Rebecca Ward
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Rebecca Ward has a total of 25 co-authors. Here are the top co-authors by number of shared publications:
- Ruchi Choudhary
University of Cambridge
4 shared publications - Monika Johanna Kreitmair
University of Cambridge
3 shared publications R. Choudhary
Engineering Department, University of Cambridge, Cambridge, UK
3 shared publications- Chaoqun Zhuang
Data-Centric Engineering, The Alan Turing Institute, The British Library, 96 Euston Road, London NW1 2DB, UK
2 shared publications - Max Langtry
University of Cambridge
2 shared publications - Melanie Jans-Singh
Engineering Department, University of Cambridge, Trumpington Street, CB2 1PZCambridge, United Kingdom
2 shared publications
Latest Publications
- Open Access
- 5 November 2024
- Published by Taylor & Francis in Journal of Building Performance Simulation
- Vol. 18 (1) , 76-92
Rationalising data collection for supporting decision making in building energy systems using value of information analysis
- 5 November 2024
- Published by Taylor & Francis in Journal of Building Performance Simulation
- Vol. 18 (1) , 76-92
Open AccessRationalising data collection for supporting decision making in building energy systems using value of information analysis
- Open Access
- 30 July 2024
- Published by Elsevier in Energy and Buildings
- Vol. 320
Impact of data for forecasting on performance of model predictive control in buildings with smart energy storage
- 30 July 2024
- Published by Elsevier in Energy and Buildings
- Vol. 320
Open AccessImpact of data for forecasting on performance of model predictive control in buildings with smart energy storage
- Open Access
- 2 October 2023
- Published by TU Delft OPEN Publishing in Symposium on Energy Geotechnics 2023
impact of heated basements on the performance of borehole GHEs
Increasing urban development is leading to a growing demand for subsurface utilisation. As more infrastructure is built into the subsurface, heat from tunnels, sewers, and basements, among others, alter the thermal state of the ground, acting as sources and sinks of heat, leading to a net-increase of underground temperatures, a phenomenon known as the Subsurface Urban Heat Island (SUHI) [7-8]. This additional heat can have impacts on, for example, health and maintenance of underground structures, increased ventilation costs for underground spaces, and quality and quantity of groundwater flow [1,2]. However, this additional heat in the subsurface can also be harvested by ground-source heat pump (GSHP) systems to provide heating to buildings [3-6], operating more efficiently due to the higher ground temperatures and reducing these temperatures through operation, thus mitigating the risks and impacts of SUHI. This work demonstrates how heated basements can contribute to the operation of GSHP systems to provide heating. The area of Downing College, located in central Cambridge, UK, is used as a case study site, investigating how much of the college’s heating demand a number of geothermal boreholes could provide, when the heat from the building basements is taken into account and when it is not. Measured gas consumption data from the college are used to estimate the heat demand. The geology of the site is obtained by importing historical borehole records for the wider Cambridge area into the British Geological Survey (BGS) Groundhog® Desktop Geoscientific Information System and constraining the domain using BGS generated superficial deposit and bedrock geology maps, thus producing a 3D lithological profile for the region*, while the hydrological conditions were obtained using measured water level time-series data, from water wells in the area, curtesy of the Environment Agency. A total of 88 boreholes are considered, placed symmetrically in the college courtyard, between the main buildings. Typical single U-loop borehole configurations are used with pipes of 32 mm outer diameter. Acknowledging that the effect of heated basements is greater in shallower regions of the subsurface, two typical borehole length values are considered: 50 m, providing about 40% of the required heating load, and 100 m, providing 100%. The operation is simulated over 50 years, using a full 3D numerical model coupling heat transfer, groundwater flow, and pipe flow governing equations, created in COMSOL Multiphysics®. The temperature of the heated basements is assumed to be maintained at 18 °C throughout the simulation. During the first 10 years, the GHEs are not operating, to allow heat accumulation in the ground to occur from the heated basements, following which, 40 years of operating GHEs are simulated. The results of the simulations suggest that an increase in performance occurs when heated basements are present. For all scenarios, the fluid temperatures keep decreasing over time, as the ground temperature around the boreholes keeps decreasing, making