Mirko Kück
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Mirko Kück has a total of 18 co-authors. Here are the top co-authors by number of shared publications:
- Michael Freitag
BIBA—Bremer Institut für Produktion und Logistik GmbH, University of Bremen, Hochschulring 20, 28359 Bremen, Germany
11 shared publications - Enzo Morosini Frazzon
Federal University of Santa Catarina
8 shared publications - Bernd Scholz-Reiter
University of Bremen and BIBA
4 shared publications - Matheus Eduardo Leusin
Univ Bremen, Fac Business Studies & Econ, Max Von Laue Str 1, D-28359 Bremen, Germany
2 shared publications Torsten Hildebrandt
SimPlan AG, Niederlassung Nord, Hochschulring 20, 28359 Bremen, Germany
2 shared publicationsAndre Albrecht
Industrial and Systems Engineering Department, Federal University of Santa Catarina, Florianopolis, Brazil
1 shared publication
Latest Publications
- Open Access
- 16 November 2018
- Published by MDPI AG in Technologies
- Vol. 6 (4) , 107
Solving the Job-Shop Scheduling Problem in the Industry 4.0 Era
Technological developments along with the emergence of Industry 4.0 allow for new approaches to solve industrial problems, such as the Job-shop Scheduling Problem (JSP). In this sense, embedding Multi-Agent Systems (MAS) into Cyber-Physical Systems (CPS) is a highly promising approach to handle complex and dynamic JSPs. This paper proposes a data exchange framework in order to deal with the JSP considering the state-of-the-art technology regarding MAS, CPS and industrial standards. The proposed framework has self-configuring features to deal with disturbances in the production line. This is possible through the development of an intelligent system based on the use of agents and the Internet of Things (IoT) to achieve real-time data exchange and decision making in the job-shop. The performance of the proposed framework is tested in a simulation study based on a real industrial case. The results substantiate gains in flexibility, scalability and efficiency through the data exchange between factory layers. Finally, the paper presents insights regarding industrial applications in the Industry 4.0 era in general and in particular with regard to the framework implementation in the analyzed industrial case.
- 16 November 2018
- Published by MDPI AG in Technologies
- Vol. 6 (4) , 107
Open AccessSolving the Job-Shop Scheduling Problem in the Industry 4.0 Era
Technological developments along with the emergence of Industry 4.0 allow for new approaches to solve industrial problems, such as the Job-shop Scheduling Problem (JSP). In this sense, embedding Multi-Agent Systems (MAS) into Cyber-Physical Systems (CPS) is a highly promising approach to handle complex and dynamic JSPs. This paper proposes a data exchange framework in order to deal with the JSP considering the state-of-the-art technology regarding MAS, CPS and industrial standards. The proposed framework has self-configuring features to deal with disturbances in the production line. This is possible through the development of an intelligent system based on the use of agents and the Internet of Things (IoT) to achieve real-time data exchange and decision making in the job-shop. The performance of the proposed framework is tested in a simulation study based on a real industrial case. The results substantiate gains in flexibility, scalability and efficiency through the data exchange between factory layers. Finally, the paper presents insights regarding industrial applications in the Industry 4.0 era in general and in particular with regard to the framework implementation in the analyzed industrial case.
