Irwansyah Irwansyah
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Irwansyah Irwansyah has a total of 15 co-authors. Here are the top co-authors by number of shared publications:
- Arhami Arhami
Universitas Syiah Kuala
1 shared publication - Edy Fradinata
Universitas Syiah Kuala
1 shared publication Husni Husni
Universitas Syiah Kuala
1 shared publicationIkramullah Muhammad
1 shared publicationIsrar B.M. Ibrahim
1 shared publication- Jiing-Yih Lai
National Central University, Taoyuan, Taiwan
1 shared publication
Latest Publications
- Open Access
- 16 September 2026
- Published by Elsevier in Results in Engineering
- Vol. 32
From ventilation compliance to performance: experimental and cfd analysis of supply–exhaust design for airborne infection isolation rooms
- 16 September 2026
- Published by Elsevier in Results in Engineering
- Vol. 32
Open AccessFrom ventilation compliance to performance: experimental and cfd analysis of supply–exhaust design for airborne infection isolation rooms
- Open Access
- 31 December 2024
- Published by Universitas Muhammadiyah Surakarta in Jurnal Ilmiah Teknik Industri
- p. 297-307
Analysis of The Application of Lean Distribution on Urea Fertilizer Products in Minimizing Waste with Arena Simulation (Case Study PT. Pupuk Iskandar Muda, North Aceh).
PT. PIM is a company operating in the fertilizer industry. The main issue lies in prolonged lead times within the distribution process, causing inefficiencies and resulting in waste during distribution activities. The concept of Lean Distribution focuses on managing strategic distribution processes effectively and efficiently to reduce waste. The results of Big Picture Mapping and Process Activity Mapping identified six distribution groupings involving 20 activities with a total time of 343 minutes. Waste identification using Arena Simulation revealed three activities experiencing waiting time (waste): unloading goods (428.41 minutes), placing fertilizer onto trucks (55.55 minutes), and truck inspection at the warehouse (0.38 minutes). Proposed improvements include reducing time in activity 6 by 9%, activity 8 by 26%, and activity 20 by 28.8%. The results of the Arena Simulation indicate that scenario 6 achieves the highest efficiency, with a time reduction of 36.4%, resulting in a total time of 20 minutes.
- 31 December 2024
- Published by Universitas Muhammadiyah Surakarta in Jurnal Ilmiah Teknik Industri
- p. 297-307
Open AccessAnalysis of The Application of Lean Distribution on Urea Fertilizer Products in Minimizing Waste with Arena Simulation (Case Study PT. Pupuk Iskandar Muda, North Aceh).
PT. PIM is a company operating in the fertilizer industry. The main issue lies in prolonged lead times within the distribution process, causing inefficiencies and resulting in waste during distribution activities. The concept of Lean Distribution focuses on managing strategic distribution processes effectively and efficiently to reduce waste. The results of Big Picture Mapping and Process Activity Mapping identified six distribution groupings involving 20 activities with a total time of 343 minutes. Waste identification using Arena Simulation revealed three activities experiencing waiting time (waste): unloading goods (428.41 minutes), placing fertilizer onto trucks (55.55 minutes), and truck inspection at the warehouse (0.38 minutes). Proposed improvements include reducing time in activity 6 by 9%, activity 8 by 26%, and activity 20 by 28.8%. The results of the Arena Simulation indicate that scenario 6 achieves the highest efficiency, with a time reduction of 36.4%, resulting in a total time of 20 minutes.
- 27 May 2019
- Published by National Taiwan University in Biomedical Engineering: Applications, Basis and Communications
- Vol. 31 (03)
REPOSITIONING BONE FRAGMENTS USING REGISTRATION OF PAIRED-POINTS AND ASSISTED-CONSTRAINTS IN VIRTUAL BONE REDUCTION SURGERY
When repositioning fractured bones in orthopedic surgery, correctness and accuracy are vital to allow the bone to regain the function and facial aesthetics of native uninjured bone. Various improve...
- 27 May 2019
- Published by National Taiwan University in Biomedical Engineering: Applications, Basis and Communications
- Vol. 31 (03)
REPOSITIONING BONE FRAGMENTS USING REGISTRATION OF PAIRED-POINTS AND ASSISTED-CONSTRAINTS IN VIRTUAL BONE REDUCTION SURGERY
When repositioning fractured bones in orthopedic surgery, correctness and accuracy are vital to allow the bone to regain the function and facial aesthetics of native uninjured bone. Various improve...