Iurii Teslia
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Iurii Teslia has a total of 31 co-authors. Here are the top co-authors by number of shared publications:
- Iulia Khlevna
Taras Shevchenko National University of Kyiv
14 shared publications - Oleksii Yehorchenkov
Slovak University of Technology in Bratislava
14 shared publications - Nataliia Yehorchenkova
Slovak University of Technology in Bratislava
11 shared publications - Yevheniia Kataieva
Slovak University of Technology in Bratislava, Slovakia
10 shared publications - Tatiana Latysheva
Taras Shevchenko National University of Kyiv
8 shared publications - Andrii Khlevnyi
Taras Shevchenko National University of Kyiv
7 shared publications
Latest Publications
- Open Access
- 13 September 2026
- Published by Elsevier in SSRN Electronic Journal
Integrating Industrial Information for Ultra-Fast Critical Management: Digital Twin and reflex-based intelligent system
This study examines the control of technical systems in critical situations, where the time required for an adverse effect to develop may be comparable to, or shorter than, the information-processing time in a traditional control loop. To overcome this limitation, a new concept for industrial information integration is proposed. It combines disparate data from a technical system and its operating environment, a digital twin, an environmental model, forecasting tools, and a reflex-based intelligent system into a single information and control space. As part of this integration, the digital twin and environmental model generate forecasts of the system's probable future state. The reflex-based intelligent system converts this information into ultra-fast control responses to emerging critical situations. The main scientific result of the study is a methodological basis for industrial information integration, including the integration concept, a reflex-based response model, a response generation method, and an information space structure for controlling technical systems in critical situations. The developed tools were tested for additive manufacturing and wire arc welding on marine vessels in a dynamically changing environment. Experiments were conducted to evaluate the computational efficiency of an intelligent reflex-based system for selecting responses to critical events. The study lays an information and methodological foundation for ultra-fast control of technical systems in critical situations by integrating industrial information.
- 13 September 2026
- Published by Elsevier in SSRN Electronic Journal
Open AccessIntegrating Industrial Information for Ultra-Fast Critical Management: Digital Twin and reflex-based intelligent system
This study examines the control of technical systems in critical situations, where the time required for an adverse effect to develop may be comparable to, or shorter than, the information-processing time in a traditional control loop. To overcome this limitation, a new concept for industrial information integration is proposed. It combines disparate data from a technical system and its operating environment, a digital twin, an environmental model, forecasting tools, and a reflex-based intelligent system into a single information and control space. As part of this integration, the digital twin and environmental model generate forecasts of the system's probable future state. The reflex-based intelligent system converts this information into ultra-fast control responses to emerging critical situations. The main scientific result of the study is a methodological basis for industrial information integration, including the integration concept, a reflex-based response model, a response generation method, and an information space structure for controlling technical systems in critical situations. The developed tools were tested for additive manufacturing and wire arc welding on marine vessels in a dynamically changing environment. Experiments were conducted to evaluate the computational efficiency of an intelligent reflex-based system for selecting responses to critical events. The study lays an information and methodological foundation for ultra-fast control of technical systems in critical situations by integrating industrial information.
- Open Access
- 20 January 2026
- Published by Wiley in International Journal of Intelligent Systems
- Vol. 2026 (1)
Development of a Method for Managing Changes in a Project Based on Modeling Its Implementation With Digital Twins
The object of the study is the processes of managing project changes. The research problem concerns the development of a change management method that, based on the simulation of project execution within a digital twins environment, enables the prediction and effective management of the most probable and impactful changes. The influence of current trends on the development of digital technologies was analyzed. The necessity of applying digitalization methods to enhance the efficiency of project management was identified. It was demonstrated that digital twin–based modeling of project processes and changes provides a foundation for developing optimal management strategies. A concept for utilizing digital twins of project objects and processes to support effective change management was proposed. The goals and objectives of the study were formulated, focusing on the development of a change management method for projects based on their representation through digital twins. It was shown that modeling the impact of changes on project execution requires the application of models and methods for managing the interaction of project processes based on digital twins. The structure of the digital twin environment for projects was defined, within which the causes and impacts of changes on projects were modeled, as well as the interaction model of digital twins during project implementation, and a method for forecasting and assessing the effect of changes on project execution was developed. A method and practical tools for managing changes in projects of the developer company ICD Investments have been developed and tested in practice.