- 1 January 2018
- Published by Elsevier in IFAC-PapersOnLine
- Vol. 51 (11) , 1459-1464
Potential of a Multi-Agent System Approach for Production Control in Smart Factories
- 1 January 2018
- Published by Elsevier in IFAC-PapersOnLine
- Vol. 51 (11) , 1459-1464
Potential of a Multi-Agent System Approach for Production Control in Smart Factories
- Open Access
- 1 January 2018
- Published by Elsevier in Procedia CIRP
- Vol. 72, 520-525
Towards a simulation-based optimization approach to integrate supply chain planning and control
- 1 January 2018
- Published by Elsevier in Procedia CIRP
- Vol. 72, 520-525
Open AccessTowards a simulation-based optimization approach to integrate supply chain planning and control
- 1 January 2018
- Published by Elsevier in CIRP Annals
- Vol. 67 (1) , 515-518
Data-driven production control for complex and dynamic manufacturing systems
- 1 January 2018
- Published by Elsevier in CIRP Annals
- Vol. 67 (1) , 515-518
Data-driven production control for complex and dynamic manufacturing systems
- 1 December 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 3852-3863
Towards adaptive simulation-based optimization to select individual dispatching rules for production control
Due to the increasing complexity of contemporary production scheduling problems, it is generally not possible to calculate nearly optimal production schedules in an acceptable amount of time. Hence, normally, dispatching rules are used to determine the job sequences. However, the selection of suitable dispatching rules is not a trivial task and depends on the relevant key performance indicators. Moreover, the suitability of dispatching rules changes over time because of the stochastic and dynamic nature of manufacturing systems. This paper proposes an adaptive simulation-based optimization approach to select individual dispatching rules for production control. The paper's contribution is two-fold. First, it shows that the proposed approach improves the performance compared to benchmark approaches in a manufacturing scenario from semiconductor industry. Second, in order to be able to react quickly to dynamic changes, it proposes strategies for maintaining information from previously calculated solutions after a change, such as a machine breakdown, occurred.
- 1 December 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 3852-3863
Towards adaptive simulation-based optimization to select individual dispatching rules for production control
Due to the increasing complexity of contemporary production scheduling problems, it is generally not possible to calculate nearly optimal production schedules in an acceptable amount of time. Hence, normally, dispatching rules are used to determine the job sequences. However, the selection of suitable dispatching rules is not a trivial task and depends on the relevant key performance indicators. Moreover, the suitability of dispatching rules changes over time because of the stochastic and dynamic nature of manufacturing systems. This paper proposes an adaptive simulation-based optimization approach to select individual dispatching rules for production control. The paper's contribution is two-fold. First, it shows that the proposed approach improves the performance compared to benchmark approaches in a manufacturing scenario from semiconductor industry. Second, in order to be able to react quickly to dynamic changes, it proposes strategies for maintaining information from previously calculated solutions after a change, such as a machine breakdown, occurred.
- 18 July 2017
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 56 (5) , 2019-2035
Hybrid approach for the integrated scheduling of production and transport processes along supply chains
The rise of new information and communication technologies leads to enhanced information transparency in supply chains. In order to utilise the resulting potentials, novel scheduling approaches that are capable of processing large amounts of data and coping with dynamic disturbances of manufacturing and transport stages have to be developed. For this purpose, the paper at hand proposes a hybrid approach for the integrated scheduling of production and transport processes along supply chains. The procedure combines mixed integer linear programming, discrete event simulation and a genetic algorithm. Obtained results show a significant reduction in the number of late orders, substantiating that proper scheduling approaches combined with information visibility allow for operational improvements in manufacturing supply chains.
- 18 July 2017
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 56 (5) , 2019-2035
Hybrid approach for the integrated scheduling of production and transport processes along supply chains
The rise of new information and communication technologies leads to enhanced information transparency in supply chains. In order to utilise the resulting potentials, novel scheduling approaches that are capable of processing large amounts of data and coping with dynamic disturbances of manufacturing and transport stages have to be developed. For this purpose, the paper at hand proposes a hybrid approach for the integrated scheduling of production and transport processes along supply chains. The procedure combines mixed integer linear programming, discrete event simulation and a genetic algorithm. Obtained results show a significant reduction in the number of late orders, substantiating that proper scheduling approaches combined with information visibility allow for operational improvements in manufacturing supply chains.
- 1 July 2017
- Published by Elsevier in IFAC-PapersOnLine
- Vol. 50 (1) , 7953-7958
Evaluating the Robustness of Production Schedules using Discrete-Event Simulation
- 1 July 2017
- Published by Elsevier in IFAC-PapersOnLine
- Vol. 50 (1) , 7953-7958
Evaluating the Robustness of Production Schedules using Discrete-Event Simulation
- 1 December 2016
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 2820-2831
Potential of data-driven simulation-based optimization for adaptive scheduling and control of dynamic manufacturing systems
The increasing customization of products, which leads to greater variances and smaller lot sizes, requires highly flexible manufacturing systems. These systems are subject to dynamic influences and demand increasing effort for the generation of feasible production schedules and process control. This paper presents an approach for dealing with these challenges. First, production scheduling is executed by coupling an optimization heuristic with a simulation model. Second, real-time system state data, to be provided by forthcoming cyber-physical systems, is fed back, so that the simulation model is continuously updated and the optimization heuristic can either adjust an existing schedule or generate a new one. The potential of the approach was tested by means of a use case embracing a semiconductor manufacturing facility, in which the simulation results were employed to support the selection of better dispatching rules, improving flexible manufacturing systems performance regarding the average production cycle time.
