Sayed Yaser Derakhshandeh
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Sayed Yaser Derakhshandeh has a total of 29 co-authors. Here are the top co-authors by number of shared publications:
- Abbas Kargar
Faculty of engineering, Shahre-Kord University, Shahre-Kord, Iran, 8815648456
4 shared publications Rohallah Pourbagher
Department of Engineering Shahrekord University Shahrekord Iran
3 shared publications- Ali Ghiasian
Faculty of Engineering, Shahrekord University, Shahrekord, Iran
2 shared publications Arman Fathollahi
Department of Electrical Engineering, Faculty of Engineering and Technology, Shahrekord University, Shahrekord, Iran
2 shared publicationsMohamad Esmail Hamedani Golshan
Department of Electrical and Computer Engineering; Isfahan University of Technology; Isfahan Iran
2 shared publications- Mohammad A. S. Masoum
Machine Learning and Drone Laboratory, Electrical and Computer Engineering Department, Utah Valley University, Orem, UT 84058, USA
2 shared publications
Latest Publications
- 12 June 2024
- Published by Elsevier in Electric Power Systems Research
- Vol. 234
A new hybrid approach for cold load restoration using deep learning
- 12 June 2024
- Published by Elsevier in Electric Power Systems Research
- Vol. 234
A new hybrid approach for cold load restoration using deep learning
- Open Access
- 15 September 2023
- Published by MDPI AG in Automation
- Vol. 4 (3) , 291-308
Multi-Criteria Design of Electric Transit Bus Based on Wireless Charging Infrastructure: A Case Study of Real Road Map in Wakefield
In this paper, a new design strategy is developed for the Wireless Charging Electric Transit Bus (WCETB). The technology is innovative in that the battery in the bus is charged while it is moving over the charging infrastructure. In particular, an improved version of the Whale Optimization Algorithm (IWOA) is adopted for the WCETB system in the road map of Wakefield City, located in the United Kingdom. The main challenge in the WCETB is to select the power transmitter and battery size efficiently from an economical point of view. For this purpose, both factors are considered in the objective function to achieve the benefits of WCETBs from an energy perspective. Two analytical economic design optimization models are developed in this work. The first model is the real- environment model, which considers a WCETB system operating under typical traffic conditions characterized by vehicle interactions and inherent uncertainties. In this scenario, vehicle speeds vary with time, and specific traffic routes may encounter congestion. The second model concentrates on a WCETB system operating in a traffic-free environment with minimal vehicle interactions and uncertainties. The IWOA is implemented for the WCETB to operate in the real environment. Under traffic-free environment conditions, we utilize mathematical procedures and General Algebraic Modeling System (GAMS) software to solve the optimization problem. This approach not only allows us to comprehensively analyze the WCETB system’s behavior but also examine the interactions among different components of the objective function and constraints. Finally, a comprehensive numerical analysis under various conditions, including changes in the number of buses and increases in the length of routes, is conducted.
- 15 September 2023
- Published by MDPI AG in Automation
- Vol. 4 (3) , 291-308
Open AccessMulti-Criteria Design of Electric Transit Bus Based on Wireless Charging Infrastructure: A Case Study of Real Road Map in Wakefield
In this paper, a new design strategy is developed for the Wireless Charging Electric Transit Bus (WCETB). The technology is innovative in that the battery in the bus is charged while it is moving over the charging infrastructure. In particular, an improved version of the Whale Optimization Algorithm (IWOA) is adopted for the WCETB system in the road map of Wakefield City, located in the United Kingdom. The main challenge in the WCETB is to select the power transmitter and battery size efficiently from an economical point of view. For this purpose, both factors are considered in the objective function to achieve the benefits of WCETBs from an energy perspective. Two analytical economic design optimization models are developed in this work. The first model is the real- environment model, which considers a WCETB system operating under typical traffic conditions characterized by vehicle interactions and inherent uncertainties. In this scenario, vehicle speeds vary with time, and specific traffic routes may encounter congestion. The second model concentrates on a WCETB system operating in a traffic-free environment with minimal vehicle interactions and uncertainties. The IWOA is implemented for the WCETB to operate in the real environment. Under traffic-free environment conditions, we utilize mathematical procedures and General Algebraic Modeling System (GAMS) software to solve the optimization problem. This approach not only allows us to comprehensively analyze the WCETB system’s behavior but also examine the interactions among different components of the objective function and constraints. Finally, a comprehensive numerical analysis under various conditions, including changes in the number of buses and increases in the length of routes, is conducted.
