Sivarami Reddy Narapureddy
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Sivarami Reddy Narapureddy has a total of 18 co-authors. Here are the top co-authors by number of shared publications:
K. Prahlada Rao
Mechanical Engineering Department, JNTUA College of Engineering, Ananthapuram, Andhra Pradesh, India
6 shared publicationsD. V. Ramamurthy
Satya Institute of Technology and Management, Vizianagarm, Andhra Pradesh, India
5 shared publicationsM. Padma Lalitha
Electrical and Electronics Engineering Department, Annamacharya Institute of Technology Sciences, Rajampet, Andhra Pradesh, India
4 shared publications- M. Padma Lalitha
Electrical and Electronics Engineering Department, Annamacharya University, Rajampet, Andhra Pradesh, India
3 shared publications Venkata Ramamurthy Dwivedula
Satya Inst Technol & Management, Vizianagarm, AP, India
3 shared publicationsD.V. Ramamurthy
Satya Institute of Technology and Management
2 shared publications
Latest Publications
- 2 June 2026
- Published by World Scientific Pub Co Pte Ltd in Journal of Advanced Manufacturing Systems
- p. 1-40
Minimization of Makespan Without Tool Delay in a Multi-Machine FMS Using Crow Search Algorithm
This paper addresses the concurrent scheduling of machines, tools, and automated guided vehicles (AGVs), within a multi-machine flexible manufacturing system (FMS). It aims to minimize makespan (MKSN) by utilizing fewer copies of each tool category, while accounting for transport times across machines to avoid tool delays. Many machines share a central tool magazine (CTM) for storing tools. AGVs and tool transporters (TT) move jobs and tools between machines. The parallel scheduling problem is inherently complex, as it requires computing the minimum number of tool copies for each type, allocating tool copies and AGVs to job operations (jb-opns), sequencing jb-opns on machines, and managing associated trip operations, including both empty and loaded AGV trip times. This study proposes a crow search algorithm (CSA) based on the crow’s intelligence and a nonlinear mixed integer programming (MIP) framework to represent and solve the concurrent scheduling problem. An industrial problem at a manufacturing firm is used to verify the process. The findings indicate that using an extra copy for one tool category, along with a copy for each subsequent tool type, would avoid tool delay and reduce MKSN, and CSA surpasses the performance of the Symbiotic Organisms Search Algorithm (SOSA).
- 2 June 2026
- Published by World Scientific Pub Co Pte Ltd in Journal of Advanced Manufacturing Systems
- p. 1-40
Minimization of Makespan Without Tool Delay in a Multi-Machine FMS Using Crow Search Algorithm
This paper addresses the concurrent scheduling of machines, tools, and automated guided vehicles (AGVs), within a multi-machine flexible manufacturing system (FMS). It aims to minimize makespan (MKSN) by utilizing fewer copies of each tool category, while accounting for transport times across machines to avoid tool delays. Many machines share a central tool magazine (CTM) for storing tools. AGVs and tool transporters (TT) move jobs and tools between machines. The parallel scheduling problem is inherently complex, as it requires computing the minimum number of tool copies for each type, allocating tool copies and AGVs to job operations (jb-opns), sequencing jb-opns on machines, and managing associated trip operations, including both empty and loaded AGV trip times. This study proposes a crow search algorithm (CSA) based on the crow’s intelligence and a nonlinear mixed integer programming (MIP) framework to represent and solve the concurrent scheduling problem. An industrial problem at a manufacturing firm is used to verify the process. The findings indicate that using an extra copy for one tool category, along with a copy for each subsequent tool type, would avoid tool delay and reduce MKSN, and CSA surpasses the performance of the Symbiotic Organisms Search Algorithm (SOSA).
