JZJiawu Zhu

Jiawu Zhu

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Jiawu Zhu has a total of 41 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Design and optimization of high-precision integrated experimental environments for large scientific facilities

    by Yuyang Shi, Liangbing Hu, Jiali Tang, Shilong Li, Jiawu Zhu, Shaolin Zhu, Liangfeng Liu, Hang Zhao, Lei Yu, Jianyuan Xu, et al.

    This study focuses on designing a high-precision laboratory for the Shenzhen superconducting soft x-ray free electron laser, addressing the stringent control requirements for temperature, humidity, and airflow that exceed conventional design methods. Using computational fluid dynamics simulation, we optimize airflow and temperature distribution to meet standards of 23 ± 0.1 °C, 37.5% ± 5% humidity, and air velocity under 0.1 m/s. The paper evaluates supply air temperature fluctuations and proposes technical measures to enhance stability, ensuring a controlled environment for advanced experiments.

  • Further Development of the W7-X Magnet System Finite Element Global Model in Preparation for Enhanced Operation Phase

    by J. Zhu, V. Bykov, L. Wegener, H.-S. Bosch

    The Wendelstein 7-X (W7-X) stellarator equipped with a large cryogenic magnet system (MS) has been enhanced for the long pulse operation at the Max-Planck-Institute for Plasma Physics in Greifswald, Germany. In parallel with the process, the MS global finite element model (GM) has been developed further to consider two interrelated issues: i) the effect of winding pack (WP) embedding (EB) process and ii) planar coil case pins and bolts plastification. The procedure of implementing the EB effect in ANSYS is based on the death/birth feature of particular elements, special fixation algorithm and careful check of the unavoidable artificial stress level. The approach to get a refined prediction of plastic strain/ stress levels for multiple pins and bolts uses the detailed local pin/bolt models to check the GM stiffness representation and to deliver the target values using an interpolation procedure. If the main focus during first two experimental campaigns, for roughly 13 months, was on the static structural strength of the MS, the issue of cyclic behavior is addressed in the updated GM post-processing procedure. The post-processing routine predicts how many electromagnetic cycles and cool down-warm up cycles with particular loading patterns could be safely withstood with required margins by the system components. This paper is focusing on the structural cyclic behavior modelling of the W7-X magnet system components. Several related issues are addressed, such as: 1) Specific features of winding pack embedding modelling, 2) Reasonably simplified modeling of multiple pins and bolts in the GM, 3) Preliminary assessment of coil case pin failure. In addition, lessons learned so far regarding the gradual modifications of the GM are also summarized briefly.


  • Cyclic Behavior of Wendelstein 7-X Magnet System During First Two Phases of Operation

    by Victor Bykov, Jiawu Zhu, Andre Carls, Bernd Hein, Konrad Risse, Paul van Eeten, Hans-Stephan Bosch, Lutz Wegener

    The sophisticated large magnet system of the Wendelstein 7-X (W7-X) stellarator has been operated during first two experimental campaigns at the Max-Planck-Institute for Plasma Physics in Greifswald, Germany, for roughly 13 months. Its 70 superconducting coils (NbTi CCIC) are extraordinary not only due to complex 3D shapes of 50 non-planar coils, but also due to a non-linear support system. In addition, five big resistive coils with the aim to correct W7-X error fields are installed on the outer cryostat and use rubber pads in their supports to compensate thermal expansion of the coils. The structural behavior of the W7-X magnetic system is monitored and evaluated on the basis of the analysis of the signals from the extended set of mechanical and temperature sensors. Several cooldown/warming up and thousands of electromagnetic cycles with different loading patterns and with up to 70% design load magnitude have been performed by the system successfully. The focus of this paper is on the cyclic structural behavior of the W7-X magnet system and the comparison with finite element predictions. Several related issues such as bolts and rubber pads prestress degradation, support slippage development, evolution of mutual coil displacement, loading path dependence of stress levels, sliding weight support (cryoleg) adjustment, and sensor failure are addressed. Lessons learned so far are also briefly summarized.


