Friedrich Lackner
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Friedrich Lackner has a total of 228 co-authors. Here are the top co-authors by number of shared publications:
- Frederic Savary
CERN, Geneva, Switzerland
11 shared publications - Susana Izquierdo Bermudez
CERN
10 shared publications - Christian Scheuerlein
European Organization for Nuclear Research
9 shared publications - Davide Tommasini
European Organization for Nuclear Research (CERN), Geneva, Switzerland
9 shared publications - Nicolas Bourcey
CERN, Geneva, Switzerland
9 shared publications - Ezio Todesco
CERN
7 shared publications
Latest Publications
- Open Access
- 9 February 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 36 (3) , 1-5
Development of an Experimental Test Stand and Machine Learning Surrogate Models for Capturing Complex Responses in Pulsed Septa
The complex electromagnetic and structural response of pulsed septum electromagnets is currently being studied, aiming to reveal insights into the prediction of their life cycles. The fault prediction remains a key challenge, requiring efforts in modelling and onsite instrumentation. Recently, a high-fidelity numerical model was developed, which allowed us to deepen our understanding of the system’s behavior. The insight on critical stress/strain conditions are now allowing to better understand early fatigue observations in the coil conductor and required peripheral equipment. As a next step, a numerical parametric study has been conducted, enabling the prediction of the mechanical and electromagnetic dynamic response under different operation conditions. A stringent experimental campaign has been carried out to validate these results. These tests required developing the test setup, including careful selection of non-contact and on-device instrumentation, as well as the data acquisition system. The setup has demonstrated the feasibility of potential implementation in the CERN accelerator complex. In parallel, significant efforts have been made to study the possibility of using Machine Learning (ML) models to reduce the time-consuming simulation process based on analytical solvers. Several custom loss functions reflecting physical constraints, as well as augmentation techniques, have been implemented to overcome the challenge of a strongly limited dataset size. The created ML pipelines and dedicated Graphical User Interface (GUI) are now enabling instantaneous response of the device’s model. The paper will summarize the efforts and project status with the long-term vision to develop a digital twin for septum magnets.
- 9 February 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 36 (3) , 1-5
Open AccessDevelopment of an Experimental Test Stand and Machine Learning Surrogate Models for Capturing Complex Responses in Pulsed Septa
The complex electromagnetic and structural response of pulsed septum electromagnets is currently being studied, aiming to reveal insights into the prediction of their life cycles. The fault prediction remains a key challenge, requiring efforts in modelling and onsite instrumentation. Recently, a high-fidelity numerical model was developed, which allowed us to deepen our understanding of the system’s behavior. The insight on critical stress/strain conditions are now allowing to better understand early fatigue observations in the coil conductor and required peripheral equipment. As a next step, a numerical parametric study has been conducted, enabling the prediction of the mechanical and electromagnetic dynamic response under different operation conditions. A stringent experimental campaign has been carried out to validate these results. These tests required developing the test setup, including careful selection of non-contact and on-device instrumentation, as well as the data acquisition system. The setup has demonstrated the feasibility of potential implementation in the CERN accelerator complex. In parallel, significant efforts have been made to study the possibility of using Machine Learning (ML) models to reduce the time-consuming simulation process based on analytical solvers. Several custom loss functions reflecting physical constraints, as well as augmentation techniques, have been implemented to overcome the challenge of a strongly limited dataset size. The created ML pipelines and dedicated Graphical User Interface (GUI) are now enabling instantaneous response of the device’s model. The paper will summarize the efforts and project status with the long-term vision to develop a digital twin for septum magnets.
- Open Access
- 21 November 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 36 (3) , 1-5
A New Eddy Current Septum Magnet for Fast Extraction from CERN's Proton Synchrotron
A new eddy current septum for the fast extraction from CERN's Proton Synchrotron (PS) has been designed and constructed. This development aims to improve the magnet's reliability, extend its service interval, and reduce radiation exposure for maintenance personnel. The new eddy current device is set to replace the existing direct-drive magnet and its ageing power converter. This paper summarizes the electromagnetic design calculations, the mechanical concept and the subsequent detailed design implementation. It also describes the magnet's construction process and the results from the comprehensive validation tests, including magnetic field measurements, to achieve operational readiness ahead of commissioning in the Proton Synchrotron accelerator.