- 1 September 2023
- Published by Springer Nature in Smart Grids and Sustainable Energy
- Vol. 8 (3) , 1-12
Reactive Power Sharing Among Distributed Generation Sources in Islanded Microgrids to Improve Voltage Stability
- 1 September 2023
- Published by Springer Nature in Smart Grids and Sustainable Energy
- Vol. 8 (3) , 1-12
Reactive Power Sharing Among Distributed Generation Sources in Islanded Microgrids to Improve Voltage Stability
- 19 December 2022
- Published by Elsevier in Sustainable Energy, Grids and Networks
- Vol. 33
UAV-enhanced damage assessment of distribution systems in disasters with lack of communication coverage
- 19 December 2022
- Published by Elsevier in Sustainable Energy, Grids and Networks
- Vol. 33
UAV-enhanced damage assessment of distribution systems in disasters with lack of communication coverage
- Open Access
- 3 November 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 10, 117105-117117
Optimal Siting and Sizing of Wireless EV Charging Infrastructures Considering Traffic Network and Power Distribution System
The main challenges in the widespread deployment of electric vehicles (EVs) are limited driving range, long charging downtime, lack of charging stations in some areas, and high battery cost. Dynamic wireless charging (DWC) technology can overcome some of these obstacles by recharging EV batteries remotely while vehicles move over the charging infrastructures. However, most studies have limited this technology to public EVs working in specific routes like electric buses and taxis routes. This paper presents a long-term stochastic scenario-based mathematical model for allocating and sizing DWC infrastructures considering Ev’s location-routing, power distribution system (PDS) losses, and transportation network traffic. The proposed long-term model allows all types of EVs to take advantage of the installed DWC infrastructures and facilitate EVs’ widespread use by overcoming conventional charging technologies problems. The optimization problem is structured in the form of a Mixed Integer Non-Linear Programming (MINLP) model. Simulation results with detailed analyzes are furnished to illustrate the characteristics and performance of the model in a coupled network combining transportation and power networks. The numerical analysis provides meaningful insight into the transportation system design based on DWC technology and the effect of EV routing on the charging infrastructure allocation. Simulation results show that using Location-Routing Problem (LRP) can save up to 45% of the total cost of the DWC system. In addition, the proposed model, along with the simulations performed, demonstrates the advantage of DWC technology in reducing the size of vehicle batteries.
- 3 November 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 10, 117105-117117
Open AccessOptimal Siting and Sizing of Wireless EV Charging Infrastructures Considering Traffic Network and Power Distribution System
The main challenges in the widespread deployment of electric vehicles (EVs) are limited driving range, long charging downtime, lack of charging stations in some areas, and high battery cost. Dynamic wireless charging (DWC) technology can overcome some of these obstacles by recharging EV batteries remotely while vehicles move over the charging infrastructures. However, most studies have limited this technology to public EVs working in specific routes like electric buses and taxis routes. This paper presents a long-term stochastic scenario-based mathematical model for allocating and sizing DWC infrastructures considering Ev’s location-routing, power distribution system (PDS) losses, and transportation network traffic. The proposed long-term model allows all types of EVs to take advantage of the installed DWC infrastructures and facilitate EVs’ widespread use by overcoming conventional charging technologies problems. The optimization problem is structured in the form of a Mixed Integer Non-Linear Programming (MINLP) model. Simulation results with detailed analyzes are furnished to illustrate the characteristics and performance of the model in a coupled network combining transportation and power networks. The numerical analysis provides meaningful insight into the transportation system design based on DWC technology and the effect of EV routing on the charging infrastructure allocation. Simulation results show that using Location-Routing Problem (LRP) can save up to 45% of the total cost of the DWC system. In addition, the proposed model, along with the simulations performed, demonstrates the advantage of DWC technology in reducing the size of vehicle batteries.
