José Luis Ponz-Tienda
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Research Interests
José Luis Ponz-Tienda has a total of 43 co-authors. Here are the top co-authors by number of shared publications:
- Eugenio Pellicer
Universitat Politècnica de València
5 shared publications - Laura Gutierrez-Bucheli
Universidad de los Andes
4 shared publications - Adriana Gómez-Cabrera
Department of Civil Engineering, Pontificia Universidad Javeriana, Bogotá 111711, Colombia
2 shared publications Alejandro Salcedo-Bernal
Universidad de los Andes
2 shared publicationsAndrea Victoria Prada-Hernández
University of Maryland
2 shared publications- Carlos Andrés-Romano
Universitat Politècnica de València
2 shared publications
Latest Publications
- Open Access
- 9 September 2020
- Published by MDPI AG in Sustainability
- Vol. 12 (18) , 7377
Identification of Factors Affecting the Performance of Rural Road Projects in Colombia
Rural roads play an indispensable role in economic and social well-being, especially in developing countries, contributing to achieving the Sustainable Development Goals. For this reason, it is necessary to plan these projects properly to guarantee their success. In this line, the objective of this research is to identify significant variables generating overruns in time and cost using empirical data of 535 rural road projects in Colombia from 2015 to 2018. Bivariate analysis, with statistical tools like Spearman’s Rho and Kruskal–Wallis, allowed identifying that higher values of variables like budget and project intensity are related to higher deviations in cost and time. Additionally, it was found that projects with shorter durations are reporting higher time overruns. The worst performers are projects executed in the year that council mayors start their terms, those developed in municipalities with more resources, and those awarded using a competitive bidding process. Multivariate analysis, through Random Forest, assessed the effect of considering all variables interacting simultaneously and ranking them in order of importance. The results demonstrated a relationship between cost and time performance, and that numerical variables are more significant than the categorical ones. This study contributes to a better understanding of the causes of delays and cost overruns on rural roads, providing useful insight for researchers and industry practitioners.
- 9 September 2020
- Published by MDPI AG in Sustainability
- Vol. 12 (18) , 7377
Open AccessIdentification of Factors Affecting the Performance of Rural Road Projects in Colombia
Rural roads play an indispensable role in economic and social well-being, especially in developing countries, contributing to achieving the Sustainable Development Goals. For this reason, it is necessary to plan these projects properly to guarantee their success. In this line, the objective of this research is to identify significant variables generating overruns in time and cost using empirical data of 535 rural road projects in Colombia from 2015 to 2018. Bivariate analysis, with statistical tools like Spearman’s Rho and Kruskal–Wallis, allowed identifying that higher values of variables like budget and project intensity are related to higher deviations in cost and time. Additionally, it was found that projects with shorter durations are reporting higher time overruns. The worst performers are projects executed in the year that council mayors start their terms, those developed in municipalities with more resources, and those awarded using a competitive bidding process. Multivariate analysis, through Random Forest, assessed the effect of considering all variables interacting simultaneously and ranking them in order of importance. The results demonstrated a relationship between cost and time performance, and that numerical variables are more significant than the categorical ones. This study contributes to a better understanding of the causes of delays and cost overruns on rural roads, providing useful insight for researchers and industry practitioners.
- 6 July 2020
- Published by IGLC
- p. 781-792
Lean Tools Proposal to Mitigate Delays and Cost Overruns in Construction Projects
- 6 July 2020
- Published by IGLC
- p. 781-792
Lean Tools Proposal to Mitigate Delays and Cost Overruns in Construction Projects
- 1 September 2019
- Published by Elsevier in Automation in Construction
- Vol. 105, 102799
Multipurpose linear programming optimization model for repetitive activities scheduling in construction projects
- 1 September 2019
- Published by Elsevier in Automation in Construction
- Vol. 105, 102799
Multipurpose linear programming optimization model for repetitive activities scheduling in construction projects
- Open Access
- 10 January 2019
- Published by Universidad Politecnica de Madrid - University Library in Building & Management
- Vol. 2 (3) , 62-72
Implementation of BIM in infrastructure: the need to address it from the public sector = Implementación de BIM en infraestructura: la necesidad de abordarlo desde el sector público
Implementation of BIM in infrastructure: the need to address it from the public sector = Implementación de BIM en infraestructura: la necesidad de abordarlo desde el sector público