- 21 November 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 36 (3) , 1-5
Open AccessA New Eddy Current Septum Magnet for Fast Extraction from CERN's Proton Synchrotron
A new eddy current septum for the fast extraction from CERN's Proton Synchrotron (PS) has been designed and constructed. This development aims to improve the magnet's reliability, extend its service interval, and reduce radiation exposure for maintenance personnel. The new eddy current device is set to replace the existing direct-drive magnet and its ageing power converter. This paper summarizes the electromagnetic design calculations, the mechanical concept and the subsequent detailed design implementation. It also describes the magnet's construction process and the results from the comprehensive validation tests, including magnetic field measurements, to achieve operational readiness ahead of commissioning in the Proton Synchrotron accelerator.
- Open Access
- 1 March 2024
- Published by IOP Publishing in Superconductor Science and Technology
- Vol. 37 (4) , 045006
Training-free performance of the wax-impregnated SuShi septum magnet
In the framework of the Future Circular Collider Study a new septum magnet concept, nicknamed ‘SuShi’ has been developed, and a prototype was built at Wigner Research Center for Physics, and tested at the FREIA facility of Uppsala University in April 2023. The concept uses a canted cosine theta (CCT)-like superconducting magnet and a passive superconducting shield to create a zero-field and high-field region within its aperture. SuShi is the first CCT magnet with both of its winding layers simultaneously impregnated with wax. This paper describes the first powering test of the empty magnet at 4.2 K, without the shield being inserted in its aperture. The performance of the magnet, including the observation of quench-back, estimation of hot-spot temperatures and the fraction of energy dissipated in the magnet are presented, and most interestingly the absence of any quench during the entire testing period is reported. Sushi reached its nominal +5% peak field of 3.64 T at 450 A, which corresponds to 80% of the calculated short sample limit along the load line, without training.
- 1 March 2024
- Published by IOP Publishing in Superconductor Science and Technology
- Vol. 37 (4) , 045006
Open AccessTraining-free performance of the wax-impregnated SuShi septum magnet
In the framework of the Future Circular Collider Study a new septum magnet concept, nicknamed ‘SuShi’ has been developed, and a prototype was built at Wigner Research Center for Physics, and tested at the FREIA facility of Uppsala University in April 2023. The concept uses a canted cosine theta (CCT)-like superconducting magnet and a passive superconducting shield to create a zero-field and high-field region within its aperture. SuShi is the first CCT magnet with both of its winding layers simultaneously impregnated with wax. This paper describes the first powering test of the empty magnet at 4.2 K, without the shield being inserted in its aperture. The performance of the magnet, including the observation of quench-back, estimation of hot-spot temperatures and the fraction of energy dissipated in the magnet are presented, and most interestingly the absence of any quench during the entire testing period is reported. Sushi reached its nominal +5% peak field of 3.64 T at 450 A, which corresponds to 80% of the calculated short sample limit along the load line, without training.
- Open Access
- 23 February 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-11
A Combined Testing and Modelling Methodology for the Mechanics of High-Field Superconducting Magnets
The use of superconducting composite cables based on Nb 3 Sn, an intermetallic compound of Niobium and Tin, is one of the favorite routes to reach magnetic fields higher than 10 T in state-of-the-art accelerator magnets. The brittle and nonlinear nature of the epoxy-impregnated Nb 3 Sn Rutherford cable makes challenging to predict its mechanical limits and, consequently, the overall performance of the magnet. In the case of collared magnet structures, peak stresses in coils are usually reached during the collaring procedure performed at room temperature. Hence, it is essential to extensively study stress distribution within the superconducting coils and at their interfaces with other components during this phase. In this context, a combined experimental/numerical methodology was developed at CERN to investigate the effects of the assembling process and geometrical imperfections on the mechanical response of the collared coil of the 11 T HL-LHC dipole. The results of the experimental tests were benchmarked against 3-D non-linear finite element models, using material constitutive laws that mimicked the non-linear responses of the Nb3Sn cable, and embedding geometrical imperfections as measured on the tested components. The proposed methodology, used in the early stages of superconducting magnets development, may help to identify limitations in the mechanical design, and understand the impact of geometrical imperfections and tolerances on stress distribution in the magnet structures.