- Open Access
- 24 July 2022
- Published by Institution of Engineering and Technology (IET) in IET Generation, Transmission & Distribution
- Vol. 16 (18) , 3760-3772
A novel approach to multi‐objective optimisation of the size and location of an improved hybrid flow controller
Transient stability is one of the major features of power systems operation which can be also considered an objective function in the flexible AC transmission systems (FACTS) allocation problem. This paper introduces a general multi‐level multi‐objective optimisation framework and its application on optimising the size and location of the improved hybrid flow controller (IHFC). IHFC is a new member of the FACTS family whose ability to control power flow and improve power system stability has been investigated. The optimisation problem considers economic and stability‐based objective functions simultaneously, and the allocation problem is formulated as a non‐linear programming (NLP) problem. The New England 39‐bus system has been used as a case study to demonstrate that the proposed framework can provide efficient and economically viable solutions to the allocation problem.
- 24 July 2022
- Published by Institution of Engineering and Technology (IET) in IET Generation, Transmission & Distribution
- Vol. 16 (18) , 3760-3772
Open AccessA novel approach to multi‐objective optimisation of the size and location of an improved hybrid flow controller
Transient stability is one of the major features of power systems operation which can be also considered an objective function in the flexible AC transmission systems (FACTS) allocation problem. This paper introduces a general multi‐level multi‐objective optimisation framework and its application on optimising the size and location of the improved hybrid flow controller (IHFC). IHFC is a new member of the FACTS family whose ability to control power flow and improve power system stability has been investigated. The optimisation problem considers economic and stability‐based objective functions simultaneously, and the allocation problem is formulated as a non‐linear programming (NLP) problem. The New England 39‐bus system has been used as a case study to demonstrate that the proposed framework can provide efficient and economically viable solutions to the allocation problem.
- Open Access
- 22 January 2022
- Published by Institution of Engineering and Technology (IET) in IET Generation, Transmission & Distribution
- Vol. 16 (9) , 1780-1794
A novel method for online voltage stability assessment based on PMU measurements and Thevenin equivalent
From the power systems security point of view, determining the voltage stability margin is essential for the operation of systems. An inaccurate determination of the maximum loading factor or voltage collapse point in a power system may cause voltage instability and blackout of the system. So, applying a proper method with high accuracy and high speed is vital in analysing voltage stability in power systems. This article presents a novel method based on Thevenin equivalent of power systems to accurately determine load‐ability margin using phasor measurement units (PMUs) data. The proposed method is based on the fact that at the voltage collapse point, the characteristic curves of ‘the reactive power at the receiving end’ and ‘the reactive power of the load’ in the weakest bus are tangential to each other. Furthermore, online application of the proposed method requires accurate estimation of the ‘ZIP load model’ and ‘Thevenin equivalent’ of the system. The proposed method is designed to determine the load‐ability margin, ZIP load model and Thevenin equivalent of the power system, simultaneously. This characteristic of the method makes it possible to be applied for online voltage stability assessments. To demonstrate the effectiveness of the proposed method, the simulation results for IEEE 14‐bus, 39‐bus New England and IEEE 300‐bus are presented and analysed.