it more difficult to extract heat. Over the 50 years of simulation, the fluid temperature reaches a minimum of -3.20 °C and -2.13 °C for the 50 m GHEs, and 4.52 °C and 3.88 °C for 100 m GHEs, in both cases the first value being the simulation with heated basements and the second without. The COP values over time are presented in Figure 1-right, showing the difference in COP between the cases with and without heated basements increasing over time for both 50 m and 100 m GHEs, for the former at a higher rate. This increase corresponds to the increase in the average fluid temperature between the cases with and without heated basements, also shown in the figure, and reaches a maximum difference of about 0.08 for the 50 m GHEs and 0.05 for the 100 m GHEs, corresponding to a fluid temperature difference of about 1.10 °C and 0.65 °C, respectively. These figures correspond to a reduction in operating costs (assuming an electricity rate of £0.34 per kWh) of £17,352 for 50 m GHEs and £18,197 for 100 m GHEs. While for this case these values are relatively small considering 40 years of operation, the fluid temperature difference suggests that more energy can be extracted by the GHE borheoles when heated basements are present, especially for shorter boreholes, and thus potential savings could be obtained by reducing the number of GHEs.
- 2 October 2023
- Published by TU Delft OPEN Publishing in Symposium on Energy Geotechnics 2023
Open Accessimpact of heated basements on the performance of borehole GHEs
Increasing urban development is leading to a growing demand for subsurface utilisation. As more infrastructure is built into the subsurface, heat from tunnels, sewers, and basements, among others, alter the thermal state of the ground, acting as sources and sinks of heat, leading to a net-increase of underground temperatures, a phenomenon known as the Subsurface Urban Heat Island (SUHI) [7-8]. This additional heat can have impacts on, for example, health and maintenance of underground structures, increased ventilation costs for underground spaces, and quality and quantity of groundwater flow [1,2]. However, this additional heat in the subsurface can also be harvested by ground-source heat pump (GSHP) systems to provide heating to buildings [3-6], operating more efficiently due to the higher ground temperatures and reducing these temperatures through operation, thus mitigating the risks and impacts of SUHI. This work demonstrates how heated basements can contribute to the operation of GSHP systems to provide heating. The area of Downing College, located in central Cambridge, UK, is used as a case study site, investigating how much of the college’s heating demand a number of geothermal boreholes could provide, when the heat from the building basements is taken into account and when it is not. Measured gas consumption data from the college are used to estimate the heat demand. The geology of the site is obtained by importing historical borehole records for the wider Cambridge area into the British Geological Survey (BGS) Groundhog® Desktop Geoscientific Information System and constraining the domain using BGS generated superficial deposit and bedrock geology maps, thus producing a 3D lithological profile for the region*, while the hydrological conditions were obtained using measured water level time-series data, from water wells in the area, curtesy of the Environment Agency. A total of 88 boreholes are considered, placed symmetrically in the college courtyard, between the main buildings. Typical single U-loop borehole configurations are used with pipes of 32 mm outer diameter. Acknowledging that the effect of heated basements is greater in shallower regions of the subsurface, two typical borehole length values are considered: 50 m, providing about 40% of the required heating load, and 100 m, providing 100%. The operation is simulated over 50 years, using a full 3D numerical model coupling heat transfer, groundwater flow, and pipe flow governing equations, created in COMSOL Multiphysics®. The temperature of the heated basements is assumed to be maintained at 18 °C throughout the simulation. During the first 10 years, the GHEs are not operating, to allow heat accumulation in the ground to occur from the heated basements, following which, 40 years of operating GHEs are simulated. The results of the simulations suggest that an increase in performance occurs when heated basements are present. For all scenarios, the fluid temperatures keep decreasing over time, as the ground temperature around the boreholes keeps decreasing, making it more difficult to extract heat. Over the 50 years of simulation, the fluid temperature reaches a minimum of -3.20 °C and -2.13 °C for the 50 m GHEs, and 4.52 °C and 3.88 °C for 100 m GHEs, in both cases the first value being the simulation with heated basements and the second without. The COP values over time are presented in Figure 