Xinlei Hu
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Xinlei Hu has a total of 25 co-authors. Here are the top co-authors by number of shared publications:
Guangming Xu
2 shared publications- Jing Xu
Central South University
2 shared publications - Lianbo Deng
School of Traffic and Transportation Engineering, Central South University, Changsha, Hunan, China
2 shared publications Feng Shi
1 shared publication- Feng Shi
School of Traffic and Transportation Engineering, Central South University, Changsha, China
1 shared publication - Huanyin Su
School of Railway Tracks and Transportation, Wuyi University, Jiangmen 529020, China
1 shared publication
Latest Publications
- 21 February 2026
- Published by Elsevier in Transport Policy
- Vol. 181
The impact of high-speed rail on city government debt financing
- 21 February 2026
- Published by Elsevier in Transport Policy
- Vol. 181
The impact of high-speed rail on city government debt financing
- Top Cited Papers
- 28 January 2024
- Published by Elsevier in Reliability Engineering & System Safety
- Vol. 245
Service vulnerability assessment of China's high-speed train network: A simulation approach
- 28 January 2024
- Published by Elsevier in Reliability Engineering & System Safety
- Vol. 245
Top Cited PapersService vulnerability assessment of China's high-speed train network: A simulation approach
- 25 October 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Intelligent Transportation Systems
- Vol. 25 (5) , 4398-4412
Joint Optimization of Multistage Pricing and Seat Allocation for High-Speed Railways Integrating Pre-Sale Period Division
This paper studies the joint optimization problem of multistage pricing and seat allocation integrating pre-sale period division in high-speed railways (HSRs), taking the fluctuation of daily demand and the interaction between pricing and seat allocation into account. To maximize railway revenue, we establish an elastic demand function for each day, and then formulate a non-linear mixed integer optimization model, which considers real-life constraints, including price time and space relationships. The complex capacity sharing in HSRs and multistage pricing increase the scale of the optimization problem; the inclusion of pre-sale period division further complicates this. Therefore, we propose a multi-level comprehensive optimization method that decomposes the joint problem into two subproblems. The first subproblem optimizes multistage pricing and seat allocation under the given pre-sale period division scheme obtained from the second subproblem, while the second subproblem optimizes the pre-sale period division scheme by adjusting the period boundary between two adjacent periods to generate a new pre-sale period division scheme. Then, three algorithms are designed. Algorithm DCLalglabel1DCLalglabel1 optimizes the first subproblem based on a divide-and-conquer strategy. Algorithm DCLalglabel2DCLalglabel2 optimizes the pre-sale period division scheme, with a high-quality initial solution given by Algorithm DCLalglabel3DCLalglabel3. Two numerical examples are presented to demonstrate the high quality and efficiency of the proposed model and algorithms, which could provide decision support for railway ticket pricing. When there are five periods, the total revenue increases by 3.11% and 2.59% for small and large-scale instances, respectively; the total passenger kilometers increase by 21.21% and 19.42%, respectively.
- 25 October 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Intelligent Transportation Systems
- Vol. 25 (5) , 4398-4412
Joint Optimization of Multistage Pricing and Seat Allocation for High-Speed Railways Integrating Pre-Sale Period Division
This paper studies the joint optimization problem of multistage pricing and seat allocation integrating pre-sale period division in high-speed railways (HSRs), taking the fluctuation of daily demand and the interaction between pricing and seat allocation into account. To maximize railway revenue, we establish an elastic demand function for each day, and then formulate a non-linear mixed integer optimization model, which considers real-life constraints, including price time and space relationships. The complex capacity sharing in HSRs and multistage pricing increase the scale of the optimization problem; the inclusion of pre-sale period division further complicates this. Therefore, we propose a multi-level comprehensive optimization method that decomposes the joint problem into two subproblems. The first subproblem optimizes multistage pricing and seat allocation under the given pre-sale period division scheme obtained from the second subproblem, while the second subproblem optimizes the pre-sale period division scheme by adjusting the period boundary between two adjacent periods to generate a new pre-sale period division scheme. Then, three algorithms are designed. Algorithm DCLalglabel1DCLalglabel1 optimizes the first subproblem based on a divide-and-conquer strategy. Algorithm DCLalglabel2DCLalglabel2 optimizes the pre-sale period division scheme, with a high-quality initial solution given by Algorithm DCLalglabel3DCLalglabel3. Two numerical examples are presented to demonstrate the high quality and efficiency of the proposed model and algorithms, which could provide decision support for railway ticket pricing. When there are five periods, the total revenue increases by 3.11% and 2.59% for small and large-scale instances, respectively; the total passenger kilometers increase by 21.21% and 19.42%, respectively.