- 22 January 2022
- Published by Institution of Engineering and Technology (IET) in IET Generation, Transmission & Distribution
- Vol. 16 (9) , 1780-1794
Open AccessA novel method for online voltage stability assessment based on PMU measurements and Thevenin equivalent
From the power systems security point of view, determining the voltage stability margin is essential for the operation of systems. An inaccurate determination of the maximum loading factor or voltage collapse point in a power system may cause voltage instability and blackout of the system. So, applying a proper method with high accuracy and high speed is vital in analysing voltage stability in power systems. This article presents a novel method based on Thevenin equivalent of power systems to accurately determine load‐ability margin using phasor measurement units (PMUs) data. The proposed method is based on the fact that at the voltage collapse point, the characteristic curves of ‘the reactive power at the receiving end’ and ‘the reactive power of the load’ in the weakest bus are tangential to each other. Furthermore, online application of the proposed method requires accurate estimation of the ‘ZIP load model’ and ‘Thevenin equivalent’ of the system. The proposed method is designed to determine the load‐ability margin, ZIP load model and Thevenin equivalent of the power system, simultaneously. This characteristic of the method makes it possible to be applied for online voltage stability assessments. To demonstrate the effectiveness of the proposed method, the simulation results for IEEE 14‐bus, 39‐bus New England and IEEE 300‐bus are presented and analysed.
- 27 January 2021
- Published by The Scientific and Technological Research Council of Turkey (TUBITAK-ULAKBIM) - DIGITAL COMMONS JOURNALS in Turkish Journal of Electrical Engineering and Computer Sciences
- Vol. 29 (1) , 186-202
A new method for optimal expansion planning in electrical energy distribution networks with distributed generation resources considering uncertainties
- 27 January 2021
- Published by The Scientific and Technological Research Council of Turkey (TUBITAK-ULAKBIM) - DIGITAL COMMONS JOURNALS in Turkish Journal of Electrical Engineering and Computer Sciences
- Vol. 29 (1) , 186-202
A new method for optimal expansion planning in electrical energy distribution networks with distributed generation resources considering uncertainties
- 14 June 2020
- Published by Taylor & Francis in Electric Power Components and Systems
- Vol. 48 (9-10) , 1021-1035
A Novel Method to Apply Reliability-Centered Maintenance on Over-Current Protection Systems
An optimum maintenance plan for the protection systems of substations leads to improve the reliability while reducing the related costs. Reliability-centered maintenance (RCM) is one of the widely used strategies to obtain an optimal maintenance plan. An important issue in the protection systems is lack of a direct way between normal operation states of the pieces of equipment and their failure states, which is named “hidden function”. This hidden function of the equipment in the protection systems is the main issue challenging the implementation of RCM on such systems. Over-current protection systems are one of the main protection systems which are installed in the outgoing distribution feeders of substations. This paper presents a novel approach for the implementation of RCM on the over-current protection systems. The main advantage of the proposed approach is its global consideration of a protection system instead of only focusing on relays. The proposed approach has been applied on two different substations using real data of their over-current protection systems obtained from The Organization of Generation, Transmission, and Distribution Management of Electric Power in Iran (Tavanir). The results reveal a higher reliability and lower costs of the proposed maintenance plan in comparison with current maintenance plans.
- 14 June 2020
- Published by Taylor & Francis in Electric Power Components and Systems
- Vol. 48 (9-10) , 1021-1035
A Novel Method to Apply Reliability-Centered Maintenance on Over-Current Protection Systems
An optimum maintenance plan for the protection systems of substations leads to improve the reliability while reducing the related costs. Reliability-centered maintenance (RCM) is one of the widely used strategies to obtain an optimal maintenance plan. An important issue in the protection systems is lack of a direct way between normal operation states of the pieces of equipment and their failure states, which is named “hidden function”. This hidden function of the equipment in the protection systems is the main issue challenging the implementation of RCM on such systems. Over-current protection systems are one of the main protection systems which are installed in the outgoing distribution feeders of substations. This paper presents a novel approach for the implementation of RCM on the over-current protection systems. The main advantage of the proposed approach is its global consideration of a protection system instead of only focusing on relays. The proposed approach has been applied on two different substations using real data of their over-current protection systems obtained from The Organization of Generation, Transmission, and Distribution Management of Electric Power in Iran (Tavanir). The results reveal a higher reliability and lower costs of the proposed maintenance plan in comparison with current maintenance plans.