Nima Safaei
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Nima Safaei has a total of 27 co-authors. Here are the top co-authors by number of shared publications:
- Reza Tavakkoli-Moghaddam
School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
6 shared publications Dragan Banjevic
C-MORE Lab, Department of Mechanical and Industrial Engineering, University of Toronto, Canada
4 shared publicationsAndrew K.S. Jardine
3 shared publicationsAndrew K. S. Jardine
C-MORE Lab, Department of Mechanical and Industrial Engineering, University of Toronto, Canada
2 shared publications- Corey Kiassat
Industrial Engineering, Department of Engineering, Quinnipiac University, Hamden, CT 06518, USA
2 shared publications Farrokh Sassani
2 shared publications
Latest Publications
- Open Access
- 22 January 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 9, 17854-17865
Robust Maintenance Scheduling of Aircraft Fleet: A Hybrid Simulation-Optimization Approach
We study the maintenance task scheduling problem for an aircraft fleet in an uncertain environment from the viewpoint of robust optimization. Given a daily horizon, the maintenance tasks delegated to a shop should be scheduled in such a way that sufficient aircrafts are available on time to meet the demand of planned missions. The tasks are either scheduled maintenance activities or unexpected repair jobs when a major fault is detected during pre- or after-flight check of each mission. The availability of skilled labour in the shop is the main constraint. We propose a robust formulation so that the maintenance tasks duration is subject to unstructured uncertainty due to the environmental and human factors. As a result of the specific structure of the primary model and non-convexity of the feasible space, the classical robust optimization methods cannot be applied. Thus, we propose an$\epsilon $ -Conservative model in tandem with Monte-Carlo sampling to extract the set of all feasible solutions corresponding to various disturbance vectors. Since the one-way sampling-then-optimization approach does not guarantee the probabilistic feasibility, we employ a hybrid simulation-optimization approach to ensure that the solutions provided by the$\epsilon $ -Conservative model are robust to all uncertainty scenarios. The experimental results confirm the scalability of the proposed methodology by generating the robust optimal solutions, satisfying all conservatism levels and uncertainty scenarios irrespective of the problem size.- 22 January 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 9, 17854-17865
Open AccessRobust Maintenance Scheduling of Aircraft Fleet: A Hybrid Simulation-Optimization Approach
We study the maintenance task scheduling problem for an aircraft fleet in an uncertain environment from the viewpoint of robust optimization. Given a daily horizon, the maintenance tasks delegated to a shop should be scheduled in such a way that sufficient aircrafts are available on time to meet the demand of planned missions. The tasks are either scheduled maintenance activities or unexpected repair jobs when a major fault is detected during pre- or after-flight check of each mission. The availability of skilled labour in the shop is the main constraint. We propose a robust formulation so that the maintenance tasks duration is subject to unstructured uncertainty due to the environmental and human factors. As a result of the specific structure of the primary model and non-convexity of the feasible space, the classical robust optimization methods cannot be applied. Thus, we propose an$\epsilon $ -Conservative model in tandem with Monte-Carlo sampling to extract the set of all feasible solutions corresponding to various disturbance vectors. Since the one-way sampling-then-optimization approach does not guarantee the probabilistic feasibility, we employ a hybrid simulation-optimization approach to ensure that the solutions provided by the$\epsilon $ -Conservative model are robust to all uncertainty scenarios. The experimental results confirm the scalability of the proposed methodology by generating the robust optimal solutions, satisfying all conservatism levels and uncertainty scenarios irrespective of the problem size. - Open Access
Correspondent Banking Networks: Theory and Experiment
We employ the mathematical programming approach in conjunction with the graph theory to study the structure of correspondent banking networks. Optimizing the network requires decisions to be made to onboard, terminate or restrict the bank relationships to optimize the size and overall risk of the network. This study provides theoretical foundation to detect the components, the removal of which does not affect some key properties of the network such as connectivity and diameter. We find that the correspondent banking networks have a feature we call k-accessibility, which helps to drastically reduce the computational burden required for finding the above mentioned components. We prove a number of fundamental theorems related to k-accessible directed graphs, which should be also applicable beyond the particular problem of financial networks. The theoretical findings are verified through the data from a large international bank.