  • Backside Protection for Wendelstein 7-X In-Vessel Components

    by Jiawu Zhu, Victor Bykov, Andre John, Lutz Wegener, Hans-Stephan Bosch

    Successful physical experiment campaigns have been performed on the most advanced modular stellarator Wendelstein 7-X (W7-X) during the second operation phase (OP1.2). The completion phase (CP2) lasting until 2021 is devoted to the installation of cryo-vacuum pumps (CVPs), new diagnostics, and actively cooled in-vessel components instead of the inertially cooled ones used in OP1.2. This update allows us to move forward to achieve the steady state operation during the next operation phase (OP2). Several first wall components which are exposed to heat flux in the range from 250 to 500 kW/m² are covered by graphite tiles facing the plasma. Due to construction constraints, the backside area of the graphite tiles is not fully covered by the actively cooled CuCrZr heat sinks. This results in the presence of high-temperature graphite rims, which become an additional heat radiation source for the components behind the first wall. This article presents stepwise development of backside protections (BSPs) to mitigate the problem mentioned above. The process is supported by: 1) the study of BSP shielding performances through thermal analysis taking into account plasma radiation and electron-cyclotron resonance heating (ECRH) loads; 2) BSP sizing restricted by electromagnetic forces during main coil/plasma current decay; and 3) mechanical analysis to confirm the structural fixation of BSP. In addition, several analysis iterations for CVP have been repeated to minimize BSP cost by identification of first wall components with minor heat radiation to the CVP and marginal influence on its cooling system capacity.


  • Open Access

    Multiphysics analysis of W7-X control coils

    by Jiawu Zhu, Victor Bykov, Gunnar Ehrke, Boris Mendelevitch, Dirk Naujoks, Lutz Wegener, Hans-Stephan Bosch


  • Open Access

    Engineering Challenges of Wendelstein 7-X Mechanical Monitoring During Second Phase of Operation

    by V. Bykov, Jiawu Zhu, A. Carls, Ilia Ivashov, J. Geiger, B. Hein, H.-S. Bosch, L. Wegener

    The largest modular stellarator, the Wendelstein 7-X (W7-X), has completed its second phase of operation, OP1.2, in Greifswald, Germany. The inertially cooled divertor installed between mid-2016 and mid-2017 has allowed a wider range of plasma configurations in comparison with the first operation phase, OP1. The sophisticated W7-X superconducting magnet system is further loaded up to 70% of its maximum design loads for all main components. The extensive set of mechanical sensors clearly shows a highly nonlinear system response, which is in rather good correspondence with the predictions from the available advanced numerical models. However, there are also significant deviations observed in several areas. Therefore, modeling improvements and/or parameter variation analyses are necessary to clarify the issues in preparation for the upcoming, more demanding phase OP2 (2021+) with the actively cooled divertor and longer plasma pulses to guarantee safe and reliable W7-X operation. The updated strategy to release multiple new plasma configurations being compatible with W7-X component design values is described briefly. In this approach, the numerical model linearization in the vicinity of an accurately analyzed point is a key method to accelerate the process and to highlight areas for vacuum field parameters not allowed for plasma operation due to structural criticality. A brief overview of the W7-X measurement results, the observed deviations with numerical models, and the implemented improvements, as well as the lessons learned so far, are presented.