- 23 February 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-11
Open AccessA Combined Testing and Modelling Methodology for the Mechanics of High-Field Superconducting Magnets
The use of superconducting composite cables based on Nb 3 Sn, an intermetallic compound of Niobium and Tin, is one of the favorite routes to reach magnetic fields higher than 10 T in state-of-the-art accelerator magnets. The brittle and nonlinear nature of the epoxy-impregnated Nb 3 Sn Rutherford cable makes challenging to predict its mechanical limits and, consequently, the overall performance of the magnet. In the case of collared magnet structures, peak stresses in coils are usually reached during the collaring procedure performed at room temperature. Hence, it is essential to extensively study stress distribution within the superconducting coils and at their interfaces with other components during this phase. In this context, a combined experimental/numerical methodology was developed at CERN to investigate the effects of the assembling process and geometrical imperfections on the mechanical response of the collared coil of the 11 T HL-LHC dipole. The results of the experimental tests were benchmarked against 3-D non-linear finite element models, using material constitutive laws that mimicked the non-linear responses of the Nb3Sn cable, and embedding geometrical imperfections as measured on the tested components. The proposed methodology, used in the early stages of superconducting magnets development, may help to identify limitations in the mechanical design, and understand the impact of geometrical imperfections and tolerances on stress distribution in the magnet structures.
- 15 January 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-5
Test Results of the First Wax-Impregnated Nb-Ti Canted Cosine Theta Septum Magnet “SuShi”
In the framework of the future circular collider study, a new septum magnet concept (“SuShi”) has been developed, and a prototype was built at Wigner RCP, and tested at the FREIA facility of Uppsala University. The concept uses a canted cosine theta (CCT)-like superconducting magnet and a passive superconducting shield to create a zero-field and high-field region within its aperture. SuShi is the first CCT magnet with both of its winding layers simultaneously impregnated with wax. Details of the construction will be presented, with special emphasis on the wax impregnation procedure which deals with the $\sim$ 15% contraction of wax upon solidification. The empty magnet (no shield in its aperture) was powered without training to 450 A with a peak field of 3.64 T, corresponding to 80% of the short sample limit of the conductor along the load line. No quench or other anomaly was observed during the entire testing period. A clear onset of quench-back was observed above about 200 A.
- 15 January 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-5
Test Results of the First Wax-Impregnated Nb-Ti Canted Cosine Theta Septum Magnet “SuShi”
In the framework of the future circular collider study, a new septum magnet concept (“SuShi”) has been developed, and a prototype was built at Wigner RCP, and tested at the FREIA facility of Uppsala University. The concept uses a canted cosine theta (CCT)-like superconducting magnet and a passive superconducting shield to create a zero-field and high-field region within its aperture. SuShi is the first CCT magnet with both of its winding layers simultaneously impregnated with wax. Details of the construction will be presented, with special emphasis on the wax impregnation procedure which deals with the $\sim$ 15% contraction of wax upon solidification. The empty magnet (no shield in its aperture) was powered without training to 450 A with a peak field of 3.64 T, corresponding to 80% of the short sample limit of the conductor along the load line. No quench or other anomaly was observed during the entire testing period. A clear onset of quench-back was observed above about 200 A.
- Open Access
- 8 March 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 32 (6) , 1-5
Power Test of the First Two HL-LHC Insertion Quadrupole Magnets Built at CERN
The High-Luminosity project (HL-LHC) of the CERN Large Hadron Collider (LHC), requires low * quadrupole magnets in Nb3Sn technology that will be installed on each side of the ATLAS and CMS experiments. After a successful short-model magnet manufacture and test campaign, the project has advanced with the production, assembly, and test of full-size 7.15-m-long magnets. In the last two years, two CERN-built prototypes (MQXFBP1 and MQXFBP2) have been tested and magnetically measured at the CERN SM18 test facility. These are the longest accelerator magnets based on Nb3Sn technology built and tested to date. In this paper, we present the test and analysis results of these two magnets, with emphasis on quenches and training, voltage-current measurements and the quench localization with voltage taps and a new quench antenna.