Open AccessCorrespondent Banking Networks: Theory and Experiment
We employ the mathematical programming approach in conjunction with the graph theory to study the structure of correspondent banking networks. Optimizing the network requires decisions to be made to onboard, terminate or restrict the bank relationships to optimize the size and overall risk of the network. This study provides theoretical foundation to detect the components, the removal of which does not affect some key properties of the network such as connectivity and diameter. We find that the correspondent banking networks have a feature we call k-accessibility, which helps to drastically reduce the computational burden required for finding the above mentioned components. We prove a number of fundamental theorems related to k-accessible directed graphs, which should be also applicable beyond the particular problem of financial networks. The theoretical findings are verified through the data from a large international bank.
- 1 May 2019
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 131, 464-476
Effect of imprecise skill level on workforce rotation in a dynamic market
- 1 May 2019
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 131, 464-476
Effect of imprecise skill level on workforce rotation in a dynamic market
- 12 February 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Systems, Man, and Cybernetics: Systems
- Vol. 51 (2) , 1064-1074
Premature Aircraft Maintenance: A Matter of Cost or Risk?
- 12 February 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Systems, Man, and Cybernetics: Systems
- Vol. 51 (2) , 1064-1074
Premature Aircraft Maintenance: A Matter of Cost or Risk?
- Open Access
A Swift Heuristic Method for Work Order Scheduling under the Skilled-Workforce Constraint
The considered problem is how to optimally allocate a set of jobs to technicians of different skills such that the number of technicians of each skill does not exceed the number of persons with that skill designation. The key motivation is the quick sensitivity analysis in terms of the workforce size which is quite necessary in many industries in the presence of unexpected work orders. A time-indexed mathematical model is proposed to minimize the total weighted completion time of the jobs. The proposed model is decomposed into a number of single-skill sub-problems so that each one is a combination of a series of nested binary Knapsack problems. A heuristic procedure is proposed to solve the problem. Our experimental results, based on a real-world case study, reveal that the proposed method quickly produces a schedule statistically close to the optimal one while the classical optimal procedure is very time-consuming.
Open AccessA Swift Heuristic Method for Work Order Scheduling under the Skilled-Workforce Constraint
The considered problem is how to optimally allocate a set of jobs to technicians of different skills such that the number of technicians of each skill does not exceed the number of persons with that skill designation. The key motivation is the quick sensitivity analysis in terms of the workforce size which is quite necessary in many industries in the presence of unexpected work orders. A time-indexed mathematical model is proposed to minimize the total weighted completion time of the jobs. The proposed model is decomposed into a number of single-skill sub-problems so that each one is a combination of a series of nested binary Knapsack problems. A heuristic procedure is proposed to solve the problem. Our experimental results, based on a real-world case study, reveal that the proposed method quickly produces a schedule statistically close to the optimal one while the classical optimal procedure is very time-consuming.
- 30 November 2012
- Published by Elsevier in Applied Soft Computing
- Vol. 12 (11) , 3462-3471
Annealing-based particle swarm optimization to solve the redundant reliability problem with multiple component choices
- 30 November 2012
- Published by Elsevier in Applied Soft Computing
- Vol. 12 (11) , 3462-3471
Annealing-based particle swarm optimization to solve the redundant reliability problem with multiple component choices
- 17 January 2012
- Published by Taylor & Francis in IIE Transactions
- Vol. 44 (12) , 1100-1114
Manufacturing system design by considering multiple machine replacements under discounted costs
This article investigates the effect of equipment replacement on the design phase of multi-machine manufacturing systems, given a finite horizon and discounted costs. For the most part, the manufacturing system design literature has focused on the design issue, ignoring equipment replacement and its economic impact. The design phase generally consists of equipment selection, process routing, and layout decisions. The authors propose an explicit mathematical form for the operating costs of equipment and their salvage values based on their previous experience of life cycle costing projects. The design phase of cellular manufacturing systems, the so-called cell formation problem, is used. The problem is formulated as a non-linear mixed-integer programming model and solved using a proposed branch-and-bound algorithm. The algorithm employs a depth-first branching strategy in conjunction with a bounding procedure with a heuristic method. Selected numerical examples demonstrate the applicability of the model and verify the performance of the proposed algorithm. The results enable the best equipment mix and product process routes to be chosen based on the given horizon and economic factors; in addition, information is obtained about which equipment should be replaced and at what time point this replacement should occur.