- 20 January 2026
- Published by Wiley in International Journal of Intelligent Systems
- Vol. 2026 (1)
Open AccessDevelopment of a Method for Managing Changes in a Project Based on Modeling Its Implementation With Digital Twins
The object of the study is the processes of managing project changes. The research problem concerns the development of a change management method that, based on the simulation of project execution within a digital twins environment, enables the prediction and effective management of the most probable and impactful changes. The influence of current trends on the development of digital technologies was analyzed. The necessity of applying digitalization methods to enhance the efficiency of project management was identified. It was demonstrated that digital twin–based modeling of project processes and changes provides a foundation for developing optimal management strategies. A concept for utilizing digital twins of project objects and processes to support effective change management was proposed. The goals and objectives of the study were formulated, focusing on the development of a change management method for projects based on their representation through digital twins. It was shown that modeling the impact of changes on project execution requires the application of models and methods for managing the interaction of project processes based on digital twins. The structure of the digital twin environment for projects was defined, within which the causes and impacts of changes on projects were modeled, as well as the interaction model of digital twins during project implementation, and a method for forecasting and assessing the effect of changes on project execution was developed. A method and practical tools for managing changes in projects of the developer company ICD Investments have been developed and tested in practice.
- Open Access
- 30 October 2024
- Published by Private Company Technology Center in Eastern-European Journal of Enterprise Technologies
- Vol. 5 (3 (131)) , 6-17
Development of a concept of combined project-production activities planning using digital twins
The object of the study is the project-production activity of project-oriented enterprises in the fields of mechanical engineering, aircraft construction, shipbuilding, instrumentation, and metallurgy. The problem addressed was the informational integration and synchronization of project management processes, implemented by a specific project-oriented enterprise, with the management of its production processes using digital twins. The solution to this problem is aimed at improving the efficiency of project-production management by utilizing digital twins of projects and production in the planning process. The influence of trends on the development of digital technologies was analysed. The need to consider both project and operational activities of enterprises in mechanical engineering, aircraft construction, shipbuilding, instrumentation, and metallurgy as a single project-production activity was identified. It was shown that this approach can be successful when processes and changes in project-production activity can be modelled, forming a rational plan for product release and project execution. The use of digital twins for objects and processes in project-production activities was proposed. The aim and objectives of the study were formulated, focusing on the creation of a concept for planning project-production activities using digital twins for objects and processes in both project and operational activities. The concept defines the structure of the digital environment for project-oriented production, a model of the interpenetration of project and production planning processes, an aggregated critical path method, and simulation modelling for planning project-production activities using digital twins. It was shown that to model project-production activities, models and methods for managing the interaction between the operational and project processes of the company must be applied. It was proposed to use the scientific and practical tools of information interaction theory to manage this interaction. The results of applying the concept in project-oriented companies were demonstrated. The use of tools created based on the proposed concept allowed a reduction in project execution time by 10–15 % and a decrease in production costs by 5–10 % due to effective planning of project-production processes The object of the study is the project-production activity of project-oriented enterprises in the fields of mechanical engineering, aircraft construction, shipbuilding, instrumentation, and metallurgy. The problem addressed was the informational integration and synchronization of project management processes, implemented by a specific project-oriented enterprise, with the management of its production processes using digital twins. The solution to this problem is aimed at improving the efficiency of project-production management by utilizing digital twins of projects and production in the planning process. The influence of trends on the development of digital technologies was analysed. The need to consider both project and operational activities of enterprises in mechanical engineering, aircraft construction, shipbuilding, instrumentation, and metallurgy as a single project-production activity was identified. It was shown that this approach can be successful when processes and changes in project-production activity can be modelled, forming a rational plan for product release and project execution. The use of digital twins for objects and processes in project-production activities was proposed. The aim and objectives of the study were formulated, focusing on the creation of a concept for planning project-production activities using digital twins for objects and processes in both project and operational activities. The concept defines the structure of the digital environment for project-oriented production, a model of the interpenetration of project and production planning processes, an aggregated critical path method, and simulation modelling for planning project-production activities using digital twins. It was shown that to model project-production activities, models and methods for managing the interaction between the operational and project processes of the company must be applied. It was proposed to use the scientific and practical tools of information interaction theory to manage this interaction. The results of applying the concept in project-oriented companies were demonstrated. The use of tools created based on the proposed concept allowed a reduction in project execution time by 10–15 % and a decrease in production costs by 5–10 % due to effective planning of project-production processes