- 10 January 2019
- Published by Universidad Politecnica de Madrid - University Library in Building & Management
- Vol. 2 (3) , 62-72
Open AccessImplementation of BIM in infrastructure: the need to address it from the public sector = Implementación de BIM en infraestructura: la necesidad de abordarlo desde el sector público
Implementation of BIM in infrastructure: the need to address it from the public sector = Implementación de BIM en infraestructura: la necesidad de abordarlo desde el sector público
- Open Access
- 10 January 2019
- Published by Universidad Politecnica de Madrid - University Library in Building & Management
- Vol. 2 (3) , 44-55
Public-private partnerships in the real estate sector in Colombia: risk assessment matrix and risk = Alianzas público privadas en el sector inmobiliario en Colombia: una propuesta de matriz y asignación de riesgos
Public-private partnerships in the real estate sector in Colombia: risk assessment matrix and risk = Alianzas público privadas en el sector inmobiliario en Colombia: una propuesta de matriz y asignación de riesgos
- 10 January 2019
- Published by Universidad Politecnica de Madrid - University Library in Building & Management
- Vol. 2 (3) , 44-55
Open AccessPublic-private partnerships in the real estate sector in Colombia: risk assessment matrix and risk = Alianzas público privadas en el sector inmobiliario en Colombia: una propuesta de matriz y asignación de riesgos
Public-private partnerships in the real estate sector in Colombia: risk assessment matrix and risk = Alianzas público privadas en el sector inmobiliario en Colombia: una propuesta de matriz y asignación de riesgos
- 4 October 2018
- Published by Springer Nature
- p. 815-822
A Methodological Proposal for Risk Analysis in the Construction of Tunnels
- 4 October 2018
- Published by Springer Nature
- p. 815-822
A Methodological Proposal for Risk Analysis in the Construction of Tunnels
- Open Access
- 10 September 2018
- Published by Universidad Politecnica de Madrid - University Library in Building & Management
- Vol. 2 (2) , 5-14
Requirements for a BIM execution plan (BEP): a proposal for application in Colombia = Requisitos para un plan de ejecución de BIM (BEP): propuesta de aplicación en Colombia
The Architecture, Engineering and Construction (AEC) Industry in Colombia is starting to implement Building Information Modeling (BIM) in their projects but in a much unorganized way. This issue could be attributed to a lack of unique and public BIM standards and guidelines for the implementation along with the inexistent support to the industry from the Government on the road to implementation. The BIM Execution Plan (BEP) is a procedural process that outlines the project’s overall vision with implementation details for the project team to follow throughout the project. In this study, the authors reviewed 20 BEPs searching for the presence of some identified and analyzed subcomponents to determine which documents were more robust. By performing a 27-question survey to understand how different BIM tools affect a BIM implementation, we investigated about the experience of some companies in the industry with five in depth interviews conducted to AEC Colombian professionals. Finally, a presentation of a BEP template that uses the analyzed documents and the identified problems in the interviews, along with an explanation of how was the use of information obtained to develop the new BEP template. Conclusions and recommendations are provided to enhance the BIM implementation in Colombia along with the template and the support files that can also help to develop and integrate future BIM process tools methodologies. Resumen La industria de Arquitectura, Ingeniería y Construcción (AEC) en Colombia está empezando a implementar Building Information Modeling (BIM) en sus proyectos, pero de una manera muy desorganizada. Este problema podría atribuirse a la falta de normas y pautas de carácter unificado y público para la implementación de BIM junto con el apoyo inexistente a la industria por parte del gobierno en el camino hacia dicha implementación. El Plan de ejecución BIM (BEP) es un procedimiento enmarcado en procesos BIM que describe la visión general del proyecto con detalles de implementación para que el equipo siga a lo largo del ciclo de vida del proyecto. En este estudio, los autores revisaron 20 BEPs en busca de la presencia de algunos subcomponentes identificados y analizados para determinar qué documentos eran más robustos. Al realizar una encuesta de 27 preguntas para comprender cómo diferentes herramientas BIM afectan su implementación, investigamos sobre la experiencia de algunas empresas en la industria con cinco entrevistas a profundidad realizadas a profesionales colombianos de AEC. Finalmente, hay una presentación de una plantilla de BEP que se basa en los análisis de los resultados y los problemas identificados en las entrevistas, junto con una explicación de cómo se utilizó la información obtenida para desarrollar la nueva plantilla de BEP. Se presentan conclusiones y recomendaciones para mejorar la implementación de BIM en Colombia, además de una plantilla y los archivos de soporte para que cada empresa que...