- 7 February 2026
- Published by World Scientific Pub Co Pte Ltd in Journal of Advanced Manufacturing Systems
- p. 1-40
Makespan Minimization in a Multi-Machine FMS with Tooling Constraints Considering Job and Tool Transfer Times Using Crow Search Algorithm
This paper addresses concurrent scheduling of machines, automated guided vehicles (AGVs), tools, and the tool transporter (TT) in a multi-machine flexible manufacturing system (FMS), considering tool and job transport times to minimize makespan (MKSN). However, due to financial constraints, only one copy of each tool type is offered. These tools are placed in a central tool magazine (CTM), which is shared with numerous machines. The problem is the allocation of machines, tool assignment, job-operation sequencing, and trip operations, including TT and AGVs’ empty and laden trip times for MKSN minimization. This study introduces a mixed nonlinear integer programming model to model the problem, and a crow search algorithm (CSA) based on the clever behavior of crows is used to solve it. Results are tabulated, examined, and compared to current algorithms.
- 7 February 2026
- Published by World Scientific Pub Co Pte Ltd in Journal of Advanced Manufacturing Systems
- p. 1-40
Makespan Minimization in a Multi-Machine FMS with Tooling Constraints Considering Job and Tool Transfer Times Using Crow Search Algorithm
This paper addresses concurrent scheduling of machines, automated guided vehicles (AGVs), tools, and the tool transporter (TT) in a multi-machine flexible manufacturing system (FMS), considering tool and job transport times to minimize makespan (MKSN). However, due to financial constraints, only one copy of each tool type is offered. These tools are placed in a central tool magazine (CTM), which is shared with numerous machines. The problem is the allocation of machines, tool assignment, job-operation sequencing, and trip operations, including TT and AGVs’ empty and laden trip times for MKSN minimization. This study introduces a mixed nonlinear integer programming model to model the problem, and a crow search algorithm (CSA) based on the clever behavior of crows is used to solve it. Results are tabulated, examined, and compared to current algorithms.
- 30 September 2023
- Published by Korean Institute of Industrial Engineers in Industrial Engineering & Management Systems
- Vol. 22 (3) , 199-214
Concurrent Scheduling of Machines and Tools without Tool Delay in a Multi Machine FMS using Flower Pollination Algorithm
This paper deals with machines and tools joint scheduling in a multi-machine flexible manufacturing system to minimize makespan with the lowest possible copies of every type of tool without tool delay. The tools are placed in a central tool magazine that shares with and serves several machines. The problem is determining the lowest possible copies of every type of tool, allocation of tool copies to job-operations, and job-operations’ sequencing on machines without tool delay for makespan minimization. This paper proposes a nonlinear mixed integer programming formulation to model this simultaneous scheduling problem and flower pollination algorithm based on the flowers’ pollination process for solving this problem. The results have been tabulated, analyzed, and compared.
- 30 September 2023
- Published by Korean Institute of Industrial Engineers in Industrial Engineering & Management Systems
- Vol. 22 (3) , 199-214
Concurrent Scheduling of Machines and Tools without Tool Delay in a Multi Machine FMS using Flower Pollination Algorithm
This paper deals with machines and tools joint scheduling in a multi-machine flexible manufacturing system to minimize makespan with the lowest possible copies of every type of tool without tool delay. The tools are placed in a central tool magazine that shares with and serves several machines. The problem is determining the lowest possible copies of every type of tool, allocation of tool copies to job-operations, and job-operations’ sequencing on machines without tool delay for makespan minimization. This paper proposes a nonlinear mixed integer programming formulation to model this simultaneous scheduling problem and flower pollination algorithm based on the flowers’ pollination process for solving this problem. The results have been tabulated, analyzed, and compared.
- 30 September 2022
- Published by World Scientific Pub Co Pte Ltd in Journal of Advanced Manufacturing Systems
- Vol. 22 (03) , 477-512
Parallel Scheduling of Machines, Tool Transporter and Tools in a Multi Machine FMS with Alternative Routing Using Flower Pollination Algorithm
Scheduling jobs and tools is a significant problem for manufacturing systems. Inefficient job scheduling and tool loading planning may result in the underutilization of capital-intensive machines and a high machine idle time. Tools are transferred by a tool transporter (TT) between machines. Therefore, efficient scheduling of jobs, TT, and the tools with alternate machines enables a manufacturing system to increase machines’ utilization and decrease their idle times. This paper addresses machines, TT, and tools concurrent scheduling with alternate machines and only one copy of every tool variety is made available where the tools are costly, in a multi-machine flexible manufacturing system, taking into account tool transfer times for makespan (MS) minimization. The tools are placed in a central tool magazine, which shares and serves them to many machines to cut down the price of duplicating the tools in each machine. The problem is to assign machines from alternate machines, tools, and corresponding TT trips, including the deadheading trip and loaded trip, to job operations for MS minimization. This paper uses a nonlinear mixed-integer programming framework to present the problem, and a flower pollination algorithm (FPA) is employed to solve it. The results show that FPA outperforms the Jaya algorithm, and the usage of alternate machines for the operations reduces the MS. Reduction in MS indicates an improvement in utilization of resources.