- 30 October 2024
- Published by Private Company Technology Center in Eastern-European Journal of Enterprise Technologies
- Vol. 5 (3 (131)) , 6-17
Open AccessDevelopment of a concept of combined project-production activities planning using digital twins
The object of the study is the project-production activity of project-oriented enterprises in the fields of mechanical engineering, aircraft construction, shipbuilding, instrumentation, and metallurgy. The problem addressed was the informational integration and synchronization of project management processes, implemented by a specific project-oriented enterprise, with the management of its production processes using digital twins. The solution to this problem is aimed at improving the efficiency of project-production management by utilizing digital twins of projects and production in the planning process. The influence of trends on the development of digital technologies was analysed. The need to consider both project and operational activities of enterprises in mechanical engineering, aircraft construction, shipbuilding, instrumentation, and metallurgy as a single project-production activity was identified. It was shown that this approach can be successful when processes and changes in project-production activity can be modelled, forming a rational plan for product release and project execution. The use of digital twins for objects and processes in project-production activities was proposed. The aim and objectives of the study were formulated, focusing on the creation of a concept for planning project-production activities using digital twins for objects and processes in both project and operational activities. The concept defines the structure of the digital environment for project-oriented production, a model of the interpenetration of project and production planning processes, an aggregated critical path method, and simulation modelling for planning project-production activities using digital twins. It was shown that to model project-production activities, models and methods for managing the interaction between the operational and project processes of the company must be applied. It was proposed to use the scientific and practical tools of information interaction theory to manage this interaction. The results of applying the concept in project-oriented companies were demonstrated. The use of tools created based on the proposed concept allowed a reduction in project execution time by 10–15 % and a decrease in production costs by 5–10 % due to effective planning of project-production processes The object of the study is the project-production activity of project-oriented enterprises in the fields of mechanical engineering, aircraft construction, shipbuilding, instrumentation, and metallurgy. The problem addressed was the informational integration and synchronization of project management processes, implemented by a specific project-oriented enterprise, with the management of its production processes using digital twins. The solution to this problem is aimed at improving the efficiency of project-production management by utilizing digital twins of projects and production in the planning process. The influence of trends on the development of digital technologies was analysed. The need to consider both project and operational activities of enterprises in mechanical engineering, aircraft construction, shipbuilding, instrumentation, and metallurgy as a single project-production activity was identified. It was shown that this approach can be successful when processes and changes in project-production activity can be modelled, forming a rational plan for product release and project execution. The use of digital twins for objects and processes in project-production activities was proposed. The aim and objectives of the study were formulated, focusing on the creation of a concept for planning project-production activities using digital twins for objects and processes in both project and operational activities. The concept defines the structure of the digital environment for project-oriented production, a model of the interpenetration of project and production planning processes, an aggregated critical path method, and simulation modelling for planning project-production activities using digital twins. It was shown that to model project-production activities, models and methods for managing the interaction between the operational and project processes of the company must be applied. It was proposed to use the scientific and practical tools of information interaction theory to manage this interaction. The results of applying the concept in project-oriented companies were demonstrated. The use of tools created based on the proposed concept allowed a reduction in project execution time by 10–15 % and a decrease in production costs by 5–10 % due to effective planning of project-production processes
- 8 October 2024
- Published by Springer Nature
- p. 77-88
Application of Digital Twins of Project-Oriented Productions in Digital Project Management
- 8 October 2024
- Published by Springer Nature
- p. 77-88
Application of Digital Twins of Project-Oriented Productions in Digital Project Management
- Open Access
- 28 December 2023
- Published by Private Company Technology Center in Eastern-European Journal of Enterprise Technologies
- Vol. 6 (3 (126)) , 36-46
Devising a multi-project approach to the formation of portfolios for restoration and development of territories within the concept of strategic investments and development packages of the STINBALEF project