1-right, showing the difference in COP between the cases with and without heated basements increasing over time for both 50 m and 100 m GHEs, for the former at a higher rate. This increase corresponds to the increase in the average fluid temperature between the cases with and without heated basements, also shown in the figure, and reaches a maximum difference of about 0.08 for the 50 m GHEs and 0.05 for the 100 m GHEs, corresponding to a fluid temperature difference of about 1.10 °C and 0.65 °C, respectively. These figures correspond to a reduction in operating costs (assuming an electricity rate of £0.34 per kWh) of £17,352 for 50 m GHEs and £18,197 for 100 m GHEs. While for this case these values are relatively small considering 40 years of operation, the fluid temperature difference suggests that more energy can be extracted by the GHE borheoles when heated basements are present, especially for shorter boreholes, and thus potential savings could be obtained by reducing the number of GHEs.
- Open Access
- 15 March 2023
- Published by Taylor & Francis in Journal of Building Performance Simulation
- Vol. 16 (5) , 609-630
The challenges of using live-streamed data in a predictive digital twin
A key component of a digital twin is the monitored data, communicated from the physical system to the virtual representation, for visualization and simulation. Yet little attention has been paid to the practicalities of working with live-streamed data. Strategies are required for providing continuous access and storage, for processing data of indeterminate quality, and for ensuring long-term sustainability of data communication systems. This paper describes design of the data communication infrastructure, 3D visualization and data interpretation tools, and model development and implementation, for an operational digital twin. Conclusions are drawn pertaining to the informativeness of streamed data, key for successful digital twin development and operation. The paper highlights the need for further research into techniques for ensuring data quality and forecasting efficacy. Digital twins operated commercially are rarely described in detail; the discussion provides a basis for future collaborative development of a consistent operational and interactive framework.
- 15 March 2023
- Published by Taylor & Francis in Journal of Building Performance Simulation
- Vol. 16 (5) , 609-630
Open AccessThe challenges of using live-streamed data in a predictive digital twin
A key component of a digital twin is the monitored data, communicated from the physical system to the virtual representation, for visualization and simulation. Yet little attention has been paid to the practicalities of working with live-streamed data. Strategies are required for providing continuous access and storage, for processing data of indeterminate quality, and for ensuring long-term sustainability of data communication systems. This paper describes design of the data communication infrastructure, 3D visualization and data interpretation tools, and model development and implementation, for an operational digital twin. Conclusions are drawn pertaining to the informativeness of streamed data, key for successful digital twin development and operation. The paper highlights the need for further research into techniques for ensuring data quality and forecasting efficacy. Digital twins operated commercially are rarely described in detail; the discussion provides a basis for future collaborative development of a consistent operational and interactive framework.
- Open Access
- 30 September 2021
- Published by Cambridge University Press (CUP) in Data-Centric Engineering
- Vol. 2, e15
Continuous calibration of a digital twin: Comparison of particle filter and Bayesian calibration approaches
Assimilation of continuously streamed monitored data is an essential component of a digital twin; the assimilated data are used to ensure the digital twin represents the monitored system as accurately as possible. One way this is achieved is by calibration of simulation models, whether data-derived or physics-based, or a combination of both. Traditional manual calibration is not possible in this context; hence, new methods are required for continuous calibration. In this paper, a particle filter methodology for continuous calibration of the physics-based model element of a digital twin is presented and applied to an example of an underground farm. The methodology is applied to a synthetic problem with known calibration parameter values prior to being used in conjunction with monitored data. The proposed methodology is compared against static and sequential Bayesian calibration approaches and compares favourably in terms of determination of the distribution of parameter values and analysis run times, both essential requirements. The methodology is shown to be potentially useful as a means to ensure continuing model fidelity.
