Raquel García-Bertrand
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Raquel García-Bertrand has a total of 35 co-authors. Here are the top co-authors by number of shared publications:
- Antonio J. Conejo
Department of Integrated Systems Engineering and the Department of Electrical and Computer Engineering, The Ohio State University, Columbus, OH, USA
12 shared publications - Luis Baringo
Departamento de Ingeniera Elctrica Electrnica Automtica y Comunicaciones, Escuela de Ingeniera Industrial y Aeroespacial, E.T.S. Ingeniera Industrial, Universidad de Castilla-La Mancha, 45004 Toledo, Ciudad Real, Spain
9 shared publications - Roberto Mínguez
Statistics Department, Universidad Carlos III de Madrid, Getafe, Spain
7 shared publications - Álvaro García-Cerezo
Departamento de Ingeniera Elctrica Electrnica Automtica y Comunicaciones, Escuela de Ingeniera Industrial y Aeroespacial, E.T.S. Ingeniera Industrial, Universidad de Castilla-La Mancha, 45004 Toledo, Ciudad Real, Spain
7 shared publications - José Manuel Arroyo
Universidad de Castilla-La Mancha, Ciudad Real, Spain
5 shared publications - Natalia Alguacil
Universidad de Castilla-La Mancha, Ciudad Real, Spain
4 shared publications
Latest Publications
- Open Access
- 2 December 2025
- Published by Elsevier in Sustainable Energy, Grids and Networks
- Vol. 45
Analysis of the iberian intraday market: Price dynamics, market participation, and balancing challenges
- 2 December 2025
- Published by Elsevier in Sustainable Energy, Grids and Networks
- Vol. 45
Open AccessAnalysis of the iberian intraday market: Price dynamics, market participation, and balancing challenges
- Open Access
- 11 September 2025
- Published by Elsevier in European Journal of Operational Research
- Vol. 336 (3) , 1155-1168
Strategic investment in electricity markets: Robust optimization versus stochastic programming
- 11 September 2025
- Published by Elsevier in European Journal of Operational Research
- Vol. 336 (3) , 1155-1168
Open AccessStrategic investment in electricity markets: Robust optimization versus stochastic programming
- Open Access
- 3 February 2023
- Published by Elsevier in International Journal of Electrical Power & Energy Systems
- Vol. 148
Acceleration techniques for adaptive robust optimization transmission network expansion planning problems
- 3 February 2023
- Published by Elsevier in International Journal of Electrical Power & Energy Systems
- Vol. 148
Open AccessAcceleration techniques for adaptive robust optimization transmission network expansion planning problems
- 12 January 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 39 (1) , 273-286
Computational Performance Enhancement Strategies for Risk-Averse Two-Stage Stochastic Generation and Transmission Network Expansion Planning
This paper proposes a new acceleration technique and a representative day aggregation procedure for the risk-averse two-stage stochastic generation and transmission network expansion planning problem, in which the conditional value-at-risk is used. We use a finite set of scenarios to model uncertainty in the peak demand level of loads, along with the capacity and marginal production cost of generating units. Moreover, we use representative days to model the operational variability of the electrical demand and renewable generation. The combination of scenarios and representative days involves many variables and constraints, which may lead to computationally intractable problems. Therefore, we propose a new relaxed version of the constraint generation-based algorithm that reduces the computational time of the problem. We additionally present a two-stage aggregation procedure that combines the modified maximum dissimilarity algorithm and the priority chronological time-period clustering in order to reduce the resolution of the representative days and to pay attention to extreme conditions. The numerical results of modified versions of the IEEE 24-bus Reliability Test System and the IEEE 118-bus Test System show reductions in the computational time of more than 89% for the relaxed constraint generation-based algorithm, and of more than 94% for the two-stage aggregation procedure.