- Open Access
- 24 December 2021
- Published by Wiley in Journal of Advanced Transportation
- Vol. 2021, 1-15
Optimization Problem of Pricing and Seat Allocation Based on Bilevel Multifollower Programming in High-Speed Railway
This paper studies the multistage pricing and seat allocation problems for multiple train services in a high-speed railway (HSR) with multiple origins and destinations (ODs). Taking the maximum total revenue of all trains as the objective function, a joint optimization model of multistage pricing and seat allocation is established. The actual operation constraints, including train seat capacity constraints, price time constraints in each period, and price space constraints among products, are fully considered. We reformulate the optimization model as a bilevel multifollower programming model in which the upper-level model solves the seat allocation problem for all trains serving multiple ODs in the whole booking horizon and the lower optimizes the pricing decisions for each train serving each OD in different decision periods. The upper and lower are a large-scale static seat allocation programming and many small-scale multistage dynamic pricing programming which can be solved independently, respectively. The solving difficulty can be significantly reduced by decomposing. Then, we design an effective solution method based on divide-and-conquer strategy. A real instance of the China’s Wuhan-Guangzhou high-speed railway is employed to validate the advantages of the proposed model and the solution method.
- 24 December 2021
- Published by Wiley in Journal of Advanced Transportation
- Vol. 2021, 1-15
Open AccessOptimization Problem of Pricing and Seat Allocation Based on Bilevel Multifollower Programming in High-Speed Railway
This paper studies the multistage pricing and seat allocation problems for multiple train services in a high-speed railway (HSR) with multiple origins and destinations (ODs). Taking the maximum total revenue of all trains as the objective function, a joint optimization model of multistage pricing and seat allocation is established. The actual operation constraints, including train seat capacity constraints, price time constraints in each period, and price space constraints among products, are fully considered. We reformulate the optimization model as a bilevel multifollower programming model in which the upper-level model solves the seat allocation problem for all trains serving multiple ODs in the whole booking horizon and the lower optimizes the pricing decisions for each train serving each OD in different decision periods. The upper and lower are a large-scale static seat allocation programming and many small-scale multistage dynamic pricing programming which can be solved independently, respectively. The solving difficulty can be significantly reduced by decomposing. Then, we design an effective solution method based on divide-and-conquer strategy. A real instance of the China’s Wuhan-Guangzhou high-speed railway is employed to validate the advantages of the proposed model and the solution method.
- Open Access
- 1 January 2019
- Published by Wiley in Mathematical Problems in Engineering
- Vol. 2019 (1)
A Line Planning Approach for High‐Speed Rail Networks with Time‐Dependent Demand and Capacity Constraints
In high‐speed rail networks, trains are operated with high speeds and high frequencies, which can satisfy passenger demand with different expected departure times. Given time‐dependent demand, this paper proposes a line planning approach with capacity constraints for high‐speed rail networks. In this paper, a bilevel optimization model is formulated and the constraints include track section capacity per unit time, train seat capacity, and the gap between the number of starting trains and that of ending trains at a station. In the upper level, the objective is to minimize train operational cost and passenger travel cost, and the decision variables include the line of each train, carriage composition of each train, train stop patterns, train start times, and train arrival and departure times at stops in the line plan. In the lower level, a schedule‐based passenger assignment method, which assigns time‐varying demand on trains with seat capacity constraints by simulating the ticket‐booking process, is used to evaluate the line plan obtained in the upper level. A simulated annealing algorithm is developed to solve the model in which some strategies are designed to search for neighborhood solutions, including reducing train carriages, deleting trains, adding trains, increasing train carriages, and adjusting train start times. Finally, an application to the Chinese high‐speed rail network is presented. The numerical results show that (i) the average time deviations between the expected departure times and the actual boarding times of passengers are within 30 min, (ii) the unserved passengers are less than 200, and (iii) the average load factors of trains are about 70%. Hence, line plan solutions meet time‐dependent demand well and satisfy the capacity constraints for high‐speed rail networks.