- 8 March 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 32 (6) , 1-5
Open AccessPower Test of the First Two HL-LHC Insertion Quadrupole Magnets Built at CERN
The High-Luminosity project (HL-LHC) of the CERN Large Hadron Collider (LHC), requires low * quadrupole magnets in Nb3Sn technology that will be installed on each side of the ATLAS and CMS experiments. After a successful short-model magnet manufacture and test campaign, the project has advanced with the production, assembly, and test of full-size 7.15-m-long magnets. In the last two years, two CERN-built prototypes (MQXFBP1 and MQXFBP2) have been tested and magnetically measured at the CERN SM18 test facility. These are the longest accelerator magnets based on Nb3Sn technology built and tested to date. In this paper, we present the test and analysis results of these two magnets, with emphasis on quenches and training, voltage-current measurements and the quench localization with voltage taps and a new quench antenna.
- 16 February 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 32 (4) , 1-5
Update on the Electromagnetic Design of the Nb$_3$Sn Cos-Theta Dipole Model for FCC-hh
The Future Circular Collider (FCC) is the main option for the next generation of the High Energy Physics research. The accelerator in hadron-hadron configuration (FCC-hh) requires magnets able to generate fields of the order of 16 T to circulate particles in a 100 km circumference collider and therefore to reach 100 TeV centre of mass energy. On the basis of the recommendations made by the European Strategy for Particle Physics to intensify efforts to the High Field Magnet research, the INFN in collaboration with CERN signed an agreement to construct Falcon Dipole (Future Accelerator post-LHC Costheta Optimized Nb $_3$ Sn Dipole). This magnet is a demonstrator 1.5 m long of a Nb $_3$ Sn cos-theta dipole and its fabrication is part of the European R&D FCC program and the main goal of the project is to develop a Nb $_3$ Sn magnet in collaboration with the industry in the range of 12-14 T, using the existing high-Jc conductor. An updated electromagnetic 2D and 3D analysis is hereby presented, modeling the magnet with different FEM softwares. The magnet performance is studied both at nominal bore field of 12 T and at the ‘ultimate’ bore field of 14 T.
- 16 February 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 32 (4) , 1-5
Update on the Electromagnetic Design of the Nb$_3$Sn Cos-Theta Dipole Model for FCC-hh
The Future Circular Collider (FCC) is the main option for the next generation of the High Energy Physics research. The accelerator in hadron-hadron configuration (FCC-hh) requires magnets able to generate fields of the order of 16 T to circulate particles in a 100 km circumference collider and therefore to reach 100 TeV centre of mass energy. On the basis of the recommendations made by the European Strategy for Particle Physics to intensify efforts to the High Field Magnet research, the INFN in collaboration with CERN signed an agreement to construct Falcon Dipole (Future Accelerator post-LHC Costheta Optimized Nb $_3$ Sn Dipole). This magnet is a demonstrator 1.5 m long of a Nb $_3$ Sn cos-theta dipole and its fabrication is part of the European R&D FCC program and the main goal of the project is to develop a Nb $_3$ Sn magnet in collaboration with the industry in the range of 12-14 T, using the existing high-Jc conductor. An updated electromagnetic 2D and 3D analysis is hereby presented, modeling the magnet with different FEM softwares. The magnet performance is studied both at nominal bore field of 12 T and at the ‘ultimate’ bore field of 14 T.
