Brenda McCabe
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Brenda McCabe has a total of 29 co-authors. Here are the top co-authors by number of shared publications:
- Adam Heins
Learning Systems and Robotics Lab, Technical University of Munich, Germany
2 shared publications - Angela P. Schoellig
University of Toronto
2 shared publications - Changquan He
College of Civil Engineering, Shanghai Normal University, Shanghai 201418, China
2 shared publications Guangshe Jia
Department of Construction Management and Real Estate, Tongji University, China
2 shared publicationsJide Sun
Department of Construction Management and Real Estate, Tongji University, China
2 shared publicationsMohammad Nahangi
2 shared publications
Latest Publications
- Open Access
- 29 July 2025
- Published by SAGE Publications in Project Management Journal
- Vol. 57 (2) , 188-204
Toward Industry 5.0: A Conceptual Model for Blockchain’s Impact on Interorganizational Trust in Construction Project Management
Trust issues and collaboration inefficiencies are ongoing challenges in the construction industry, leading to great monetary and resource loss. Blockchain technology has a unique potential to foster trust through attributes of immutability, transparency, and decentralization, but the precise impact of blockchain on trust dynamics among project stakeholders has not yet been thoroughly explored. Blockchain-based interorganizational trust was developed as a conceptual model. This model provides a framework with seven propositions to explore blockchain’s influence on interorganizational trust. The findings indicate blockchain’s potential to strengthen system-based trust, which in turn enhances both affect-based and cognition-based trust.
- 29 July 2025
- Published by SAGE Publications in Project Management Journal
- Vol. 57 (2) , 188-204
Open AccessToward Industry 5.0: A Conceptual Model for Blockchain’s Impact on Interorganizational Trust in Construction Project Management
Trust issues and collaboration inefficiencies are ongoing challenges in the construction industry, leading to great monetary and resource loss. Blockchain technology has a unique potential to foster trust through attributes of immutability, transparency, and decentralization, but the precise impact of blockchain on trust dynamics among project stakeholders has not yet been thoroughly explored. Blockchain-based interorganizational trust was developed as a conceptual model. This model provides a framework with seven propositions to explore blockchain’s influence on interorganizational trust. The findings indicate blockchain’s potential to strengthen system-based trust, which in turn enhances both affect-based and cognition-based trust.
- 20 August 2023
- Published by Elsevier in Automation in Construction
- Vol. 155, 105054
Semantic-aware quality assessment of building elements using graph neural networks
- 20 August 2023
- Published by Elsevier in Automation in Construction
- Vol. 155, 105054
Semantic-aware quality assessment of building elements using graph neural networks
- 2 January 2022
- Published by Taylor & Francis in International Journal of Occupational Safety and Ergonomics
- Vol. 29 (1) , 141-153
Psychological decision-making process of construction worker safety behavior: an agent-based simulation approach
Objectives. Relationships between safety behavior and its antecedents have been widely studied. However, the psychological decision-making process of construction worker safety behavior (CWSB) is rarely examined from the systematic perspective. Thus, this study constructed the theoretical framework for the decision-making process of CWSB and systematically explored effects of individual factors (education, age and safety knowledge), organizational factors (safety climate and leader–member exchange [LMX]) and psychological factors (psychological capital [PsyCap] and communication competence [CommComp]) on the dynamic performance of CWSB. Methods. Data were collected from the literature and 536 construction workers in China. The theoretical model was tested with the agent-based simulation (ABS) technique. Results. High level of education, safety knowledge, safety climate, LMX, PsyCap and CommComp help to reduce unsafe behavior at the cut-off point. However, the age–safety relationship might present a U-shape, which denotes that reasonable age structure of construction worker groups may be an option for bettering safety performance. The results indicate that the psychological decision-making process of CWSB is not only the result of individual rational decision, but also the product of organizational and psychological impacts. Findings of this study shed lights on safety behavior management practices based on the psychological decision-making process of CWSB.