- 30 September 2021
- Published by Cambridge University Press (CUP) in Data-Centric Engineering
- Vol. 2, e15
Open AccessContinuous calibration of a digital twin: Comparison of particle filter and Bayesian calibration approaches
Assimilation of continuously streamed monitored data is an essential component of a digital twin; the assimilated data are used to ensure the digital twin represents the monitored system as accurately as possible. One way this is achieved is by calibration of simulation models, whether data-derived or physics-based, or a combination of both. Traditional manual calibration is not possible in this context; hence, new methods are required for continuous calibration. In this paper, a particle filter methodology for continuous calibration of the physics-based model element of a digital twin is presented and applied to an example of an underground farm. The methodology is applied to a synthetic problem with known calibration parameter values prior to being used in conjunction with monitored data. The proposed methodology is compared against static and sequential Bayesian calibration approaches and compares favourably in terms of determination of the distribution of parameter values and analysis run times, both essential requirements. The methodology is shown to be potentially useful as a means to ensure continuing model fidelity.
- Open Access
- 3 May 2021
- Published by Taylor & Francis in Journal of Building Performance Simulation
- Vol. 14 (3) , 303-327
A tool for generation of stochastic occupant-based internal loads using a functional data analysis approach to re-define ‘activity’
In building energy simulation (BES), internal loads are typically defined as hourly schedules based on occupant-related ‘activities’ assigned to each building zone. In this paper, a data-centric bottom-up functional data analysis model is used to examine how activities in a building correlate with energy demand for plug loads and lighting. Functional principal component analysis and hierarchical clustering of the principal component scores have been used to explore the links between the data and zone activity. The results show that plug loads show limited links to activity to the extent that the activity determines the variability of the data. The lighting loads show little correlation with zone activity but instead are determined primarily by the building control system. A novel methodology is proposed for the generation of stochastic load data for input into BES. This methodology has been developed into a tool for stochastic load generation which is available online.
- 3 May 2021
- Published by Taylor & Francis in Journal of Building Performance Simulation
- Vol. 14 (3) , 303-327
Open AccessA tool for generation of stochastic occupant-based internal loads using a functional data analysis approach to re-define ‘activity’
In building energy simulation (BES), internal loads are typically defined as hourly schedules based on occupant-related ‘activities’ assigned to each building zone. In this paper, a data-centric bottom-up functional data analysis model is used to examine how activities in a building correlate with energy demand for plug loads and lighting. Functional principal component analysis and hierarchical clustering of the principal component scores have been used to explore the links between the data and zone activity. The results show that plug loads show limited links to activity to the extent that the activity determines the variability of the data. The lighting loads show little correlation with zone activity but instead are determined primarily by the building control system. A novel methodology is proposed for the generation of stochastic load data for input into BES. This methodology has been developed into a tool for stochastic load generation which is available online.