- 1 January 2019
- Published by Wiley in Mathematical Problems in Engineering
- Vol. 2019 (1)
Open AccessA Line Planning Approach for High‐Speed Rail Networks with Time‐Dependent Demand and Capacity Constraints
In high‐speed rail networks, trains are operated with high speeds and high frequencies, which can satisfy passenger demand with different expected departure times. Given time‐dependent demand, this paper proposes a line planning approach with capacity constraints for high‐speed rail networks. In this paper, a bilevel optimization model is formulated and the constraints include track section capacity per unit time, train seat capacity, and the gap between the number of starting trains and that of ending trains at a station. In the upper level, the objective is to minimize train operational cost and passenger travel cost, and the decision variables include the line of each train, carriage composition of each train, train stop patterns, train start times, and train arrival and departure times at stops in the line plan. In the lower level, a schedule‐based passenger assignment method, which assigns time‐varying demand on trains with seat capacity constraints by simulating the ticket‐booking process, is used to evaluate the line plan obtained in the upper level. A simulated annealing algorithm is developed to solve the model in which some strategies are designed to search for neighborhood solutions, including reducing train carriages, deleting trains, adding trains, increasing train carriages, and adjusting train start times. Finally, an application to the Chinese high‐speed rail network is presented. The numerical results show that (i) the average time deviations between the expected departure times and the actual boarding times of passengers are within 30 min, (ii) the unserved passengers are less than 200, and (iii) the average load factors of trains are about 70%. Hence, line plan solutions meet time‐dependent demand well and satisfy the capacity constraints for high‐speed rail networks.
- Open Access
- 25 September 2017
- Published by Public Library of Science (PLoS) in PLOS ONE
- Vol. 12 (9) , e0176005
Circuity analyses of HSR network and high-speed train paths in China
Circuity, defined as the ratio of the shortest network distance to the Euclidean distance between one origin–destination (O-D) pair, can be adopted as a helpful evaluation method of indirect degrees of train paths. In this paper, the maximum circuity of the paths of operated trains is set to be the threshold value of the circuity of high-speed train paths. For the shortest paths of any node pairs, if their circuity is not higher than the threshold value, the paths can be regarded as the reasonable paths. With the consideration of a certain relative or absolute error, we cluster the reasonable paths on the basis of their inclusion relationship and the center path of each class represents a passenger transit corridor. We take the high-speed rail (HSR) network in China at the end of 2014 as an example, and obtain 51 passenger transit corridors, which are alternative sets of train paths. Furthermore, we analyze the circuity distribution of paths of all node pairs in the network. We find that the high circuity of train paths can be decreased with the construction of a high-speed railway line, which indicates that the structure of the HSR network in China tends to be more complete and the HSR network can make the Chinese railway network more efficient.
- 25 September 2017
- Published by Public Library of Science (PLoS) in PLOS ONE
- Vol. 12 (9) , e0176005
Open AccessCircuity analyses of HSR network and high-speed train paths in China
Circuity, defined as the ratio of the shortest network distance to the Euclidean distance between one origin–destination (O-D) pair, can be adopted as a helpful evaluation method of indirect degrees of train paths. In this paper, the maximum circuity of the paths of operated trains is set to be the threshold value of the circuity of high-speed train paths. For the shortest paths of any node pairs, if their circuity is not higher than the threshold value, the paths can be regarded as the reasonable paths. With the consideration of a certain relative or absolute error, we cluster the reasonable paths on the basis of their inclusion relationship and the center path of each class represents a passenger transit corridor. We take the high-speed rail (HSR) network in China at the end of 2014 as an example, and obtain 51 passenger transit corridors, which are alternative sets of train paths. Furthermore, we analyze the circuity distribution of paths of all node pairs in the network. We find that the high circuity of train paths can be decreased with the construction of a high-speed railway line, which indicates that the structure of the HSR network in China tends to be more complete and the HSR network can make the Chinese railway network more efficient.