This work relates to devising an approach to the formation of portfolios of restoration and development projects of territories. The object of research is the processes of development and restoration of territories. The subject of the study is the process of forming portfolios of development and restoration projects. The problem being solved is to devise an approach to the formation of project portfolios focused on the processes of development and restoration of territories. The peculiarities of the organization of the processes of development and restoration of territories have been defined. It is shown that development and restoration projects are usually associated with the need to create many related products. Therefore, a multi-project approach was determined as the main one for the formation of portfolios of restoration and development projects of territories. A method to form multi-project portfolios using the cost-benefit concept has been developed. It is proposed to use the value created by the products of the sub-projects for the population of the territories as benefits. A multi-project planning model was built, taking into account the cause-and-effect relationships between individual sub-projects. A feature of the model is that the products of subprojects are the object of planning. Vector analysis was used to determine the value of individual products, which makes it possible to establish the order of their creation in accordance with the cause-and-effect relationships between them. The approach, method, and model were practically validated within the framework of actual scenarios of infrastructure development of the Košice Self-Governing Region on 4 classes of multi-projects, which were divided into sub-projects and were successfully implemented. The devised approach, method, and model could be used to solve the tasks necessary for the restoration of the territories in Ukraine
- 28 December 2023
- Published by Private Company Technology Center in Eastern-European Journal of Enterprise Technologies
- Vol. 6 (3 (126)) , 36-46
Open AccessDevising a multi-project approach to the formation of portfolios for restoration and development of territories within the concept of strategic investments and development packages of the STINBALEF project
This work relates to devising an approach to the formation of portfolios of restoration and development projects of territories. The object of research is the processes of development and restoration of territories. The subject of the study is the process of forming portfolios of development and restoration projects. The problem being solved is to devise an approach to the formation of project portfolios focused on the processes of development and restoration of territories. The peculiarities of the organization of the processes of development and restoration of territories have been defined. It is shown that development and restoration projects are usually associated with the need to create many related products. Therefore, a multi-project approach was determined as the main one for the formation of portfolios of restoration and development projects of territories. A method to form multi-project portfolios using the cost-benefit concept has been developed. It is proposed to use the value created by the products of the sub-projects for the population of the territories as benefits. A multi-project planning model was built, taking into account the cause-and-effect relationships between individual sub-projects. A feature of the model is that the products of subprojects are the object of planning. Vector analysis was used to determine the value of individual products, which makes it possible to establish the order of their creation in accordance with the cause-and-effect relationships between them. The approach, method, and model were practically validated within the framework of actual scenarios of infrastructure development of the Košice Self-Governing Region on 4 classes of multi-projects, which were divided into sub-projects and were successfully implemented. The devised approach, method, and model could be used to solve the tasks necessary for the restoration of the territories in Ukraine
- Open Access
- 31 August 2023
- Published by Private Company Technology Center in Eastern-European Journal of Enterprise Technologies
- Vol. 4 (3 (124)) , 6-18
Development of the concept of building a corporate standard of portfolio management in the course of territory restoration planning in the context of Making-City project
It is shown that at the current stage, there is an important issue of creating portfolio management standards that could be successfully used for the post-war reconstruction of the territory of Ukraine. The object of research in this work is the process of restoration of the territory of Ukraine. The problem to be solved is the development of principles, processes, functions and models that underlie the portfolio management standard for territory restoration. Specific features of territory restoration projects are formulated. An analysis of existing approaches to the management of territory restoration in Ukraine, as well as to portfolio management standards, was performed. The experience of the Making-City project was taken as a basis. It is shown that for such complex projects distributed in time and territory, there is no scientific basis for building portfolio management standards. Based on the selected features of territory restoration projects, the principles and approach to building a corporate standard of portfolio management are formulated. It is proposed to include 9 portfolio management processes of territory restoration projects in the portfolio management standard. To implement these processes, the functions of managing portfolios of projects and programs have been allocated, the regulation of which should be included in the standard of portfolio management of territory restoration. Previous use of the portfolio management standard for development projects has shown that such a standard can be used for reconstruction projects of the territory of Ukraine in the post-war period. The developed principles, processes, functions and models of their implementation can be used to solve extreme tasks for the restoration of the territory of Ukraine
- 31 August 2023
