  • Improving gypsum production quality through human factors, real-time monitoring and standardized operating procedures in the dewatering system

    by Laith A. Hadidi, Ahmet Kolus, Ahmad Islami, Mohamed Noomane N. Darghouth

    Purpose: This study aims to examine how human factors (HF), real-time monitoring and standardized operating procedures can improve quality and reliability in the gypsum dewatering system of a chemical plant experiencing frequent unplanned shutdowns. Design/methodology/approach: The quality improvement through ergonomics (QUITE) methodology was applied through operator interviews, plant observations, value stream mapping, critical-to-quality analysis, maintenance records, Pareto analysis, Ishikawa analysis and five-Whys analysis. The assessment identified four contributors to unplanned shutdowns: vacuum and conveyor belt failures, inadequate preventive maintenance and maintenance strategy, difficulty in maintaining stable process operation and delayed operator responses. The implemented interventions were digital control system (DCS)-based real-time monitoring and standardized operating procedures. Findings: Breakdown failures decreased by 56%, from 80 failures in the fourth quarter of the baseline year to 35 failures in the same quarter of the following year. The interventions improved system visibility, operator responsiveness, work standardization and process stability. Originality/value: The study extends prior QUITE applications to gypsum dewatering by integrating human factors assessment with DCS-based monitoring and standard operating procedure implementation.

  • Open Access

    Assessing and comparing carbon emissions in the construction industry: A comprehensive methodological review and insights

    by Salih D. Abdulahi, Laith A. Hadidi, Rida Assaggaf, Awsan Mohammed, Firas M. Tuffaha, Muhammad Asif

  • Factors influencing change orders in oil and gas construction projects in Saudi Arabia

    by Sadeq J. Alkhalifah, Firas M. Tuffaha, Laith A. Al Hadidi, Ahmad Ghaithan

    Purpose: The oil and gas construction projects in Saudi Arabia are commonly impacted by the frequent occurrence of change orders. Therefore, this study aims at determining the factors influencing change orders in the oil and gas construction projects in Saudi Arabia.Design/methodology/approach: Firstly, the factors are extracted by examining the literature and further refined through experts' feedback. Twenty-one factors were identified in this manner. Thirdly, the factors are prioritized using a questionnaire survey. Responses from 162 professionals have been collected through surveys and ranked using the significance index. The correlation between factor rankings between classes is assessed using Spearman's correlation coefficient. Lastly, using principal component analysis, a change order-related factors conceptual model is developed.Findings: The five most significant factors were identified and ranked in a general manner or per the category involved. Four main types were involved: project management team (PMT), consultants, contractors and clients. Moreover, a change order-related factors model is proposed. The factors are grouped under four main groups: project definition and planning factors, project stakeholder-related factors, project execution-related factors and project performance and control factors.Originality/value: Despite the vast factor-related literature in Saudi Arabia. Nevertheless, there has never been a study that investigates the factors influencing change orders in oil and gas projects in Saudi Arabia before. This study not only identifies the change order-related factors but also proposes a model that captures the importance of these factors. This model can aid project professionals in mitigating the impact of the most critical factors encountered during the various phases of the project.


  • Is the construction site a safer place under the USACE or local government guidelines? The case of Afghanistan

    by Mohammad Hashim Ibrahimkhil, Laith Hadidi

    Purpose: The aim of this paper is to assess the safety level of construction sites in Afghanistan following the US Army Corps of Engineers (USACE) safety practices and compare this with other construction sites in Afghanistan that follow local government safety guidelines. The USACE oversees and funds many infrastructure projects in Afghanistan, and these projects are supposed to follow the same standards implemented in the USA, including safety standards. The local government of Afghanistan also funds infrastructure projects in Afghanistan; however, these do not follow USACE best practices. This research explores the question of whether the USACE standards provide a safer construction site. The effect of the USACE standards on safety practices in construction projects is also investigated in the Afghanistan construction industry.Design/methodology/approach: A literature review and other safety checklists were used to develop a safety checklist containing 104 items (questions) in 17 categories. Subsequently, the checklist was used to assess the safety performance of 57 construction projects (25 USACE projects, and 32 governmental projects). Utilizing quantitative analysis, the Spearman rank correlation coefficient (Rho) and Mann–Whitney tests were carried out for correlation and statistical disparity between USACE and governmental projects.Findings: The safety performance level of Afghan government projects was found to be poor in relation to other developing countries, while in USACE projects it was excellent. In addition, fire prevention, safety administration, PPE, heavy equipment, and handling and storage of materials for all types of contractors were the most overlooked aspects of Afghan Government projects.Practical implications: The findings clearly demonstrate the deficiencies in construction sites observed during this study and also support the adoption of USACE standards in Afghanistan projects.Originality/value: To the best of the authors’ knowledge, this study is the first to investigate the safety of construction sites in Afghanistan. The study also demonstrates the benefits of adopting international standards (USACE) to improve the safety of construction sites in a developing country such as Afghanistan. The findings provide evidence of the safety of the Afghanistan construction industry compared to other developing countries. These findings will contribute to the Afghan Government's efforts to track injury statistics.


