, the price of robustness of the second model was evaluated by considering various budget sets, which justified the full robustness and application of the cross-dock as the inspection point in the closed-loop supply chain.
- 23 February 2024
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2678 (9) , 169-195
Integrated Forward and Reverse Cross-Docking with Vehicle Routing and Scheduling Under the Uncertainty of Inspection Results: A Genetic-Mathematic Algorithm
Despite the recognized advantages of cross-docking in forward logistics, very few studies have investigated reverse cross-docking, and these studies do not consider the operational uncertainties of returned products in the reverse flow, which is required in practice. This paper introduces a vehicle routing and scheduling problem for the integration of forward and reverse logistics, in which the cross-docking facility is employed as (i) the distribution center in forward flow and (ii) the collection and dispatching center of returned products in reverse flow. We present two modes based on the inspection point: (i) retailer site or (ii) cross-dock. A deterministic mixed integer linear programming model is presented for the retailer-site inspection mode to minimize the total operational costs. For the second mode, a robust optimization counterpart of the modified deterministic model is formulated to account for the uncertainties arising from the inspection results revealed at the cross-dock. A genetic-mathematic algorithm is proposed to solve the large-sized instances. Through numerical studies, we evaluated the performance of the algorithm and demonstrated cost reductions and truck utilization improvements as benefits of integration. Moreover, in sensitivity analyses using a quasi-real case of a personal electronic device supply chain, and employing simulation, the price of robustness of the second model was evaluated by considering various budget sets, which justified the full robustness and application of the cross-dock as the inspection point in the closed-loop supply chain.
- 1 January 2020
- Published by Taylor & Francis in Transportmetrica A: Transport Science
- Vol. 16 (3) , 930-956
Emergency supply chain scheduling problem with multiple resources in disaster relief operations
In emergency logistics, it is important to allocate available assets to operations effectively due to the resource scarcity. This paper considers a supply chain network which includes local and global suppliers of medical relief items, regional and central distribution centers, and many customer demand points. Either pre-positioned resources at distribution centers or new assembly operations at them can fulfill resources demands. Moreover, a capacitated multi-stage operations scheduling problem is presented, in which renewable (medical teams) as well as non-renewable resources (standard or customized medical kits) are required in an emergency supply chain. In addition, a new mixed integer programming model is presented, and solved for small-sized problems. Further, for solving large-sized problems, a particle swarm optimization (PSO) algorithm is developed. Finally, the performance of the proposed solution method is evaluated, and some sensitivity analyses are conducted on the more important parameters.
- 1 January 2020
- Published by Taylor & Francis in Transportmetrica A: Transport Science
- Vol. 16 (3) , 930-956
Emergency supply chain scheduling problem with multiple resources in disaster relief operations
In emergency logistics, it is important to allocate available assets to operations effectively due to the resource scarcity. This paper considers a supply chain network which includes local and global suppliers of medical relief items, regional and central distribution centers, and many customer demand points. Either pre-positioned resources at distribution centers or new assembly operations at them can fulfill resources demands. Moreover, a capacitated multi-stage operations scheduling problem is presented, in which renewable (medical teams) as well as non-renewable resources (standard or customized medical kits) are required in an emergency supply chain. In addition, a new mixed integer programming model is presented, and solved for small-sized problems. Further, for solving large-sized problems, a particle swarm optimization (PSO) algorithm is developed. Finally, the performance of the proposed solution method is evaluated, and some sensitivity analyses are conducted on the more important parameters.
- 28 November 2018
- Published by Springer Nature in Soft Computing
- Vol. 23 (21) , 11107-11122
A data mining approach for population-based methods to solve the JSSP
- 28 November 2018
- Published by Springer Nature in Soft Computing
- Vol. 23 (21) , 11107-11122
A data mining approach for population-based methods to solve the JSSP
- 1 October 2018
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 124, 435-448
A modified genetic algorithm for the capacitated competitive facility location problem with the partial demand satisfaction
- 1 October 2018
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 124, 435-448
A modified genetic algorithm for the capacitated competitive facility location problem with the partial demand satisfaction
- 17 May 2018
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 56 (19) , 6527-6552
Incorporating supplier selection and order allocation into the vehicle routing and multi-cross-dock scheduling problem
In the vehicle routing problem with cross-docking (VRPCD), it is assumed that the selected suppliers and the quantity of the products purchased from each supplier are known. This paper presents an MILP model which incorporates supplier selection and order allocation into the VRPCD in a multi-cross-dock system minimising the total costs, including purchasing, transportation, cross-docking, inventory and early/tardy delivery penalty costs. The sensitivity of the model on the key parameters of the objective function is analysed and the supply decisions are evaluated when the coefficients of the distribution cost are changed. A two-stage solution algorithm (TSSA) is proposed and the results of the TSSA for small-sized instances are compared with the exact solutions. Finally, a large-sized real case of an urban freight transport is solved using the TSSA.
- 17 May 2018
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 56 (19) , 6527-6552
Incorporating supplier selection and order allocation into the vehicle routing and multi-cross-dock scheduling problem
In the vehicle routing problem with cross-docking (VRPCD), it is assumed that the selected suppliers and the quantity of the products purchased from each supplier are known. This paper presents an MILP model which incorporates supplier selection and order allocation into the VRPCD in a multi-cross-dock system minimising the total costs, including purchasing, transportation, cross-docking, inventory and early/tardy delivery penalty costs. The sensitivity of the model on the key parameters of the objective function is analysed and the supply decisions are evaluated when the coefficients of the distribution cost are changed. A two-stage solution algorithm (TSSA) is proposed and the results of the TSSA for small-sized instances are compared with the exact solutions. Finally, a large-sized real case of an urban freight transport is solved using the TSSA.