- Published by Private Company Technology Center in Eastern-European Journal of Enterprise Technologies
- Vol. 4 (3 (124)) , 6-18
Open AccessDevelopment of the concept of building a corporate standard of portfolio management in the course of territory restoration planning in the context of Making-City project
It is shown that at the current stage, there is an important issue of creating portfolio management standards that could be successfully used for the post-war reconstruction of the territory of Ukraine. The object of research in this work is the process of restoration of the territory of Ukraine. The problem to be solved is the development of principles, processes, functions and models that underlie the portfolio management standard for territory restoration. Specific features of territory restoration projects are formulated. An analysis of existing approaches to the management of territory restoration in Ukraine, as well as to portfolio management standards, was performed. The experience of the Making-City project was taken as a basis. It is shown that for such complex projects distributed in time and territory, there is no scientific basis for building portfolio management standards. Based on the selected features of territory restoration projects, the principles and approach to building a corporate standard of portfolio management are formulated. It is proposed to include 9 portfolio management processes of territory restoration projects in the portfolio management standard. To implement these processes, the functions of managing portfolios of projects and programs have been allocated, the regulation of which should be included in the standard of portfolio management of territory restoration. Previous use of the portfolio management standard for development projects has shown that such a standard can be used for reconstruction projects of the territory of Ukraine in the post-war period. The developed principles, processes, functions and models of their implementation can be used to solve extreme tasks for the restoration of the territory of Ukraine
- Open Access
- 30 April 2023
- Published by Private Company Technology Center in Eastern-European Journal of Enterprise Technologies
- Vol. 2 (3 (122)) , 82-94
Development of a multilingual intelligent project planning and monitoring system
The object of research of this work is the processes of project planning and monitoring. The solved problem is the development of a model, method and structures of a multilingual intelligent project planning and monitoring system and its experimental verification of the ability to understand the statements of managers in different languages. The requirements for such a system are formulated. An analysis of the existing theoretical and practical developments in this area was carried out. It was established that there are no developments in the field of project management that can adapt to new natural languages. It was found that the formulated requirements can be satisfied within the framework of the reflexive approach. It is characterized by simplicity, continuity, and insensitivity to errors in natural language statements. To confirm these assumptions, an experimental multilingual project planning and monitoring system and experimental research methodology were developed. The results of the experiments obtained during the use of the created experimental system testify to the correct identification of the content of appeals to the intellectual system in 6 languages with a probability higher than 0.99, and to recognize the structure of statements with a probability higher than 0.98. And the time for configuring the system to work with a new language did not exceed 1 hour. This allows to use it for practical work in distributed management systems for remote interaction of managers and specialists with the system in different languages. The conducted experiments confirmed the assumption about the effectiveness of the reflexive approach for creating project management systems. The developed model, method, structures, and system can be used for different types of projects, such as regional development projects, IT, etc.
- 30 April 2023
- Published by Private Company Technology Center in Eastern-European Journal of Enterprise Technologies
- Vol. 2 (3 (122)) , 82-94
Open AccessDevelopment of a multilingual intelligent project planning and monitoring system
The object of research of this work is the processes of project planning and monitoring. The solved problem is the development of a model, method and structures of a multilingual intelligent project planning and monitoring system and its experimental verification of the ability to understand the statements of managers in different languages. The requirements for such a system are formulated. An analysis of the existing theoretical and practical developments in this area was carried out. It was established that there are no developments in the field of project management that can adapt to new natural languages. It was found that the formulated requirements can be satisfied within the framework of the reflexive approach. It is characterized by simplicity, continuity, and insensitivity to errors in natural language statements. To confirm these assumptions, an experimental multilingual project planning and monitoring system and experimental research methodology were developed. The results of the experiments obtained during the use of the created experimental system testify to the correct identification of the content of appeals to the intellectual system in 6 languages with a probability higher than 0.99, and to recognize the structure of statements with a probability higher than 0.98. And the time for configuring the system to work with a new language did not exceed 1 hour. This allows to use it for practical work in distributed management systems for remote interaction of managers and specialists with the system in different languages. The conducted experiments confirmed the assumption about the effectiveness of the reflexive approach for creating project management systems. The developed model, method, structures, and system can be used for different types of projects, such as regional development projects, IT, etc.