- 14 February 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 32 (6) , 1-5
Mechanical Characterization of Nb3Sn Cable Insulation Systems Used for HL-LHC Accelerator Magnets at Ambient Temperature
he performance of accelerator magnets is strongly relying on the dielectric strength and mechanical robustness of the insulation system. This is in particular relevant for the current development of high field superconducting Nb3Sn magnets with the insulation system made from resin-impregnated glass fibres. During the assembly and operation at cold temperature, this insulation system is exposed to high mechanical compressive and shear stresses. The focus of the study was the investigation of the mechanical shear strength of the insulation composite. The experimental tests have been performed at room temperature, determining the mechanical strength and the failure mechanisms of the cable insulation system. Within this test the inter-laminar shear strength (ILSS) and non-standardized combined shear compressive strength were determined. The test sample preparation was based on the manufacturing procedures and materials used in the series fabrication for the CERN HL-LHC Nb3Sn coils. The individual insulation systems are varying in the S2-glass yarn density, the sizing, and the fibre volume fraction. Furthermore, the presence of mica insulation on the mechanical strength has also been studied. This paper describes the applied measurement procedures used during the test campaign, and presents the relevant measurement results, identifying the mechanical limitations of the insulation system.
- 14 February 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 32 (6) , 1-5
Mechanical Characterization of Nb3Sn Cable Insulation Systems Used for HL-LHC Accelerator Magnets at Ambient Temperature
he performance of accelerator magnets is strongly relying on the dielectric strength and mechanical robustness of the insulation system. This is in particular relevant for the current development of high field superconducting Nb3Sn magnets with the insulation system made from resin-impregnated glass fibres. During the assembly and operation at cold temperature, this insulation system is exposed to high mechanical compressive and shear stresses. The focus of the study was the investigation of the mechanical shear strength of the insulation composite. The experimental tests have been performed at room temperature, determining the mechanical strength and the failure mechanisms of the cable insulation system. Within this test the inter-laminar shear strength (ILSS) and non-standardized combined shear compressive strength were determined. The test sample preparation was based on the manufacturing procedures and materials used in the series fabrication for the CERN HL-LHC Nb3Sn coils. The individual insulation systems are varying in the S2-glass yarn density, the sizing, and the fibre volume fraction. Furthermore, the presence of mica insulation on the mechanical strength has also been studied. This paper describes the applied measurement procedures used during the test campaign, and presents the relevant measurement results, identifying the mechanical limitations of the insulation system.
- 8 February 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 32 (6) , 1-5
Mechanical Design of FalconD, a Nb$_3$Sn Cos$\theta$ Short Model Dipole for the FCC
The future of the particle accelerators points to a new CERN’s circular collider with an order of magnitude increase in the center-of-mass energy compared to the Large Hadron Collider (LHC). To achieve this increase from 14 TeV to 100 TeV a 100 km tunnel will be required to host the collider. This particle accelerator requires a new generation of double aperture superconducting magnets, capable of generating a high quality, stable 16 T magnetic field in a 50 mm bore. To manage this challenging task a roadmap was planned in the development of accelerator-grade Nb $_3$ Sn magnets under a specific four-year CERN-INFN (Italian Institute for Nuclear Physics) agreement. The first step will be the construction of a short, single aperture cos $\theta$ dipole, with a target magnetic field of 12 T and an ultimate field of 14 T. In this contribution, the mechanical design of this short model, called Falcon Dipole (Future Accelerator post-LHC Cos $\theta$ Optimised Nb $_3$ Sn Dipole) will be presented. To generate the required field, this magnet will feature a two-layer design, with state-of-the-art Nb $_3$ Sn conductor. This work is focused on the mechanical analysis of this short model. To cope with the intense magnetic forces that are generated in the magnet during operation and to ensure the integrity of the conductor, a novel mechanical structure has been identified, the so-called “bladder & key” (B&K), a technique that has never been used in cos $\theta$ dipoles and needs to be validated. In conclusion, this paper presents 2D and 3D FEA able to describe the constructive steps that meet the requirements imposed by the project to ensure the correct operation of this magnet.