- 30 September 2022
- Published by World Scientific Pub Co Pte Ltd in Journal of Advanced Manufacturing Systems
- Vol. 22 (03) , 477-512
Parallel Scheduling of Machines, Tool Transporter and Tools in a Multi Machine FMS with Alternative Routing Using Flower Pollination Algorithm
Scheduling jobs and tools is a significant problem for manufacturing systems. Inefficient job scheduling and tool loading planning may result in the underutilization of capital-intensive machines and a high machine idle time. Tools are transferred by a tool transporter (TT) between machines. Therefore, efficient scheduling of jobs, TT, and the tools with alternate machines enables a manufacturing system to increase machines’ utilization and decrease their idle times. This paper addresses machines, TT, and tools concurrent scheduling with alternate machines and only one copy of every tool variety is made available where the tools are costly, in a multi-machine flexible manufacturing system, taking into account tool transfer times for makespan (MS) minimization. The tools are placed in a central tool magazine, which shares and serves them to many machines to cut down the price of duplicating the tools in each machine. The problem is to assign machines from alternate machines, tools, and corresponding TT trips, including the deadheading trip and loaded trip, to job operations for MS minimization. This paper uses a nonlinear mixed-integer programming framework to present the problem, and a flower pollination algorithm (FPA) is employed to solve it. The results show that FPA outperforms the Jaya algorithm, and the usage of alternate machines for the operations reduces the MS. Reduction in MS indicates an improvement in utilization of resources.
- 6 April 2022
- Published by Wiley in Concurrency and Computation: Practice and Experience
- Vol. 34 (15)
Optimum scheduling of machines, automated guided vehicles and tools without tool delay in a multi‐machine flexible manufacturing system using symbiotic organisms search algorithm
This article deals with machines, automated guided vehicles (AGVs) and tools simultaneous scheduling in multimachine flexible manufacturing system (FMS) with the lowest possible number of copies of every tool type without tool delay considering jobs' transport times among machines to minimize makespan (MSN). The tools are kept in a central tool magazine (CTM), which is shared by and serves many machines. Tool transporter (TT) and AGVs shift tools and jobs among machines respectively. This concurrent scheduling problem is extremely complex in nature as it involves determining the lowest possible tool copies of every type of tool, allocation of AGVs and tools copies to job‐operations, job‐operations sequencing on machines, and associated trip operations including the dead heading trip and loaded trip times of AGVs. This paper proposes nonlinear mixed integer programming (MIP) formulation to model this problem and symbiotic organisms search algorithm (SOSA) for solving this problem. Verification is carried out using an industrial problem in a manufacturing firm. The results show that employing two copies for one tool type and one copy each for the remaining tool types results in no tool delay and reduction in MSN which causes a reduction in cost, and SOSA is providing better solution than Jaya algorithm.
- 6 April 2022
- Published by Wiley in Concurrency and Computation: Practice and Experience
- Vol. 34 (15)
Optimum scheduling of machines, automated guided vehicles and tools without tool delay in a multi‐machine flexible manufacturing system using symbiotic organisms search algorithm
This article deals with machines, automated guided vehicles (AGVs) and tools simultaneous scheduling in multimachine flexible manufacturing system (FMS) with the lowest possible number of copies of every tool type without tool delay considering jobs' transport times among machines to minimize makespan (MSN). The tools are kept in a central tool magazine (CTM), which is shared by and serves many machines. Tool transporter (TT) and AGVs shift tools and jobs among machines respectively. This concurrent scheduling problem is extremely complex in nature as it involves determining the lowest possible tool copies of every type of tool, allocation of AGVs and tools copies to job‐operations, job‐operations sequencing on machines, and associated trip operations including the dead heading trip and loaded trip times of AGVs. This paper proposes nonlinear mixed integer programming (MIP) formulation to model this problem and symbiotic organisms search algorithm (SOSA) for solving this problem. Verification is carried out using an industrial problem in a manufacturing firm. The results show that employing two copies for one tool type and one copy each for the remaining tool types results in no tool delay and reduction in MSN which causes a reduction in cost, and SOSA is providing better solution than Jaya algorithm.