- Open Access
- 30 December 2022
- Published by Private Company Technology Center in Eastern-European Journal of Enterprise Technologies
- Vol. 6 (3 (120)) , 14-25
Development of the concept of building project management systems in the context of digital transformation of project-oriented companies
An analysis of the impact of new global trends, such as Industry 4.0, on project-oriented companies was performed. Based on the analysis, the research problem is formulated, which consists in the need to create project management systems in accordance with the concepts, ideas, principles and methods of digital transformation of project-oriented companies. Project management processes in the conditions of digital transformation of project-oriented companies are defined as the object of research. An approach to the creation of project management systems is proposed, which is based on the need to adapt the organizational, methodological and technological components of these systems to the specifics of a project-oriented company and the conditions of digital transformation. Based on this approach, the methodological, organizational and technological components of project management systems were improved. As part of the organizational component, a structural and functional model of project management is proposed, which takes into account the conditions of digital transformation of a project-oriented company. Within the framework of the methodological component, it is proposed to use management meta-methodology to create a project management methodology specific to the company's conditions and digital transformation processes. A digital interpretation of matrix information technologies for the technological component is proposed. An organizational and technological model of implementation of project management systems in the conditions of digital transformation of companies was developed. The conditions for the practical use of the concept are given: the systematic organization of the digital space and the availability of qualified specialists in the creation of project management systems. The implementation of the concept made it possible to reduce the project execution time by 5–20 %, as well as project cost due to more rhythmic work performance
- 30 December 2022
- Published by Private Company Technology Center in Eastern-European Journal of Enterprise Technologies
- Vol. 6 (3 (120)) , 14-25
Open AccessDevelopment of the concept of building project management systems in the context of digital transformation of project-oriented companies
An analysis of the impact of new global trends, such as Industry 4.0, on project-oriented companies was performed. Based on the analysis, the research problem is formulated, which consists in the need to create project management systems in accordance with the concepts, ideas, principles and methods of digital transformation of project-oriented companies. Project management processes in the conditions of digital transformation of project-oriented companies are defined as the object of research. An approach to the creation of project management systems is proposed, which is based on the need to adapt the organizational, methodological and technological components of these systems to the specifics of a project-oriented company and the conditions of digital transformation. Based on this approach, the methodological, organizational and technological components of project management systems were improved. As part of the organizational component, a structural and functional model of project management is proposed, which takes into account the conditions of digital transformation of a project-oriented company. Within the framework of the methodological component, it is proposed to use management meta-methodology to create a project management methodology specific to the company's conditions and digital transformation processes. A digital interpretation of matrix information technologies for the technological component is proposed. An organizational and technological model of implementation of project management systems in the conditions of digital transformation of companies was developed. The conditions for the practical use of the concept are given: the systematic organization of the digital space and the availability of qualified specialists in the creation of project management systems. The implementation of the concept made it possible to reduce the project execution time by 5–20 %, as well as project cost due to more rhythmic work performance
- 30 June 2022
- Published by Astana IT University in Scientific Journal of Astana IT University
- Vol. 10 (10) , 119-132
APPROACH AND STRUCTURE OF SPECIAL ORGANIZATIONAL, METHODOLOGICAL AND TECHNOLOGICAL COMPONENTS OF PROJECT AND PROGRAM PORTFOLIO MANAGEMENT SYSTEMS
The functional limitations of modern corporate project and program management systems are presented. It is shown that the main limitation of such systems is connected with the weak implementation of organizational and methodological components, especially in the processes of project and program portfolio management. The structure of project and program portfolio management system, focused on the management of project portfolios in project-oriented companies, is proposed. The necessity of creating project and program portfolio management system in the companies involved in the implementation of a significant number of complex projects is justified. It was shown that since such systems combine organizational and methodological components, they are highly dependent on the construction of the project-oriented company itself. On its organizational structure, company management processes, peculiarities of the production process and its management. The consequence of this is the uniqueness of project and program portfolio management system. Description of organizational, methodological, and technological components of such system is given. The distinctive features of these components in different companies are described. It is shown that the organization of 3P-management is based on the creation of a service engaged in the implementation of project management in the company. The methodological component of project and program portfolio management system should be based on project management meta-methodology. And information technology should be based on a matrix model of interaction between company management tools and projects. The ways of integration of organizational, methodological and technological components of project and program portfolio management systems based on the implementation of a system-forming project of creating a project and program portfolio management system are presented.
