YTYu Ting Tai

Yu Ting Tai

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Yu Ting Tai has a total of 16 co-authors. Here are the top co-authors by number of shared publications:

  • W. L. Pearn

    National Chiao Tung University, Hsinchu, Taiwan, ROC

    7 shared publications
  • W.L. Pearn

    Department of Industrial Engineering and Management National Chiao Tung University Hsinchu Taiwan, ROC

    3 shared publications
  • C. H. Wu

    National Chiao Tung University, Hsinchu, Taiwan, ROC

    2 shared publications
  • Chia Huang Wu

    Department of Industrial Engineering & Management, National Chiao Tung University, Hsinchu, Taiwan

    1 shared publication
  • Chia-Huang Wu

    Department of Industrial Engineering and Management National Yang Ming Chiao Tung University Hsinchu Taiwan (ROC)

    1 shared publication
  • Chun-Mei Lai

    Department of Marketing and Logistics Management , Far East University , Tainan, Taiwan, ROC

    1 shared publication

Latest Publications

  • Improved profit model for production of MicroLED PCB with asymmetric specifications

    by C. H. Wu, W. L. Pearn, Y. T. Tai

    Due to strict requirements for high-tech processes, yield is an essential performance measure of quality output and affects production economics significantly. Yield is a performance index that significantly influences the optimal decision on profit and production quantity. For instance, in micro light-emitting diodes (MicroLED) manufacturing, the yield of surface mounting highly affects the production cost. To guarantee the production decision is reliable, accurately evaluating yields is crucial. However, the existing yield evaluation method for asymmetric processes with a very low fraction of defective by process capability index is conservative and may mislead the decisions. In this paper, a revised unbiased estimator is investigated and a weighted parametric bootstrap method for accurate production decision making is provided. With extensive comparisons, the proposed method outperforms the existing analytical method and considerably improves the precision of yield evaluation. We also provided managerial insights for a profit with various yield measure methods. For demonstration, an application of production yield determination for a printed circuit board process for MicroLED is presented.

  • An Improved Manufacturing Yield Measure for Gold Bumping Processes With Very Low Nonconformities

    by C. H. Wu, W. L. Pearn, Y. T. Tai

    Nowadays, thinner and slimmer smartphones, have been widely applied in daily life. In most portable devices, LCD driver IC or new touch display driver IC (TDDI) are critical components in which the gold bumping process is used as an essential interconnection technology and usually outsource to out-sourced assembly and testing (OSAT) factories. In semiconductor packaging manufacturing, due to popular high-definition requirements of display devices, gold bumping processes require very low fraction of nonconformities. For this reason, accurately evaluating the manufacturing yield is very important to guarantee the quality requirements being met. To evaluate yield of gold bumping processes, the most popular yield index pk C is widely employed in outsourcing contract arrangements. However, the typical existing nature estimator is a biased estimator and more conservative. In this paper, we provide an unbiased estimator to evaluate gold bumping manufacturing yield more accurately. Based on the new estimator, we further propose a weighted parametric bootstrap method to obtain a reliable lower confidence bound that is closer to true manufacturing yield. The new yield assessment can avoid underestimating the gold bumping manufacturing yield and can make more reliable decisions.


  • Power analysis for group supplier selection with multiple production lines

    by W.L. Pearn, Y.T. Tai, Yu‐Wen Wu, Yuan‐An Wang

    Group supplier selection problem is a critical problem because outsourcing is an important issue for supply chain management. For the advanced production processes with extremely low fraction of defectives, typical supplier selection methods no longer work because any sample of reasonable size probably contains no defective items. Thus, process capability indices have been extensively used for advanced production processes to evaluate and measure whether the process meets the specifications and they also provide quality assurance. In the globally competitive production environment, processes involving multiple production lines are quite common due to economies of scale considerations. In this paper, we consider a group supplier selection problem for multi‐supplier and multi‐line, in which a supplier group containing the best suppliers is selected based on a multi‐line yield index . To avoid the inflation of multiple comparisons, we apply the Bonferroni method and subtraction test statistic to tackle the group supplier selection problem. Critical values for testing procedure and required sample sizes for designated selection powers are obtained and tabulated. In addition, we apply multiple comparisons with the best method and compare the selection powers with the Bonferroni method for various power settings to provide more accurate group supplier decisions for real‐world applications.


  • An analytical closed-form solution for multiple line supplier selection problem

    by W. L. Pearn, Y. T. Tai, S. C. Tseng

    Supplier selection is an essential issue, particularly, for semiconductor manufacturing. Nowadays, since high demands in the globally competitive semiconductor manufacturing environment, multiple-line processes are quite commonly applied. In the paper, we consider a two-stage method composing of quality verification and selection decision for multiple-line supplier selection problems. Since quality performance is an important criterion in supplier selection, we test whether the new supplier has a significantly better capability than the existing supplier based on the multiple-line yield index CpkM in the stage of quality verification. In selection decision, when the magnitude of capability outperformance is significant, switching contracts to a new entrant supplier is suggested. In addition, analytical closed-form solutions for asymptotical critical values and required sample sizes are derived and tabulated for the investigated multiple-line supplier selection problem. We demonstrate the applicability of the proposed supplier selection method by presenting a real-world example taken from a semiconductor packaging shop floor located in the Science-based Industrial Park in Hsinchu, Taiwan.