- 25 February 2022
- Published by World Scientific Pub Co Pte Ltd in Journal of Advanced Manufacturing Systems
- Vol. 21 (04) , 813-836
Simultaneous Scheduling of Machines and Tools in a Multi-Machine FMS with Alternate Machines Using Crow Search Algorithm
Scheduling jobs and tools is a significant problem for manufacturing systems. Inefficient job scheduling and tool loading planning may result in under utilization of capital intensive machines and a high level of machine idle time. Therefore, efficient scheduling of jobs and tools enables a manufacturing system to increase machines’ utilization and decrease their idle times. This paper addresses machines’ and tools’ joint scheduling with alternate machines in a multimachine flexible manufacturing system (FMS) to minimize makespan (MSN). Only one copy of each type of tool is made available in FMS where tools are expensive. The tools are stored in the central tool magazine (CTM), which shares and serves them to several machines in order to reduce the cost of duplicating the tools in every machine. The problem is to select machines from alternate machines for job-operations, allocation of tools to the job-operations and job-operations’ sequencing on machines for MSN minimization. This paper presents nonlinear mixed integer programming (MIP) formulation to model this simultaneous scheduling problem and crow search algorithm (CSA) built on the crows’ intelligent behavior for solving this problem. The results show that CSA is providing better solutions than Jaya algorithm and the usage of alternate machines for the operations can reduce MSN.
- 25 February 2022
- Published by World Scientific Pub Co Pte Ltd in Journal of Advanced Manufacturing Systems
- Vol. 21 (04) , 813-836
Simultaneous Scheduling of Machines and Tools in a Multi-Machine FMS with Alternate Machines Using Crow Search Algorithm
Scheduling jobs and tools is a significant problem for manufacturing systems. Inefficient job scheduling and tool loading planning may result in under utilization of capital intensive machines and a high level of machine idle time. Therefore, efficient scheduling of jobs and tools enables a manufacturing system to increase machines’ utilization and decrease their idle times. This paper addresses machines’ and tools’ joint scheduling with alternate machines in a multimachine flexible manufacturing system (FMS) to minimize makespan (MSN). Only one copy of each type of tool is made available in FMS where tools are expensive. The tools are stored in the central tool magazine (CTM), which shares and serves them to several machines in order to reduce the cost of duplicating the tools in every machine. The problem is to select machines from alternate machines for job-operations, allocation of tools to the job-operations and job-operations’ sequencing on machines for MSN minimization. This paper presents nonlinear mixed integer programming (MIP) formulation to model this simultaneous scheduling problem and crow search algorithm (CSA) built on the crows’ intelligent behavior for solving this problem. The results show that CSA is providing better solutions than Jaya algorithm and the usage of alternate machines for the operations can reduce MSN.