- 17 January 2012
- Published by Taylor & Francis in IIE Transactions
- Vol. 44 (12) , 1100-1114
Manufacturing system design by considering multiple machine replacements under discounted costs
This article investigates the effect of equipment replacement on the design phase of multi-machine manufacturing systems, given a finite horizon and discounted costs. For the most part, the manufacturing system design literature has focused on the design issue, ignoring equipment replacement and its economic impact. The design phase generally consists of equipment selection, process routing, and layout decisions. The authors propose an explicit mathematical form for the operating costs of equipment and their salvage values based on their previous experience of life cycle costing projects. The design phase of cellular manufacturing systems, the so-called cell formation problem, is used. The problem is formulated as a non-linear mixed-integer programming model and solved using a proposed branch-and-bound algorithm. The algorithm employs a depth-first branching strategy in conjunction with a bounding procedure with a heuristic method. Selected numerical examples demonstrate the applicability of the model and verify the performance of the proposed algorithm. The results enable the best equipment mix and product process routes to be chosen based on the given horizon and economic factors; in addition, information is obtained about which equipment should be replaced and at what time point this replacement should occur.
- 26 September 2011
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 27 (1) , 442-449
Workforce Planning for Power Restoration: An Integrated Simulation-Optimization Approach
In this paper, an integrated simulation-optimization approach is proposed for annual planning of power restoration workforce related to an electricity distribution company in a province of Canada. Internal and external workforces are employed to perform maintenance actions and restore power after interruptions throughout the province. According to the electricity distribution network, the province is divided into a number of work locations (WL), each having local crews to perform maintenance actions and fix power interruptions. However, determining the size of the crew in each WL over the year is challenging because of high fluctuation in interruption frequency and consequently in projected demand during the year. The frequency of interruptions is affected by various factors such as geographical location, time calendar, and particularly weather conditions. The objective is to determine the optimal combination of internal and external workforce over the year to cover the interruptions across the province with minimum cost and minimum customer interruption duration.
- 26 September 2011
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 27 (1) , 442-449
Workforce Planning for Power Restoration: An Integrated Simulation-Optimization Approach
In this paper, an integrated simulation-optimization approach is proposed for annual planning of power restoration workforce related to an electricity distribution company in a province of Canada. Internal and external workforces are employed to perform maintenance actions and restore power after interruptions throughout the province. According to the electricity distribution network, the province is divided into a number of work locations (WL), each having local crews to perform maintenance actions and fix power interruptions. However, determining the size of the crew in each WL over the year is challenging because of high fluctuation in interruption frequency and consequently in projected demand during the year. The frequency of interruptions is affected by various factors such as geographical location, time calendar, and particularly weather conditions. The objective is to determine the optimal combination of internal and external workforce over the year to cover the interruptions across the province with minimum cost and minimum customer interruption duration.
- 13 June 2011
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 50 (1) , 63-80
Multi-threaded simulated annealing for a bi-objective maintenance scheduling problem
A parallel Simulated Annealing algorithm with multi-threaded architecture is proposed to solve a real bi-objective maintenance scheduling problem with conflicting objectives: the minimisation of the total equipment downtime caused by maintenance jobs and the minimisation of the multi-skilled workforce requirements over the given horizon. The maintenance jobs have different priorities with some precedence relations between different skills. The total weighted flow time is used as a scheduling criterion to measure the equipment availability. The multi-threaded architecture is used to speed up a multi-objective Simulated Annealing algorithm to solve the considered problem. Multi-threading is a form of parallelism based on shared memory architecture where multiple logical processing units, so-called threads, run concurrently and communicate via shared memory. The performance of the parallel method compared to the exact method is verified using a number of test problems. The obtained results imply the high efficiency and robustness of the proposed heuristic for both solution quality and computational effort.
- 13 June 2011
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 50 (1) , 63-80
Multi-threaded simulated annealing for a bi-objective maintenance scheduling problem
A parallel Simulated Annealing algorithm with multi-threaded architecture is proposed to solve a real bi-objective maintenance scheduling problem with conflicting objectives: the minimisation of the total equipment downtime caused by maintenance jobs and the minimisation of the multi-skilled workforce requirements over the given horizon. The maintenance jobs have different priorities with some precedence relations between different skills. The total weighted flow time is used as a scheduling criterion to measure the equipment availability. The multi-threaded architecture is used to speed up a multi-objective Simulated Annealing algorithm to solve the considered problem. Multi-threading is a form of parallelism based on shared memory architecture where multiple logical processing units, so-called threads, run concurrently and communicate via shared memory. The performance of the parallel method compared to the exact method is verified using a number of test problems. The obtained results imply the high efficiency and robustness of the proposed heuristic for both solution quality and computational effort.