- 30 June 2022
- Published by Astana IT University in Scientific Journal of Astana IT University
- Vol. 10 (10) , 119-132
APPROACH AND STRUCTURE OF SPECIAL ORGANIZATIONAL, METHODOLOGICAL AND TECHNOLOGICAL COMPONENTS OF PROJECT AND PROGRAM PORTFOLIO MANAGEMENT SYSTEMS
The functional limitations of modern corporate project and program management systems are presented. It is shown that the main limitation of such systems is connected with the weak implementation of organizational and methodological components, especially in the processes of project and program portfolio management. The structure of project and program portfolio management system, focused on the management of project portfolios in project-oriented companies, is proposed. The necessity of creating project and program portfolio management system in the companies involved in the implementation of a significant number of complex projects is justified. It was shown that since such systems combine organizational and methodological components, they are highly dependent on the construction of the project-oriented company itself. On its organizational structure, company management processes, peculiarities of the production process and its management. The consequence of this is the uniqueness of project and program portfolio management system. Description of organizational, methodological, and technological components of such system is given. The distinctive features of these components in different companies are described. It is shown that the organization of 3P-management is based on the creation of a service engaged in the implementation of project management in the company. The methodological component of project and program portfolio management system should be based on project management meta-methodology. And information technology should be based on a matrix model of interaction between company management tools and projects. The ways of integration of organizational, methodological and technological components of project and program portfolio management systems based on the implementation of a system-forming project of creating a project and program portfolio management system are presented.
- 28 April 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-6
Development of Reflex Technology of Action Identification in Project Planning Systems
The need for intellectualization of project management processes is shown, in particular, the creation of intelligent systems capable of effectively plan projects in the process of natural-language interaction with the project team. The analysis of existing theoretical and practical developments in this field is carried out. It is shown that the issue of intellectualization of the project planning process is still open. It is proposed to use a reflex approach to building an intelligent project planning system. The technology of reflex identification of actions in project planning systems, based on the model of non-force (information) interaction, is proposed. Scenarios of actions have been developed and their distribution has been performed in accordance with the content of natural language requests to the project planning system. Experimental studies are shown a high probability of correct recognition of actions in project planning systems from natural language requests of project team members. The results of the conducted experiments unequivocally testify to the effectiveness of the developed information technology of reflex identification of action scenarios in project planning systems.
- 28 April 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-6
Development of Reflex Technology of Action Identification in Project Planning Systems
The need for intellectualization of project management processes is shown, in particular, the creation of intelligent systems capable of effectively plan projects in the process of natural-language interaction with the project team. The analysis of existing theoretical and practical developments in this field is carried out. It is shown that the issue of intellectualization of the project planning process is still open. It is proposed to use a reflex approach to building an intelligent project planning system. The technology of reflex identification of actions in project planning systems, based on the model of non-force (information) interaction, is proposed. Scenarios of actions have been developed and their distribution has been performed in accordance with the content of natural language requests to the project planning system. Experimental studies are shown a high probability of correct recognition of actions in project planning systems from natural language requests of project team members. The results of the conducted experiments unequivocally testify to the effectiveness of the developed information technology of reflex identification of action scenarios in project planning systems.