SSScott Steinschneider

Scott Steinschneider

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Scott Steinschneider has a total of 86 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    On the Importance of Imbalance‐Aware Evaluation for Edge‐Of‐Field Runoff Prediction: A Commentary on Ford et al. (2022)

    by M. S. Jahangir, S. Steinschneider

    Field‐scale runoff prediction is critical for managing nutrient losses. Ford et al. (2022, https://doi.org/10.1029/2022gl100667 ) present an innovative hybrid modeling and regionalization framework that integrates cluster analysis, National Water Model (NWM) outputs, and machine learning to extend edge‐of‐field (EOF) runoff prediction across the Great Lakes region. In this commentary, we highlight a methodological challenge common in EOF event prediction: when runoff events are rare relative to non‐events, accuracy‐based evaluation can obscure poor event detection. We show that the primary gains in runoff event detection stem from training strategies tailored to datasets dominated by non‐runoff days, with the inclusion of additional soil and meteorological information providing further, complementary improvements while maintaining reasonable overall accuracy. Our results reinforce the promise of the Ford et al. framework, while emphasizing the need for event‐centered evaluation when developing EOF prediction models.

  • Open Access

    Knowledge Distillation for Improving Deep Learning‐Based Hydrological Prediction and Fine‐Tuning

    by M. S. Jahangir, J. Quilty, S. Steinschneider, J. Adamowski

    This paper introduces knowledge distillation (KD) as a method for improving deep learning (DL)‐based hydrological prediction. The performance of DL models, including long short‐term memory networks (LSTMs), is highly dependent on model structure and training data quality, posing challenges for transfer learning. In the KD framework, a better “teacher” model, trained with higher‐quality input data or constructed as an ensemble, is used to guide the training of a weaker “student” model. This enables improved performance in situations where input data quality or computational resources are limited. We demonstrate the effectiveness of KD in two experiments conducted across 421 catchments throughout the contiguous United States, where LSTM models use daily basin‐averaged meteorological forcings to predict daily streamflow. In the first experiment, KD was applied to improve streamflow prediction when lower‐quality ERA5‐Land reanalysis meteorological inputs were used instead of higher‐quality Daymet observations. This experiment is relevant to forecasting applications, where lower quality (e.g., lower resolution) precipitation forecasts are used to force a DL‐based hydrologic model optimized with high‐resolution observed precipitation. Results demonstrate that KD leads to substantial performance improvements, especially for catchments not used in training (>25% improvement in median Nash‐Sutcliffe efficiency (NSE)). In the second experiment, KD is applied for model compression, distilling the knowledge of an ensemble of five LSTM models into a single model that substantially outperforms LSTMs trained without KD. These findings underscore the value of KD in optimizing DL models for hydrological prediction, offering a model‐agnostic and scalable approach that facilitates efficiency and model transferability.

  • Deep learning error post-processing improves stochastic watershed modeling

    by Benjamin Manoli, Sandeep Poudel, David K. Koval, Sarah Y. Murphy, Scott Steinschneider, Jonathan Lamontagne


  • Open Access

    Characterizing Improvements in Ensemble Forecast Performance Over the Last Decade: A Retrospective Analysis of the Hydrologic Ensemble Forecast Service (HEFS)

    by M. C. Allen, S. Steinschneider

    Hydrologic forecasts are essential for mitigating water‐related risks. However, little work has explored whether operational ensemble forecasts have improved over time, particularly with respect to probabilistic performance and in cases with limited data. This study contributes a retrospective analysis of short‐ and medium‐range (1–14 days ahead) streamflow forecasts issued by the California Nevada River Forecast Center (RFC) at 97 sites between water years 2014–2025, using the National Weather Service (NWS)'s Hydrologic Ensemble Forecast Service (HEFS). We develop a novel and generalizable hierarchical Bayesian model to partially pool data across sites and quantify regional trends in deterministic and probabilistic forecast performance. Results suggest improved performance for moderate and high flow events, potentially linked to meteorological model upgrades and enhanced data assimilation. However, the degree of improvement depends on performance metric and lead time, with stronger trends for deterministic performance at shorter leads and only weak evidence for improvements in attributes of ensemble spread.

  • Open Access

    Global Parameter Sensitivity in Forecast‐Informed Reservoir Operations Using Model Predictive Control

    by Alexander B. Chen, Jonathan D. Herman, Zachary P. Brodeur, Scott Steinschneider, Brett Whitin