- 10 September 2018
- Published by Universidad Politecnica de Madrid - University Library in Building & Management
- Vol. 2 (2) , 5-14
Open AccessRequirements for a BIM execution plan (BEP): a proposal for application in Colombia = Requisitos para un plan de ejecución de BIM (BEP): propuesta de aplicación en Colombia
The Architecture, Engineering and Construction (AEC) Industry in Colombia is starting to implement Building Information Modeling (BIM) in their projects but in a much unorganized way. This issue could be attributed to a lack of unique and public BIM standards and guidelines for the implementation along with the inexistent support to the industry from the Government on the road to implementation. The BIM Execution Plan (BEP) is a procedural process that outlines the project’s overall vision with implementation details for the project team to follow throughout the project. In this study, the authors reviewed 20 BEPs searching for the presence of some identified and analyzed subcomponents to determine which documents were more robust. By performing a 27-question survey to understand how different BIM tools affect a BIM implementation, we investigated about the experience of some companies in the industry with five in depth interviews conducted to AEC Colombian professionals. Finally, a presentation of a BEP template that uses the analyzed documents and the identified problems in the interviews, along with an explanation of how was the use of information obtained to develop the new BEP template. Conclusions and recommendations are provided to enhance the BIM implementation in Colombia along with the template and the support files that can also help to develop and integrate future BIM process tools methodologies. Resumen La industria de Arquitectura, Ingeniería y Construcción (AEC) en Colombia está empezando a implementar Building Information Modeling (BIM) en sus proyectos, pero de una manera muy desorganizada. Este problema podría atribuirse a la falta de normas y pautas de carácter unificado y público para la implementación de BIM junto con el apoyo inexistente a la industria por parte del gobierno en el camino hacia dicha implementación. El Plan de ejecución BIM (BEP) es un procedimiento enmarcado en procesos BIM que describe la visión general del proyecto con detalles de implementación para que el equipo siga a lo largo del ciclo de vida del proyecto. En este estudio, los autores revisaron 20 BEPs en busca de la presencia de algunos subcomponentes identificados y analizados para determinar qué documentos eran más robustos. Al realizar una encuesta de 27 preguntas para comprender cómo diferentes herramientas BIM afectan su implementación, investigamos sobre la experiencia de algunas empresas en la industria con cinco entrevistas a profundidad realizadas a profesionales colombianos de AEC. Finalmente, hay una presentación de una plantilla de BEP que se basa en los análisis de los resultados y los problemas identificados en las entrevistas, junto con una explicación de cómo se utilizó la información obtenida para desarrollar la nueva plantilla de BEP. Se presentan conclusiones y recomendaciones para mejorar la implementación de BIM en Colombia, además de una plantilla y los archivos de soporte para que cada empresa que...
- Open Access
- 18 July 2018
- Published by IGLC
- p. 636-646
Choosing by Advantages; Benefits Analysis and Implementation in a Case Study, Colombia
There are many methods of multicriteria decision analysis (MCDA), each one with properties and benefits. In the Architecture, Engineering, and Construction (AEC) sector most of the time, the decision-making involve different interest of the stakeholders of the projects, must of the times applying methods with the focus on the result. This paper presents a case study of a new University's facility construction that compares the traditional decision-making approach used in the design-bid-build procurement method of AEC industry in Colombia with an MCDA approach. Choosing By Advantages (CBA) has been used to analyse the reasons that could help explain why the subcontractor of a project construction was not meeting the client's expectations during project execution. Results include a discussion of main differences between these decision methods, the main difference is that in traditional decision-making approach the main criterion was cost while in the CBA was value. Consequently, the method's results were different for the alternatives.
- 18 July 2018
- Published by IGLC
- p. 636-646
Open AccessChoosing by Advantages; Benefits Analysis and Implementation in a Case Study, Colombia
There are many methods of multicriteria decision analysis (MCDA), each one with properties and benefits. In the Architecture, Engineering, and Construction (AEC) sector most of the time, the decision-making involve different interest of the stakeholders of the projects, must of the times applying methods with the focus on the result. This paper presents a case study of a new University's facility construction that compares the traditional decision-making approach used in the design-bid-build procurement method of AEC industry in Colombia with an MCDA approach. Choosing By Advantages (CBA) has been used to analyse the reasons that could help explain why the subcontractor of a project construction was not meeting the client's expectations during project execution. Results include a discussion of main differences between these decision methods, the main difference is that in traditional decision-making approach the main criterion was cost while in the CBA was value. Consequently, the method's results were different for the alternatives.
- Open Access
- 1 June 2017
- Published by Elsevier in Computer-Aided Civil and Infrastructure Engineering
- Vol. 32 (6) , 474-498
A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags
- 1 June 2017
- Published by Elsevier in Computer-Aided Civil and Infrastructure Engineering
- Vol. 32 (6) , 474-498
Open AccessA Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags
- 30 May 2017
- Published by Springer Nature
- p. 269-288
Marginal Abatement Cost Curves (MACC): Unsolved Issues, Anomalies, and Alternative Proposals
- 30 May 2017
- Published by Springer Nature
- p. 269-288
Marginal Abatement Cost Curves (MACC): Unsolved Issues, Anomalies, and Alternative Proposals