- Open Access
- 17 April 2021
- Published by Taylor & Francis in Journal of Building Performance Simulation
- Vol. 14 (3) , 247-276
Co-simulating a greenhouse in a building to quantify co-benefits of different coupled configurations
Recent findings suggest that rooftop greenhouses could be more efficient when combined with waste streams in buildings, but there is a gap in quantification of the combined performance of building integrated greenhouses. This paper addresses this deficit for school buildings in London, UK, where urban agriculture is of increasing interest. A building energy simulation (BES) of an archetype school building is developed in EnergyPlus and co-simulated with a validated greenhouse energy simulator (GES). The performance of different greenhouse-building coupling configurations is evaluated to estimate the potential for crop growth, heat recovery and reduction in ventilation demand, through a sensitivity analysis and parametric study. Our results show that a 250 m greenhouse on the top floor of the school could produce 6t lettuce with half the energy demand of the same standalone greenhouse. Trade-offs across increase in humidity, yields, and energy efficiency indicate the importance of modelling to ensure optimal designs.- 17 April 2021
- Published by Taylor & Francis in Journal of Building Performance Simulation
- Vol. 14 (3) , 247-276
Open AccessCo-simulating a greenhouse in a building to quantify co-benefits of different coupled configurations
Recent findings suggest that rooftop greenhouses could be more efficient when combined with waste streams in buildings, but there is a gap in quantification of the combined performance of building integrated greenhouses. This paper addresses this deficit for school buildings in London, UK, where urban agriculture is of increasing interest. A building energy simulation (BES) of an archetype school building is developed in EnergyPlus and co-simulated with a validated greenhouse energy simulator (GES). The performance of different greenhouse-building coupling configurations is evaluated to estimate the potential for crop growth, heat recovery and reduction in ventilation demand, through a sensitivity analysis and parametric study. Our results show that a 250 m greenhouse on the top floor of the school could produce 6t lettuce with half the energy demand of the same standalone greenhouse. Trade-offs across increase in humidity, yields, and energy efficiency indicate the importance of modelling to ensure optimal designs. - Open Access
- 1 March 2019
- Published by Taylor & Francis in Journal of Building Performance Simulation
- Vol. 12 (5) , 620-636
A data-centric bottom-up model for generation of stochastic internal load profiles based on space-use type
There is currently no established methodology for the generation of synthetic stochastic internal load profiles for input into building energy simulation. In this paper, a Functional Data Analysis approach is used to propose a new data-centric bottom-up model of plug loads based on hourly data monitored at a high spatial resolution and by space-use type for a case-study building. The model comprises a set of fundamental Principal Components (PCs) that describe the structure of all data samples in terms of amplitude and phase. Scores (or weightings) for each daily demand profile express the contribution of each PC to the demand. Together the principal components and the scores constitute a structure-based model potentially applicable beyond the building considered. The results show good agreement between samples generated using the model and monitored data for key parameters of interest including the timing of the daily peak demand.
- 1 March 2019
- Published by Taylor & Francis in Journal of Building Performance Simulation
- Vol. 12 (5) , 620-636
Open AccessA data-centric bottom-up model for generation of stochastic internal load profiles based on space-use type
There is currently no established methodology for the generation of synthetic stochastic internal load profiles for input into building energy simulation. In this paper, a Functional Data Analysis approach is used to propose a new data-centric bottom-up model of plug loads based on hourly data monitored at a high spatial resolution and by space-use type for a case-study building. The model comprises a set of fundamental Principal Components (PCs) that describe the structure of all data samples in terms of amplitude and phase. Scores (or weightings) for each daily demand profile express the contribution of each PC to the demand. Together the principal components and the scores constitute a structure-based model potentially applicable beyond the building considered. The results show good agreement between samples generated using the model and monitored data for key parameters of interest including the timing of the daily peak demand.
- Open Access
- 1 July 2016
- Published by Elsevier in Energy and Buildings
- Vol. 123, 92-105
Exploring the impact of different parameterisations of occupant-related internal loads in building energy simulation
- 1 July 2016
- Published by Elsevier in Energy and Buildings
- Vol. 123, 92-105
Open AccessExploring the impact of different parameterisations of occupant-related internal loads in building energy simulation
- 1 April 2014
- Published by Elsevier in Building and Environment
- Vol. 74, 132-148
A bottom-up energy analysis across a diverse urban building portfolio: retrofits for the buildings at the Royal Botanic Gardens, Kew, UK
- 1 April 2014
- Published by Elsevier in Building and Environment
- Vol. 74, 132-148
A bottom-up energy analysis across a diverse urban building portfolio: retrofits for the buildings at the Royal Botanic Gardens, Kew, UK