- 2 January 2022
- Published by Taylor & Francis in International Journal of Occupational Safety and Ergonomics
- Vol. 29 (1) , 141-153
Psychological decision-making process of construction worker safety behavior: an agent-based simulation approach
Objectives. Relationships between safety behavior and its antecedents have been widely studied. However, the psychological decision-making process of construction worker safety behavior (CWSB) is rarely examined from the systematic perspective. Thus, this study constructed the theoretical framework for the decision-making process of CWSB and systematically explored effects of individual factors (education, age and safety knowledge), organizational factors (safety climate and leader–member exchange [LMX]) and psychological factors (psychological capital [PsyCap] and communication competence [CommComp]) on the dynamic performance of CWSB. Methods. Data were collected from the literature and 536 construction workers in China. The theoretical model was tested with the agent-based simulation (ABS) technique. Results. High level of education, safety knowledge, safety climate, LMX, PsyCap and CommComp help to reduce unsafe behavior at the cut-off point. However, the age–safety relationship might present a U-shape, which denotes that reasonable age structure of construction worker groups may be an option for bettering safety performance. The results indicate that the psychological decision-making process of CWSB is not only the result of individual rational decision, but also the product of organizational and psychological impacts. Findings of this study shed lights on safety behavior management practices based on the psychological decision-making process of CWSB.
- 1 September 2020
- Published by American Society of Civil Engineers (ASCE) in Journal of Computing in Civil Engineering
- Vol. 34 (5) , 04020026
Quantifying Remoteness for Risk and Resilience Assessment Using Nighttime Satellite Imagery
Remoteness has a crucial role in risk assessments of megaprojects, resilience assessments of communities and infrastructure, and a wide range of public policymaking. The existing measures of remoteness require an extensive amount of population census and of road and infrastructure network data, and often are limited to narrow scopes. This paper presents a methodology to quantify remoteness using nighttime satellite imagery. The light clusters of nighttime satellite imagery are direct yet unintended consequences of human settled populations and urbanization; therefore, the absence of illuminated clusters is considered as evidence of remoteness. The proposed nighttime remoteness index (NIRI) conceptualizes the remoteness based on the distribution of nighttime lights within radii of up to 1,000 km. A predictive model was created using machine learning techniques such as multivariate adaptive regression splines and support vector machines regressions to establish a reliable and accurate link between nighttime lights and the Accessibility/Remoteness Index of Australia (ARIA). The model was used to establish NIRI for the United States and Canada, and in different years. The index was compared with the Canadian remoteness indexes published by Statistics Canada.
- 1 September 2020
- Published by American Society of Civil Engineers (ASCE) in Journal of Computing in Civil Engineering
- Vol. 34 (5) , 04020026
Quantifying Remoteness for Risk and Resilience Assessment Using Nighttime Satellite Imagery
Remoteness has a crucial role in risk assessments of megaprojects, resilience assessments of communities and infrastructure, and a wide range of public policymaking. The existing measures of remoteness require an extensive amount of population census and of road and infrastructure network data, and often are limited to narrow scopes. This paper presents a methodology to quantify remoteness using nighttime satellite imagery. The light clusters of nighttime satellite imagery are direct yet unintended consequences of human settled populations and urbanization; therefore, the absence of illuminated clusters is considered as evidence of remoteness. The proposed nighttime remoteness index (NIRI) conceptualizes the remoteness based on the distribution of nighttime lights within radii of up to 1,000 km. A predictive model was created using machine learning techniques such as multivariate adaptive regression splines and support vector machines regressions to establish a reliable and accurate link between nighttime lights and the Accessibility/Remoteness Index of Australia (ARIA). The model was used to establish NIRI for the United States and Canada, and in different years. The index was compared with the Canadian remoteness indexes published by Statistics Canada.
- Open Access
- 21 July 2020
- Published by IOP Publishing in Environmental Research Letters
- Vol. 15 (8) , 083003
Taxonomy of uncertainty in environmental life cycle assessment of infrastructure projects
Environmental life cycle assessment (LCA) is increasingly being used to evaluate infrastructure products and to inform their funding, design and construction. As such, recognition of study limitations and consideration of uncertainty are needed; however, most infrastructure LCAs still report deterministic values. Compared to other LCA subfields, infrastructure LCA has developed relatively recently and lags in adopting uncertainty analysis. This paper presents four broad categories of infrastructure LCA uncertainty. These contain 11 drivers focusing on differences between infrastructure and manufactured products. Identified categories and drivers are: application of ISO 14040/14044 standards (functional unit, reference flow, boundaries of analysis); spatiotemporal realities underlying physical construction (geography, local context, manufacturing time); nature of the construction industry (repetition of production, scale, and division of responsibilities); and characteristics of infrastructure projects (agglomeration of other products, and recurring embodied energy). Infrastructure products are typically large, one-off projects with no two being exactly alike in terms of form, function, temporal or spatial context. As a result, strong variability between products is the norm and much of the uncertainty is irreducible. Given the inability to make significant changes to an infrastructure project ex-post and the unique nature of infrastructure, ex-ante analysis is of particular importance. This paper articulates the key drivers of infrastructure specific LCA uncertainty laying the foundation for future refinement of uncertainty consideration for infrastructure. As LCA becomes an increasingly influential tool in decision making for infrastructure, uncertainty analysis must be standard practice, or we risk undermining the fundamental goal of reduced real-world negative environmental impacts.