- 8 February 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 32 (6) , 1-5
Mechanical Design of FalconD, a Nb$_3$Sn Cos$\theta$ Short Model Dipole for the FCC
The future of the particle accelerators points to a new CERN’s circular collider with an order of magnitude increase in the center-of-mass energy compared to the Large Hadron Collider (LHC). To achieve this increase from 14 TeV to 100 TeV a 100 km tunnel will be required to host the collider. This particle accelerator requires a new generation of double aperture superconducting magnets, capable of generating a high quality, stable 16 T magnetic field in a 50 mm bore. To manage this challenging task a roadmap was planned in the development of accelerator-grade Nb $_3$ Sn magnets under a specific four-year CERN-INFN (Italian Institute for Nuclear Physics) agreement. The first step will be the construction of a short, single aperture cos $\theta$ dipole, with a target magnetic field of 12 T and an ultimate field of 14 T. In this contribution, the mechanical design of this short model, called Falcon Dipole (Future Accelerator post-LHC Cos $\theta$ Optimised Nb $_3$ Sn Dipole) will be presented. To generate the required field, this magnet will feature a two-layer design, with state-of-the-art Nb $_3$ Sn conductor. This work is focused on the mechanical analysis of this short model. To cope with the intense magnetic forces that are generated in the magnet during operation and to ensure the integrity of the conductor, a novel mechanical structure has been identified, the so-called “bladder & key” (B&K), a technique that has never been used in cos $\theta$ dipoles and needs to be validated. In conclusion, this paper presents 2D and 3D FEA able to describe the constructive steps that meet the requirements imposed by the project to ensure the correct operation of this magnet.
- 15 March 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 31 (5) , 1-6
Pre-Load Studies on a 2-m Long Nb3Sn 11 T Model Magnet for the High Luminosity Upgrade of the LHC
The Large Hadron Collider luminosity upgrade requires the replacement of standard 8.3 T Nb-Ti main dipole magnets with pairs of shorter 11 T Nb $_{3}$ Sn dipole magnets. After the manufacturing and testing of several 2 m-long 11 T models, the full-length 11 T magnet series production is now ongoing. As a result of a degraded quench performance in several short models, attributed to excessive stress in the coils' midplanes, an upper hard limit for the coils' pre-stress was set to avoid any conductor degradation. With the aim of further investigating the influence of a lower pre-stress, an additional double-aperture short model was manufactured. The first aperture was assembled with the standard pre-stress target, in line with the series production. The second aperture was assembled with half of the standard pre-stress. Both apertures were then assembled into a 2-in-1 structure, but connected individually in order to power them independently to allow for comparison studies. Contrary to previously built 11 T magnets, the conductor type is also different as Powder-in-tube (PIT) cable was used, instead of standard Restacked-Rod-Process (RRP) cable. Additionally, the quench heaters for magnet protection were not impregnated as previously done, but placed on the outer radial surface of the coils, in agreement with the final decision for the 11 T series production. This paper describes the manufacturing and testing campaign results of this last 11 T short model.- 15 March 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 31 (5) , 1-6
Pre-Load Studies on a 2-m Long Nb3Sn 11 T Model Magnet for the High Luminosity Upgrade of the LHC
The Large Hadron Collider luminosity upgrade requires the replacement of standard 8.3 T Nb-Ti main dipole magnets with pairs of shorter 11 T Nb $_{3}$ Sn dipole magnets. After the manufacturing and testing of several 2 m-long 11 T models, the full-length 11 T magnet series production is now ongoing. As a result of a degraded quench performance in several short models, attributed to excessive stress in the coils' midplanes, an upper hard limit for the coils' pre-stress was set to avoid any conductor degradation. With the aim of further investigating the influence of a lower pre-stress, an additional double-aperture short model was manufactured. The first aperture was assembled with the standard pre-stress target, in line with the series production. The second aperture was assembled with half of the standard pre-stress. Both apertures were then assembled into a 2-in-1 structure, but connected individually in order to power them independently to allow for comparison studies. Contrary to previously built 11 T magnets, the conductor type is also different as Powder-in-tube (PIT) cable was used, instead of standard Restacked-Rod-Process (RRP) cable. Additionally, the quench heaters for magnet protection were not impregnated as previously done, but placed on the outer radial surface of the coils, in agreement with the final decision for the 11 T series production. This paper describes the manufacturing and testing campaign results of this last 11 T short model.