    Hydrologic forecasts have demonstrated considerable benefits for flood risk reduction and water supply operations in specific basins. However, it remains unclear how these benefits depend on key parameters of the reservoir infrastructure and forecasts. In this study, we propose a global sensitivity and threshold analysis framework using Model Predictive Control (MPC) to evaluate the ability of forecast‐informed operations to safely manage large floods while also improving water supply storage. The approach is demonstrated for six major reservoirs in California using daily ensemble hydrologic forecasts. We first benchmark MPC performance with ensemble forecasts against a baseline policy (no forecast) and a perfect forecast policy. We then perform global sensitivity analysis using Decision Tree (DT) classifiers to assess the impact of maximum release, ramping rate, and available forecast lead time on the required flood pool for the event of record across all sites. This large parameter sample reflects many potential reservoir configurations and scaled events. We find that the ensemble forecast release sequence captures most of the value of a perfect forecast release sequence, but this value is highly sensitive to parameters. The classifiers accurately predict the extent of flood pool reduction and identify maximum release as the most important feature for both ensemble and perfect forecast release sequences. Finally, we extract generalized parameter thresholds from the DT classifier across all reservoirs, identifying conditions required to achieve varying levels of flood pool reduction. Overall, this framework represents an efficient screening tool to identify system properties where forecast‐informed policies likely provide the greatest benefits.


  • Open Access

    The relative influences of hydrologic information and dams’ hydropower scheduling decisions on electricity price forecasts

    by Henry Ssembatya, Jordan D. Kern, Nathalie Voisin, Scott Steinschneider, Daniel Broman

  • Open Access

    How Hydropower Operations Mitigate Flow Forecast Uncertainties to Maintain Grid Services in the Western U.S.

    by Daniel Broman, Nathalie Voisin, Scott Steinschneider, Jordan Kern, Henry Ssembatya, Sungwook Wi

    Hydropower facilities represent a key electricity generating resource in the U.S. Western Interconnection. These facilities rely upon forecasts of inflow when scheduling releases to generate electricity. However, hydropower operations represented in bulk power systems models do not reflect uncertainty in inflow forecasts. This study aims to evaluate how inflow forecast uncertainties impact hydropower generation and revenues at the scale of an entire power grid at a spatial scale relevant to power system modeling. The question is critical and timely as more flexibility is called upon to integrate other technologies without understanding the flexibility already exercised. New advances are needed to represent hydropower contributions under operational uncertainty at the interconnection scale. Our contribution includes the development of consistent and coincident medium‐range (0–7 days) inflow forecasts and a generic hydropower scheduler, Forecast‐Informed Scheduler for Hydropower (FIScH), that captures non‐powered water management objectives and constraints and allows for varying electricity prices. This scheduler was applied at 242 hydropower facilities representing 86% of the conventional nameplate capacity in the Western Interconnection. Hydropower revenues were examined for schedules developed using three sets of inflow forecasts with differing levels of accuracy over a 20‐year period from 2000 to 2019. In aggregate, we find that annual hydropower revenue decreases 0.08% when using more skillful forecasts, and 0.11% when using baseline persistence forecasts as compared to revenue using perfect forecasts. Regional and interannual results were more varied and ranged between −1 and 4%. The translation of improved forecast skill into higher revenues is non‐linear and varies regionally, with larger revenue changes on the west coast and smaller responses across the interior western U.S. Overall, we demonstrate that scheduling mostly alleviates the impact of inflow forecast errors on hydropower revenue. The study motivates the need for a more detailed evaluation into which specific hydrologic events impact hydropower scheduling and revenue at the system scale.

  • Energy system vulnerabilities in a zero-emission grid: The role of climate variability and technology uncertainty

    by M. Vivienne Liu, Vivek Srikrishnan, Kenji Doering, Elnaz Kabir, Scott Steinschneider, C. Lindsay Anderson


  • Open Access

    Global Parameter Sensitivity in Forecast-Informed Reservoir Operations using Model Predictive Control

    by Alexander B Chen, Jonathan D Herman, Zachary Paul Brodeur, Scott Steinschneider, Brett Whitin

    Hydrologic forecasts have demonstrated considerable benefits for flood risk reduction and water supply operations in specific basins. However, it remains unclear how these benefits depend on key parameters of the reservoir infrastructure and forecasts. In this study, we propose a global sensitivity and threshold analysis framework using Model Predictive Control (MPC) to evaluate the effectiveness of forecast-informed operations, measured by reductions in the required flood pool size during large floods. The approach is demonstrated for six major reservoirs in California using daily ensemble hydrologic forecasts. We first benchmark MPC performance with ensemble forecasts against a baseline policy (no forecast) and a perfect forecast policy. We then perform global sensitivity analysis using Decision Tree (DT) classifiers to assess the impact of maximum release, ramping rate, and available forecast lead time on the required flood pool for the event of record across all sites. This large parameter sample reflects many potential reservoir configurations and scaled events. We find that the ensemble forecast policy captures most of the value of a perfect forecast policy, but this value is highly sensitive to parameters. The classifiers accurately predict the extent of flood pool reduction and identify maximum release as the most important feature for both ensemble and perfect forecast policies. Finally, we extract generalized parameter thresholds from the DT classifier across all reservoirs, identifying conditions required to achieve varying levels of flood pool reduction. Overall, this framework represents an efficient screening tool to identify system properties where forecast-informed policies likely provide the greatest benefits.