- 1 December 2016
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 2820-2831
Potential of data-driven simulation-based optimization for adaptive scheduling and control of dynamic manufacturing systems
The increasing customization of products, which leads to greater variances and smaller lot sizes, requires highly flexible manufacturing systems. These systems are subject to dynamic influences and demand increasing effort for the generation of feasible production schedules and process control. This paper presents an approach for dealing with these challenges. First, production scheduling is executed by coupling an optimization heuristic with a simulation model. Second, real-time system state data, to be provided by forthcoming cyber-physical systems, is fed back, so that the simulation model is continuously updated and the optimization heuristic can either adjust an existing schedule or generate a new one. The potential of the approach was tested by means of a use case embracing a semiconductor manufacturing facility, in which the simulation results were employed to support the selection of better dispatching rules, improving flexible manufacturing systems performance regarding the average production cycle time.
- 1 July 2016
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1499-1506
Meta-learning with neural networks and landmarking for forecasting model selection an empirical evaluation of different feature sets applied to industry data
Although artificial neural networks are occasionally used in forecasting future sales for manufacturing in industry, the majority of algorithms applied today are univariate statistical time series methods for level, seasonal, trend or trend-seasonal patterns. With different statistical methods created for different time series patterns, large scale applications on 10,000s of times series require automatic method selection, often done manually by human experts based on various time series characteristics, or automatically using error metrics of past performance. However, the task of selecting adequate forecasting methods can also be viewed as a supervised learning problem. For instance, a neural network can be trained as a meta-learner relating characteristic time series features to the ex post accuracy of forecasting methods for each time series. Past research has proposed different sets of time series features for meta-learning including simple statistical or information-theoretic as well as model-based features, but have neglected the use of past forecast errors. This paper studies the predictive accuracy of using different feature sets for a neural network meta-learner selecting between four statistical forecasting models, introducing error-based features (landmarkers) and statistical tests as time series meta-features. A large-scale empirical study on NN3 industry data shows promising results of including error-based feature sets in meta-learning for selecting time series forecasting models.
- 1 July 2016
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1499-1506
Meta-learning with neural networks and landmarking for forecasting model selection an empirical evaluation of different feature sets applied to industry data
Although artificial neural networks are occasionally used in forecasting future sales for manufacturing in industry, the majority of algorithms applied today are univariate statistical time series methods for level, seasonal, trend or trend-seasonal patterns. With different statistical methods created for different time series patterns, large scale applications on 10,000s of times series require automatic method selection, often done manually by human experts based on various time series characteristics, or automatically using error metrics of past performance. However, the task of selecting adequate forecasting methods can also be viewed as a supervised learning problem. For instance, a neural network can be trained as a meta-learner relating characteristic time series features to the ex post accuracy of forecasting methods for each time series. Past research has proposed different sets of time series features for meta-learning including simple statistical or information-theoretic as well as model-based features, but have neglected the use of past forecast errors. This paper studies the predictive accuracy of using different feature sets for a neural network meta-learner selecting between four statistical forecasting models, introducing error-based features (landmarkers) and statistical tests as time series meta-features. A large-scale empirical study on NN3 industry data shows promising results of including error-based feature sets in meta-learning for selecting time series forecasting models.
- Open Access
- 1 January 2016
- Published by Elsevier in Procedia CIRP
- Vol. 41, 520-525
Emergence of Non-predictable Dynamics Caused by Shared Resources in Production Networks
- 1 January 2016
- Published by Elsevier in Procedia CIRP
- Vol. 41, 520-525
Open AccessEmergence of Non-predictable Dynamics Caused by Shared Resources in Production Networks