  • Refined Multiphysics Analysis of W7-X Cryopumps

    by Jiawu Zhu, Victor Bykov, Michael Nagel, Gunnar Ehrke, Joris Fellinger, Lutz Wegener, Hans-Stephan Bosch

    Ten identical cryopumps (CVPs) are to be installed in corresponding divertor volumes of Wendelstein 7-X (W7-X) stellarator before commencing the steady-state phase of operation (OP 2). Each CVP is typically made of two units connected by a transfer line and is fed through a dedicated vacuum vessel feed through. The units consist of water baffle, liquid nitrogen (LN₂) baffle, helium panel, and LN₂-cooled housing. All components are expected to be well cooled with the available cooling capacity during long-pulse plasma operation in order to maintain the helium panel at about 4 K and hence ensure the desired absorption rate. The LN₂-cooled housing has to minimize both the effect of electron-cyclotron resonance heating (ECRH) and the thermal radiation from backside of in-vessel components on the 80-K CVP shield elements. Moreover, the ECRH is unevenly distributed in W7-X, which requires analyses of several cases and sophisticated cooling scheme as described. This paper presents the thermal behavior of CVP components and is followed by the discussion of several important issues for assessment. In addition, eddy current and electromagnetic (EM) forces on CVP copper components are analyzed for the events of fast discharge (FD) of main superconducting coils, plasma current decay, alternating current in control coils, and FD of trim coils. Moreover, sharing of eddy currents between plasma vessel shell and attached CVP is estimated. Structural analysis taking temperature gradients and EM forces into account indicates that the mechanical performance is acceptable.


  • Mechanical Monitoring Issues in Preparation to Next Step of Wendelstein 7-X Operation

    by Victor Bykov, Andre Carls, Jiawu Zhu, Paul van Eeten, Lutz Wegener, Hans-Stephan Bosch

    The largest modular stellarator Wendelstein 7-X (W7-X) has successfully passed the first phase of operation in Greifswald, Germany. The sophisticated W7-X superconducting magnet system (MS) with its nonlinear support system has been carefully monitored using an extensive set of mechanical and temperature sensors. This paper focuses on detailed consideration of cyclic MS behavior during operation with limiter configurations of plasma. Measurement results are carefully compared with predictions from updated numerical models and critical issues are highlighted. As a result, the structural monitoring tool is extended to follow enhanced requirements and expectations. This paper is a preparation for upcoming more demanding phases with longer plasma pulses to guarantee safe and reliable W7-X operation with different divertor and scraper element configurations. The procedure to establish required sensor configurations, and to analyze and release new plasma regimes being compatible with W7-X component design values is also described.


  • Increased expression and dysregulated association of restriction factors and type I interferon in HIV, HCV mono‐ and co‐infected patients

    by Jia‐Wu Zhu, Feng‐Liang Liu, Dan Mu, De‐Yao Deng, Yong‐Tang Zheng

    Host restriction factors and type I interferon are important in limiting HIV and HCV infections, yet the role of HIV, HCV mono‐ and co‐infection in regulating these antiviral genes expression is not clear. In this study, we measured the levels of TRIM5α, TRIM22, APOBEC3G, and IFN‐α, ‐β mRNA expression in peripheral blood mononuclear cells of 43 HIV mono‐infected, 70 HCV mono‐infected and 64 HIV/HCV co‐infected patients along with 98 healthy controls. We also quantified HIV and HCV viral loads in mono‐ and co‐infected patients. The results showed that HCV, HIV mono‐ and co‐infection differentially increased TRIM22, APOBEC3G, and IFN‐α, ‐β mRNA expression while the mRNA expression of TRIMα was upregulated only by HCV‐mono infection. HIV/HCV co‐infection was associated with higher viral load, compared to either HIV or HCV mono‐infection. Additionally, we showed TRIMα and TRIM22 positively correlated with IFN‐α, ‐β, which could be dysregulated by HIV, HCV mono‐ and co‐infection. Furthermore, we found TRIM22 negatively correlated with HCV viral load in mono‐infected patients and APOBEC3G positively correlated with HCV viral load in co‐infected patients. Collectively, our findings suggest the potential role of restriction factors in restricting HIV, HCV mono‐ and co‐infection in vivo, which appears to be a therapeutic target for potential drug discovery. J. Med. Virol. 88:987–995, 2016.