- 27 October 2021
- Published by Springer Nature in Soft Computing
- Vol. 26 (3) , 1437-1458
Minimizing the total completion time on a multi-machine FMS using flower pollination algorithm
- 27 October 2021
- Published by Springer Nature in Soft Computing
- Vol. 26 (3) , 1437-1458
Minimizing the total completion time on a multi-machine FMS using flower pollination algorithm
- 23 October 2021
- Published by Taylor & Francis in Journal of Industrial and Production Engineering
- Vol. 39 (4) , 317-339
Integrated simultaneous scheduling of machines, automated guided vehicles and tools in multi machine flexible manufacturing system using symbiotic organisms search algorithm
This paper deals with machines, automated guided vehicles and tools simultaneous scheduling in multi-machine flexible manufacturing system considering jobs’ transport times among machines to minimize makespan. Only one copy of every tool type is made available due to economic restrictions. The tools are stored in central tool magazine that shares with and serves for several machines. This simultaneous scheduling problem is highly complex in nature as it involves the allocation of automated guided vehicles and tools to job-operations, job-operations sequencing on machines, and associated trip operations including the dead heading trip and loaded trip times of automated guided vehicles. This paper proposes symbiotic organisms search algorithm for solving this problem. An industrial problem in a manufacturing company is used for verification. The results show that SOSA is providing better solutions than Jaya algorithm, and the obtained schedule can be implemented practically with reduction in cost. Graphical abstract
- 23 October 2021
- Published by Taylor & Francis in Journal of Industrial and Production Engineering
- Vol. 39 (4) , 317-339
Integrated simultaneous scheduling of machines, automated guided vehicles and tools in multi machine flexible manufacturing system using symbiotic organisms search algorithm
This paper deals with machines, automated guided vehicles and tools simultaneous scheduling in multi-machine flexible manufacturing system considering jobs’ transport times among machines to minimize makespan. Only one copy of every tool type is made available due to economic restrictions. The tools are stored in central tool magazine that shares with and serves for several machines. This simultaneous scheduling problem is highly complex in nature as it involves the allocation of automated guided vehicles and tools to job-operations, job-operations sequencing on machines, and associated trip operations including the dead heading trip and loaded trip times of automated guided vehicles. This paper proposes symbiotic organisms search algorithm for solving this problem. An industrial problem in a manufacturing company is used for verification. The results show that SOSA is providing better solutions than Jaya algorithm, and the obtained schedule can be implemented practically with reduction in cost. Graphical abstract
- 18 January 2021
- Published by Taylor & Francis in International Journal of Computer Integrated Manufacturing
- Vol. 34 (2) , 153-174
Practical simultaneous scheduling of machines, AGVs, tool transporter and tools in a multi machine FMS using symbiotic organisms search algorithm
This paper addresses machines, automated guided vehicles (AGVs), tool transporter (TT) and tools simultaneous scheduling in a multi-machine flexible manufacturing system (FMS) to minimize makespan (MSN). The transfer times of tools and jobs are considered. Only one copy of each type of tool is made available due to economic restrictions. The tools are stored in a central tool magazine (CTM) that shares with and serves for several machines. Jobs and tools between machines are transferred by AGVs and TT, respectively. This simultaneous scheduling problem is highly complex in nature as it involves job-operations sequencing on machines, assigning AGVs and tools to job-operations and associated trip operations including the times of empty trip and loaded trip of both AGVs and TT. This paper presents nonlinear-mixed integer programming (MIP) formulation to model and symbiotic organisms search (SOS) algorithm based on the symbiotic interaction strategies that organisms use to survive in the ecosystem to solve this simultaneous scheduling problem. The results have been tabulated and analyzed. An industrial problem in a manufacturing company is used for verification and the result obtained by SOS algorithm is compared with other algorithm.
- 18 January 2021
- Published by Taylor & Francis in International Journal of Computer Integrated Manufacturing
- Vol. 34 (2) , 153-174
Practical simultaneous scheduling of machines, AGVs, tool transporter and tools in a multi machine FMS using symbiotic organisms search algorithm
This paper addresses machines, automated guided vehicles (AGVs), tool transporter (TT) and tools simultaneous scheduling in a multi-machine flexible manufacturing system (FMS) to minimize makespan (MSN). The transfer times of tools and jobs are considered. Only one copy of each type of tool is made available due to economic restrictions. The tools are stored in a central tool magazine (CTM) that shares with and serves for several machines. Jobs and tools between machines are transferred by AGVs and TT, respectively. This simultaneous scheduling problem is highly complex in nature as it involves job-operations sequencing on machines, assigning AGVs and tools to job-operations and associated trip operations including the times of empty trip and loaded trip of both AGVs and TT. This paper presents nonlinear-mixed integer programming (MIP) formulation to model and symbiotic organisms search (SOS) algorithm based on the symbiotic interaction strategies that organisms use to survive in the ecosystem to solve this simultaneous scheduling problem. The results have been tabulated and analyzed. An industrial problem in a manufacturing company is used for verification and the result obtained by SOS algorithm is compared with other algorithm.