- 12 January 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 39 (1) , 273-286
Computational Performance Enhancement Strategies for Risk-Averse Two-Stage Stochastic Generation and Transmission Network Expansion Planning
This paper proposes a new acceleration technique and a representative day aggregation procedure for the risk-averse two-stage stochastic generation and transmission network expansion planning problem, in which the conditional value-at-risk is used. We use a finite set of scenarios to model uncertainty in the peak demand level of loads, along with the capacity and marginal production cost of generating units. Moreover, we use representative days to model the operational variability of the electrical demand and renewable generation. The combination of scenarios and representative days involves many variables and constraints, which may lead to computationally intractable problems. Therefore, we propose a new relaxed version of the constraint generation-based algorithm that reduces the computational time of the problem. We additionally present a two-stage aggregation procedure that combines the modified maximum dissimilarity algorithm and the priority chronological time-period clustering in order to reduce the resolution of the representative days and to pay attention to extreme conditions. The numerical results of modified versions of the IEEE 24-bus Reliability Test System and the IEEE 118-bus Test System show reductions in the computational time of more than 89% for the relaxed constraint generation-based algorithm, and of more than 94% for the two-stage aggregation procedure.
- 1 November 2022
- Published by IATED Academy in ICERI Proceedings
- Vol. 1, 4707-4716
LEARNING POWER SYSTEM SIMULATION IN AN INTERNATIONAL FRAMEWORK
Information about the paper titled "LEARNING POWER SYSTEM SIMULATION IN AN INTERNATIONAL FRAMEWORK" at IATED Digital Library
- 1 November 2022
- Published by IATED Academy in ICERI Proceedings
- Vol. 1, 4707-4716
LEARNING POWER SYSTEM SIMULATION IN AN INTERNATIONAL FRAMEWORK
Information about the paper titled "LEARNING POWER SYSTEM SIMULATION IN AN INTERNATIONAL FRAMEWORK" at IATED Digital Library
- 5 September 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- Vol. 177, 1-6
Dynamic Robust Transmission Network Expansion Planning in Renewable Dominated Power Systems Considering Inter-Temporal and Non-Convex Operational Constraints
This paper addresses the two-stage transmission network expansion planning problem considering a dynamic robust approach, in which investment decisions can be made in different years of the planning horizon. In contrast to previous multi-year approaches, we focus on modeling the non-convex and inter-temporal operation of technologies such as storage facilities, whose performance promotes the incorporation of renewable generating units into power systems. An adaptive robust optimization approach is considered to model the uncertainty in, for instance, the maximum power consumption of loads. Furthermore, representative days are used to model the operational variability of electrical demand and the production of climate-based renewable generating units. We propose combining acceleration techniques with the nested column-and-constraint generation algorithm to tackle the resulting problem. Numerical results show that the use of the proposed model leads to reductions in the total worst-case cost of up to 5% in comparison with a static approach.
- 5 September 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- Vol. 177, 1-6
Dynamic Robust Transmission Network Expansion Planning in Renewable Dominated Power Systems Considering Inter-Temporal and Non-Convex Operational Constraints
This paper addresses the two-stage transmission network expansion planning problem considering a dynamic robust approach, in which investment decisions can be made in different years of the planning horizon. In contrast to previous multi-year approaches, we focus on modeling the non-convex and inter-temporal operation of technologies such as storage facilities, whose performance promotes the incorporation of renewable generating units into power systems. An adaptive robust optimization approach is considered to model the uncertainty in, for instance, the maximum power consumption of loads. Furthermore, representative days are used to model the operational variability of electrical demand and the production of climate-based renewable generating units. We propose combining acceleration techniques with the nested column-and-constraint generation algorithm to tackle the resulting problem. Numerical results show that the use of the proposed model leads to reductions in the total worst-case cost of up to 5% in comparison with a static approach.