- 21 July 2020
- Published by IOP Publishing in Environmental Research Letters
- Vol. 15 (8) , 083003
Open AccessTaxonomy of uncertainty in environmental life cycle assessment of infrastructure projects
Environmental life cycle assessment (LCA) is increasingly being used to evaluate infrastructure products and to inform their funding, design and construction. As such, recognition of study limitations and consideration of uncertainty are needed; however, most infrastructure LCAs still report deterministic values. Compared to other LCA subfields, infrastructure LCA has developed relatively recently and lags in adopting uncertainty analysis. This paper presents four broad categories of infrastructure LCA uncertainty. These contain 11 drivers focusing on differences between infrastructure and manufactured products. Identified categories and drivers are: application of ISO 14040/14044 standards (functional unit, reference flow, boundaries of analysis); spatiotemporal realities underlying physical construction (geography, local context, manufacturing time); nature of the construction industry (repetition of production, scale, and division of responsibilities); and characteristics of infrastructure projects (agglomeration of other products, and recurring embodied energy). Infrastructure products are typically large, one-off projects with no two being exactly alike in terms of form, function, temporal or spatial context. As a result, strong variability between products is the norm and much of the uncertainty is irreducible. Given the inability to make significant changes to an infrastructure project ex-post and the unique nature of infrastructure, ex-ante analysis is of particular importance. This paper articulates the key drivers of infrastructure specific LCA uncertainty laying the foundation for future refinement of uncertainty consideration for infrastructure. As LCA becomes an increasingly influential tool in decision making for infrastructure, uncertainty analysis must be standard practice, or we risk undermining the fundamental goal of reduced real-world negative environmental impacts.
- 24 May 2019
- Published by Taylor & Francis in International Journal of Occupational Safety and Ergonomics
- Vol. 27 (2) , 371-383
Relationship between leader–member exchange and construction worker safety behavior: the mediating role of communication competence
Purpose. Leader–member exchange (LMX) has widely been adopted to explore its influence on job performance. However, most previous studies considered LMX as a unidimensional construct and neglected the effects of its subdimensions, thereby reducing its practicality to improve work performance. This study empirically tested the relationship between subdimensions of LMX and safety behaviors, while incorporating communication competence as a mediator. Method. Data were collected from Chinese construction industry workers. The theoretical model was built and checked using the structural equation modeling technique. Results. The affect and contribution dimensions of LMX positively associated with safety behaviors, while the loyalty and professional respect dimensions had negative and no relations with safety behaviors respectively. These findings demonstrate that a multidimensional view on LMX should be taken while checking its effects on safety behaviors. The affect and professional respect dimensions of LMX had indirect effects on safety participation via communication competence, which illustrate the mediating role of communication competence for construction safety. This study sheds lights on safety behavior research based on the theories of LMX. Enhancing the leadership and communication skills of safety staff and fostering a supportive safety atmosphere at sites are suggested to improve construction safety performance.
- 24 May 2019
- Published by Taylor & Francis in International Journal of Occupational Safety and Ergonomics
- Vol. 27 (2) , 371-383
Relationship between leader–member exchange and construction worker safety behavior: the mediating role of communication competence
Purpose. Leader–member exchange (LMX) has widely been adopted to explore its influence on job performance. However, most previous studies considered LMX as a unidimensional construct and neglected the effects of its subdimensions, thereby reducing its practicality to improve work performance. This study empirically tested the relationship between subdimensions of LMX and safety behaviors, while incorporating communication competence as a mediator. Method. Data were collected from Chinese construction industry workers. The theoretical model was built and checked using the structural equation modeling technique. Results. The affect and contribution dimensions of LMX positively associated with safety behaviors, while the loyalty and professional respect dimensions had negative and no relations with safety behaviors respectively. These findings demonstrate that a multidimensional view on LMX should be taken while checking its effects on safety behaviors. The affect and professional respect dimensions of LMX had indirect effects on safety participation via communication competence, which illustrate the mediating role of communication competence for construction safety. This study sheds lights on safety behavior research based on the theories of LMX. Enhancing the leadership and communication skills of safety staff and fostering a supportive safety atmosphere at sites are suggested to improve construction safety performance.