  • Lower confidence bounds as precision measure for truncated processes

    by Chia Huang Wu, Wen Lea Pearn, Yu Ting Tai, Pi Chuan Lin

    Process capability index Cp has been the most popular one used in the manufacturing industry to provide numerical measures on process precision. For normally distributed processes with automatic fully inspections, the inspected processes follow truncated normal distributions. In this article, we provide the formulae of moments used for the Edgeworth approximation on the precision measurement Cp for truncated normally distributed processes. Based on the developed moments, lower confidence bounds with various sample sizes and confidence levels are provided and tabulated. Consequently, practitioners can use lower confidence bounds to determine whether their manufacturing processes are capable of preset precision requirements.


  • Group Supplier Selection for Multiple-Line Gold Bumping Processes

    by W. L. Pearn, Y. T. Tai

    Portable devices have been popularly used nowadays. Liquid crystal display driver integrated circuit is an essential component in portable devices in which gold bumping process is a critical interconnection technology. To enhance bargaining power and to reduce cost, group suppliers are commonly selected from multiple suppliers. For high-definition display devices, a very low fraction of defectives is the basic quality requirement in gold bumping processes. Unfortunately, conventional yield measurement methods for supplier selection no longer work since any sample of reasonable size probably contains no defective gold bump product items. In this paper, we propose a group supplier selection procedure for multiple suppliers with multiple-line processes that are quite common due to high demands in semiconductor industry. For various significance levels, the number of suppliers, the number of manufacturing lines, predetermined capability requirements, and sample sizes, different selected suppliers are suggested based on the multiple-line yield index CpkM. In addition, the power comparisons between different methods are also discussed. For the illustration purpose, real-world applications in a gold bumping factory that is located in the Science-Based Industrial Park in Hsinchu, Taiwan, are included.


  • A note on production yield measure for multiple lines

    by W. L. Pearn, Y. T. Tai, C. H. Wu

    In today’s globally competitive environment, processes involving multiple manufacturing lines are quite common due to economies of scale considerations. Production yield measure indices Cpk and Cpu are the most popular yield-based indices and have been widely used in manufacturing industries for two-sided and one-sided specification limits, respectively. In this paper, two production yield indices for multiple lines and are considered and the approximate distributions of two natural estimators and are derived. For the convenience of industry applications, the lower confidence bounds and critical values are provided.


  • Manufacturing Yield for Multiple Lines Gold Bumping Processes With Asymmetric Tolerances

    by Y. T. Tai

    Development of touch display driver IC (TDDI) has enabled slimmer smartphone design by virtue of the integration of touch controller and display driver ICs (DDIs) into a single chip. TDDI plays an important role in touch integrated display panels. Compared to conventional DDI, TDDI requires more bonding pads for touch applications, thus increasing the usage of gold. The requirement to keep costs down forces manufacturers to look for ways to reduce the usage of gold. In order to reduce the usage of gold, gold bumping processes with asymmetric tolerances are considered, in which deviations from the target are less tolerable in lower specification limits than in upper specification limits. In addition, due to economies of scale considerations, gold bumping processes involving multiple manufacturing lines are commonly considered in Taiwan. However, no yield index has been developed for multiple-line gold bumping processes with asymmetric tolerances. In this paper, we propose a new yield index C" pk M and derive an approximate distribution of Ĉ" pk M . In addition, the lower confidence bounds and critical values are provided for the multiple-line gold bumping processes with asymmetric tolerances. For illustration purposes, a real-world application in a gold bumping factory which is located in the Science-Based Industrial Park in Hsinchu, Taiwan, is presented.


  • The burn-in test scheduling problem with batch dependent processing time and sequence dependent setup time

    by W.L. Pearn, J.S. Hong, Y.T. Tai

    The burn-in test scheduling problem (BTSP) is a variation of the complex batch processing machine scheduling problem, which is also a generalisation of the liquid crystal injection scheduling problem with incompatible product families and classical identical parallel machine problem. In the case we investigated on the BTSP, the jobs are clustered by their product families. The product families can be clustered by different product groups. In the same product group, jobs with different product families can be processed as a batch. The batch processing time is dependent on the longest processing time of those jobs in that batch. Setup times between two consecutive batches of different product groups on the same batch machine are sequentially dependent. In addition, the unequal ready times are considered in the BTSP which involves the decisions of batch formation and batch scheduling in order to minimise the total machine workload without violating due dates and the limited machine capacity restrictions. Since the BTSP involves constraints on unequal ready time, batch dependent processing time, and sequence dependent setup times, it is more difficult to solve than the classical parallel batch processing machine scheduling problem with compatible product families or incompatible product families. These restrictions mean that the existing methods cannot be applied into real-world factories directly. Consequently, this paper proposes a mixed integer programming model to solve the BTSP exactly. In addition, two efficient solution procedures which solve the BTSP are also presented.


  • Cycle time estimation for semiconductor final testing processes with Weibull-distributed waiting time

    by Y.T. Tai, W.L. Pearn, J.H. Lee

    Accurate cycle time is an essential planning basis required for many production applications, especially on due date commitments, performance metrics analysing, capacity planning, and scheduling. The re-entrant final testing process is the final stage of the complicated semiconductor manufacturing process. To enhance the ability of quick responses and to achieve better on-time delivery in final testing factories, it is essential to develop an accurate cycle time estimation method. In this paper, we provide a statistical approach to calculate the cycle time for multi-layer semiconductor final testing involving the sum of multiple Weibull-distributed waiting times. In addition, percentiles of the cycle time are obtained which are useful to industrial practitioners for due date commitments satisfying the targeted on-time delivery rate. To demonstrate the applicability of the proposed cycle time estimation model, a real example in a semiconductor final testing factory which is located on the Science-based Industrial Park in Hsinchu, Taiwan, is presented.