Martin Philip Kidd
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Martin Philip Kidd has a total of 17 co-authors. Here are the top co-authors by number of shared publications:
- Fabio Furini
Department of Computer, Control, and Management Engineering “Antonio Ruberti”, Sapienza University of Rome, 00185 Rome, Italy
5 shared publications Paolo Toth
Department of Electrical, Electronic and Information Engineering, University of Bologna, 40100 Bologna, Italy
4 shared publicationsCarlo Alfredo Persiani
2 shared publications- Jesper Larsen
Technical University of Denmark
2 shared publications - Lucas P. Veelenturf
Eindhoven University of Technology
2 shared publications - Richard Martin Lusby
Department of Management Engineering, Technical University of Denmark, Kgs. Lyngby, Denmark
2 shared publications
Latest Publications
- Open Access
- 1 January 2021
- Published by FapUNIFESP (SciELO) in Pesquisa Operacional
- Vol. 41 (spe)
INTEGRATED PRODUCTION-DISTRIBUTION SYSTEMS: TRENDS AND PERSPECTIVES
During the last two decades, integrated production-distribution problems have attracted a great deal of attention in the operations research literature. Within a short period, a large number of papers have been published and the field has expanded dramatically. The purpose of this paper is to provide a comprehensive review of the existing literature by classifying the existing models into several different categories based on multiple characteristics. The paper also discusses some trends and list promising avenues for future research.
- 1 January 2021
- Published by FapUNIFESP (SciELO) in Pesquisa Operacional
- Vol. 41 (spe)
Open AccessINTEGRATED PRODUCTION-DISTRIBUTION SYSTEMS: TRENDS AND PERSPECTIVES
During the last two decades, integrated production-distribution problems have attracted a great deal of attention in the operations research literature. Within a short period, a large number of papers have been published and the field has expanded dramatically. The purpose of this paper is to provide a comprehensive review of the existing literature by classifying the existing models into several different categories based on multiple characteristics. The paper also discusses some trends and list promising avenues for future research.
- 1 May 2020
- Published by Elsevier in Computers & Operations Research
- Vol. 117
Equidistant representations: Connecting coverage and uniformity in discrete biobjective optimization
- 1 May 2020
- Published by Elsevier in Computers & Operations Research
- Vol. 117
Equidistant representations: Connecting coverage and uniformity in discrete biobjective optimization
- 1 May 2019
- Published by Elsevier in Transportation Research Part C: Emerging Technologies
- Vol. 102, 136-152
Passenger- and operator-oriented scheduling of large railway projects
- 1 May 2019
- Published by Elsevier in Transportation Research Part C: Emerging Technologies
- Vol. 102, 136-152
Passenger- and operator-oriented scheduling of large railway projects
- 1 August 2016
- Published by Institute for Operations Research and the Management Sciences (INFORMS) in Transportation Science
- Vol. 50 (3) , 841-862
A Railway Timetable Rescheduling Approach for Handling Large-Scale Disruptions
On a daily basis, large-scale disruptions require infrastructure managers and railway operators to reschedule their railway timetables together with their rolling stock and crew schedules. This research focuses on timetable rescheduling for passenger train services on a macroscopic level in a railway network. An integer linear programming model is formulated for solving the timetable rescheduling problem, which minimizes the number of cancelled and delayed train services while adhering to infrastructure and rolling stock capacity constraints. The possibility of rerouting train services to reduce the number of cancelled and delayed train services is also considered. In addition, all stages of the disruption management process (from the start of the disruption to the time the normal situation is restored) are taken into account. Computational tests of the described model on a heavily used part of the Dutch railway network show that the model is able to find optimal solutions in short computation times. This makes the approach applicable for use in practice.
- 1 August 2016
- Published by Institute for Operations Research and the Management Sciences (INFORMS) in Transportation Science
- Vol. 50 (3) , 841-862
A Railway Timetable Rescheduling Approach for Handling Large-Scale Disruptions
On a daily basis, large-scale disruptions require infrastructure managers and railway operators to reschedule their railway timetables together with their rolling stock and crew schedules. This research focuses on timetable rescheduling for passenger train services on a macroscopic level in a railway network. An integer linear programming model is formulated for solving the timetable rescheduling problem, which minimizes the number of cancelled and delayed train services while adhering to infrastructure and rolling stock capacity constraints. The possibility of rerouting train services to reduce the number of cancelled and delayed train services is also considered. In addition, all stages of the disruption management process (from the start of the disruption to the time the normal situation is restored) are taken into account. Computational tests of the described model on a heavily used part of the Dutch railway network show that the model is able to find optimal solutions in short computation times. This makes the approach applicable for use in practice.
- 20 January 2015
- Published by Springer Nature in Journal of Scheduling
- Vol. 18 (5) , 435-447
Improved rolling horizon approaches to the aircraft sequencing problem
- 20 January 2015
- Published by Springer Nature in Journal of Scheduling
- Vol. 18 (5) , 435-447
Improved rolling horizon approaches to the aircraft sequencing problem
- 22 July 2014
- Published by Springer Nature
- p. 267-279
State Space Reduced Dynamic Programming for the Aircraft Sequencing Problem with Constrained Position Shifting
- 22 July 2014
- Published by Springer Nature
- p. 267-279
State Space Reduced Dynamic Programming for the Aircraft Sequencing Problem with Constrained Position Shifting
- 22 July 2014
- Published by Springer Nature
- p. 267-279
State Space Reduced Dynamic Programming for the Aircraft Sequencing Problem with Constrained Position Shifting
- 22 July 2014
- Published by Springer Nature
- p. 267-279
State Space Reduced Dynamic Programming for the Aircraft Sequencing Problem with Constrained Position Shifting
- Top Cited Papers
- 1 May 2014
- Published by Elsevier in Transportation Research Part B: Methodological
- Vol. 63, 15-37
An overview of recovery models and algorithms for real-time railway rescheduling
- 1 May 2014
- Published by Elsevier in Transportation Research Part B: Methodological
- Vol. 63, 15-37
Top Cited PapersAn overview of recovery models and algorithms for real-time railway rescheduling
- 1 June 2013
- Published by Elsevier in Electronic Notes in Discrete Mathematics
- Vol. 41, 205-212
A fast heuristic approach for train timetabling in a railway node
- 1 June 2013
- Published by Elsevier in Electronic Notes in Discrete Mathematics
- Vol. 41, 205-212
A fast heuristic approach for train timetabling in a railway node