- 22 July 2018
- Published by International Association for Automation and Robotics in Construction (IAARC) in Proceedings of the 37th International Symposium on Automation and Robotics in Construction (isarc)
- Vol. 2018 Proce, 80-86
Automated Localization of UAV’s in GPS-Denied Indoor Construction Environments Using Fiducial Markers
I.A.A.R.C. - International Association for Automation and Robotics in Construction Civil Engineering
- 22 July 2018
- Published by International Association for Automation and Robotics in Construction (IAARC) in Proceedings of the 37th International Symposium on Automation and Robotics in Construction (isarc)
- Vol. 2018 Proce, 80-86
Automated Localization of UAV’s in GPS-Denied Indoor Construction Environments Using Fiducial Markers
I.A.A.R.C. - International Association for Automation and Robotics in Construction Civil Engineering
- 13 February 2017
- Published by Taylor & Francis in International Journal of Construction Education and Research
- Vol. 14 (2) , 118-140
Coordination Challenges of Production Planning in the Construction of International Mega-Projects in The Middle East
The majority of mega construction projects suffer from delay and budget overrun syndromes. Despite the universal negative image of mega projects, they are essential for the development of public infrastructure. Little is known about how production planning and control of the challenging operational sites of mega-projects is handled. Compounding the complexity with an international context can substantially increase the risk of successful delivery. The purpose of this article is to explore how common production planning and control systems address the coordination challenges of international mega-projects. By understanding the nuances of international projects, a new definition is introduced. Characteristics of mega-projects found in the literature are reviewed and enhanced. Thirty-two experts, with a minimum of 15 years of experience, from 10 international mega-projects were interviewed in a structured interview process to augment the literature review. It was concluded that available production planning and control systems require special treatment to address the coordination challenges of international mega-projects. The interviewed experts reported changes to schedule, budget, scope, as well as an inadequate quality of design are categorized by as the most challenging factors affecting the coordination and delivery of international mega-projects.
- 13 February 2017
- Published by Taylor & Francis in International Journal of Construction Education and Research
- Vol. 14 (2) , 118-140
Coordination Challenges of Production Planning in the Construction of International Mega-Projects in The Middle East
The majority of mega construction projects suffer from delay and budget overrun syndromes. Despite the universal negative image of mega projects, they are essential for the development of public infrastructure. Little is known about how production planning and control of the challenging operational sites of mega-projects is handled. Compounding the complexity with an international context can substantially increase the risk of successful delivery. The purpose of this article is to explore how common production planning and control systems address the coordination challenges of international mega-projects. By understanding the nuances of international projects, a new definition is introduced. Characteristics of mega-projects found in the literature are reviewed and enhanced. Thirty-two experts, with a minimum of 15 years of experience, from 10 international mega-projects were interviewed in a structured interview process to augment the literature review. It was concluded that available production planning and control systems require special treatment to address the coordination challenges of international mega-projects. The interviewed experts reported changes to schedule, budget, scope, as well as an inadequate quality of design are categorized by as the most challenging factors affecting the coordination and delivery of international mega-projects.
- 1 January 2001
- Published by Inderscience Publishers in International Journal of Technology Management
- Vol. 21 (3/4) , 257
Belief networks for engineering applications
A relatively new form of artificial intelligence, namely belief networks, provides flexible modelling structures for capturing and evaluating uncertainty. The belief network consists of nodes to model the variables of the domain, and arcs to represent conditional dependence between variables. The development of a belief network requires four major steps: variable definition, identification of conditional relationships, definition of the states of the variables, and determination of the probabilistic values of the conditional relationships. The evaluation of a singly connected belief network is provided. Two applications for belief networks are discussed. One application involves the integration of a belief network with computer simulation resulting in an automated system for performance improvement. The second application is focused on assessing productivity of construction operations.
- 1 January 2001
- Published by Inderscience Publishers in International Journal of Technology Management
- Vol. 21 (3/4) , 257
Belief networks for engineering applications
A relatively new form of artificial intelligence, namely belief networks, provides flexible modelling structures for capturing and evaluating uncertainty. The belief network consists of nodes to model the variables of the domain, and arcs to represent conditional dependence between variables. The development of a belief network requires four major steps: variable definition, identification of conditional relationships, definition of the states of the variables, and determination of the probabilistic values of the conditional relationships. The evaluation of a singly connected belief network is provided. Two applications for belief networks are discussed. One application involves the integration of a belief network with computer simulation resulting in an automated system for performance improvement. The second application is focused on assessing productivity of construction operations.