  • Open Access

    Impact of Industry 4.0 and Lean Manufacturing on the Sustainability Performance of Plastic and Petrochemical Organizations in Saudi Arabia

    by Ahmed Ghaithan, Mohammed Khan, Awsan Mohammed, Laith Hadidi

    Plastic and petrochemical industries are lagging behind in terms of environmental sustainability performance because of the nature of these industries. Although plastic and petrochemical industries have adopted lean manufacturing and/or Industry 4.0 technologies, more efforts are needed to enhance sustainable development. The purpose of this study is to explore the integrated impact of Industry 4.0 technologies and lean manufacturing on the sustainability performance of plastic and petrochemical industries in Saudi Arabia. Moreover, it investigates the casual relationship between Industry 4.0 technologies and sustainability performance as well as the direct linkage between Industry 4.0 and lean manufacturing. A questionnaire is used as the primary instrument for collecting data from 112 plastic and petrochemical organizations. A hypothesized relationship is formulated and then analyzed using the structural equation modeling (SEM) approach. The outcome of the analysis shows that Industry 4.0 and lean manufacturing have a positive impact on sustainability performance. The study also presents a list of valid constructs for Industry 4.0 technologies, lean manufacturing, and sustainability performance. Furthermore, the study shows that the plastic and petrochemical industries in Saudi Arabia acknowledge and recognize the contribution of Industry 4.0 technologies and lean manufacturing principles to the protection of the environment as a dimension of sustainability performance.


  • Open Access

    The Role of Blockchain in Improving the Processes and Workflows in Construction Projects

    by Awsan Mohammed, Ahmad Almousa, Ahmed Ghaithan, Laith A. Hadidi

    Construction is prone to disputes similar to other business dealings. Construction delays are the most common causes of disputes in construction projects. Most of the time, construction projects are delayed not only because of a lack of funding, but also because of disputes between the contractor and the client. Blockchain Technologies (BCT) have the potential to make the construction industry more efficient, inexpensive, or completely automated. In this paper, an extensive literature review is conducted to locate authoritative sources about the most common applications of blockchain technology in the construction industry. The study aims to identify the potential, benefits, challenges, and uses of blockchain in the construction industry. Furthermore, this paper explores the roles of BCTs in improving and enhancing the workflow efficiency of construction projects. In addition, this paper identifies the major causes of disputes and delays in the construction industry. These causes were used as the baseline for identifying the most relevant solutions provided by blockchain technologies to develop a matching model to find applicable solutions from the literature cases to resolve the identified causes of disputes and delays. The research findings indicated that the common cases of BCT including administrative purposes, smart contracts for transactions, permanent transaction records, and permanent ownership records contribute to solving the causes of disputes and delays in construction projects. The findings of this paper recommend that both public and private stakeholders in the construction sector adopt blockchain technologies and blockchain-based Building Information Models (BIMs) to improve construction workflows and processes.


  • Toward an understanding of BPR perception in the construction industry: the employee attitude toward job enlargement and enrichment in Saudi Arabia

    by Laith Hadidi, Ahmad Abzakh

    Purpose: Business process reengineering (BPR) is a management improvement tool that entails radical changes to organizations' core processes, culture and legacy systems. Although BPR initiatives are favored by many mangers, employees on the other hand, perceive BPR as a potential threat to lose their jobs. This research aims to enhance the employee perception toward BPR implementation in the construction industry as BPR asks for job enlargement (number of different tasks) and enrichment (degree of responsibility) and doesn’t target the workforce downsizing by itself.Design/methodology/approach: The research is conducted in Saudi Arabia by involving experienced construction industry practitioners in a survey questionnaire and semi-structured interviews to gain an insightful perception toward BPR constituents. BPR asks for job enlargement (number of different tasks) and enrichment (degree of responsibility). The survey questionnaire is verified from the literature related to BPR and pilot study through experienced construction practitioners. The experts validated the findings.Findings: The findings of this research reveal a general positive acceptance toward BPR constituents in construction industry. Jobs enrichment and enlargement should be approached: by integrating IT with business functions (especially communication); developing flexible management systems; and encouraging and empowering employees to generate value through their jobs with more delegated authority.Originality/value: The work is one of the few studies to address the concept of Business Process Reengineering in the construction industry. We explore two research questions as detailed in the submission (BPR perception in the construction industry, and how to have a successful BPR by job enlargement and enrichment. The methods can be extended to other industries and in different parts in the world.