- Open Access
- 1 July 2022
- Published by Elsevier in Sustainable Energy, Grids and Networks
- Vol. 32
Expansion planning of a price-maker virtual power plant in energy and reserve markets
- 1 July 2022
- Published by Elsevier in Sustainable Energy, Grids and Networks
- Vol. 32
Open AccessExpansion planning of a price-maker virtual power plant in energy and reserve markets
- 14 February 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 37 (6) , 4325-4339
Priority Chronological Time-Period Clustering for Generation and Transmission Expansion Planning Problems With Long-Term Dynamics
The increasing incorporation of renewable generating units into power systems has made it imperative to model variabilities during the resolution of generation and transmission expansion planning problems. This is commonly carried out by considering representative time periods, which are attained using clustering techniques, since the use of all historical data may involve computationally intractable problems. The chronological information concerning the input data should be maintained when representative time periods are used to model inter-temporal constraints. This is the case of long-term storage, which may be critical as regards mitigating the fluctuations related to renewable production. Recent clustering techniques have resolved this drawback at the cost of not ensuring the feasibility of the problem or underestimating extreme values of input data, which may influence investment decisions. This paper proposes a new clustering method that is based on previous techniques, maintains the chronological information regarding the input data throughout the entire time horizon and assigns more priority to the representation of extreme values. Numerical results show that the use of the proposed clustering method involves a reduction in the computational burden, since investment plans closer to the optimal solution are attained while considering less representative time periods than occurs with other methods.
- 14 February 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 37 (6) , 4325-4339
Priority Chronological Time-Period Clustering for Generation and Transmission Expansion Planning Problems With Long-Term Dynamics
The increasing incorporation of renewable generating units into power systems has made it imperative to model variabilities during the resolution of generation and transmission expansion planning problems. This is commonly carried out by considering representative time periods, which are attained using clustering techniques, since the use of all historical data may involve computationally intractable problems. The chronological information concerning the input data should be maintained when representative time periods are used to model inter-temporal constraints. This is the case of long-term storage, which may be critical as regards mitigating the fluctuations related to renewable production. Recent clustering techniques have resolved this drawback at the cost of not ensuring the feasibility of the problem or underestimating extreme values of input data, which may influence investment decisions. This paper proposes a new clustering method that is based on previous techniques, maintains the chronological information regarding the input data throughout the entire time horizon and assigns more priority to the representation of extreme values. Numerical results show that the use of the proposed clustering method involves a reduction in the computational burden, since investment plans closer to the optimal solution are attained while considering less representative time periods than occurs with other methods.
- 18 March 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 36 (4) , 3802-3805
Enhanced Representative Time Periods for Transmission Expansion Planning Problems
The use of historical data in transmission network expansion planning problems is key to represent the short-term uncertainties in demand and stochastic renewable production conditions. Nevertheless, the use of all available historical data leads to intractable problems. For this reason, input data should be reduced while keeping important information about the system under study. Several clustering methods have been used in the technical literature for this purpose, but these generally do not represent extreme conditions such as peak demand levels, which may be critical to avoid load shedding. This letter proposes a novel approach to obtain representative time periods based on the maximum dissimilarity algorithm, which properly represents these extreme conditions. Numerical results show that the load is completely supplied using the proposed technique in all cases and that the number of required representative time periods is significantly reduced in comparison with other techniques, which translates into a reduction of the complexity of the transmission expansion planning problem.
- 18 March 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 36 (4) , 3802-3805
Enhanced Representative Time Periods for Transmission Expansion Planning Problems
The use of historical data in transmission network expansion planning problems is key to represent the short-term uncertainties in demand and stochastic renewable production conditions. Nevertheless, the use of all available historical data leads to intractable problems. For this reason, input data should be reduced while keeping important information about the system under study. Several clustering methods have been used in the technical literature for this purpose, but these generally do not represent extreme conditions such as peak demand levels, which may be critical to avoid load shedding. This letter proposes a novel approach to obtain representative time periods based on the maximum dissimilarity algorithm, which properly represents these extreme conditions. Numerical results show that the load is completely supplied using the proposed technique in all cases and that the number of required representative time periods is significantly reduced in comparison with other techniques, which translates into a reduction of the complexity of the transmission expansion planning problem.